TOP GLOVE VIETNAM 8.

1-P&S 1/14

BILL 8.1 - PLUMBING AND SANITARY SYSTEM


Addendum 2
Total TOTAL
Total UNIT PRICE (VND) AMOUNT (VND)
Item. DESCRIPTION UNIT UNIT PRICE AMOUNT
QUANTITY
Material Labor (VND) Material Labor (VND)
I Water Supply -
Supply, delivery and installation of FRP assembly Tank
- complete with valves, Tank structural support, ladder,
1
level indicator, Level switch, Man Hole c/w lockable
cover, Air Vent, Flanges, fittings and accessories
Rain harvesting tank for flushing at Flat Roof
i lot 1 - - - -
Effective volume: 75 m3
Production water storage tank at Mezzanine 1
ii lot 1 - - - -
Effective volume: 120 m3
Production & Domestic tank at Ground floor
iii lot 1 - - - -
Effective volume: 230 m3
Supply, delivery and installation of Transfer pumps to
water storage Tank complete with control panels,
2 vibration isolation, Power/ Control Wiring for Pumps,
Valves, connection pipes to Roof Tank and all
necessary accessories
Transfer pump P.TP-01/02.
i set 2 - - - -
Q= 75 m3/h, H= 30mH

ii Control panel for Transfer pumps set 1 - - - -

iii Power/ Control Wiring lot 1 - - - -

iv Anti-vontex plate DN80 set 1 - - - -

v Foot valve DN80 set 1 - - - -

vi Y Strainer DN80 set 2 - - - -

vii Gate valve DN80 set 12 - - - -

viii Modulating Float valve DN80 set 1 - - - -

ix Check valve DN80 set 2 - - - -

x Pressure gauge c/w syphone, ball valve set 4 - - - -

xi Level switch set 1 - - - -

xii Flexible Joint DN80 set 4 - - - -

xiii Pipe PPR - DN80 m 176 - - - -

xiv Pipe PPR - DN50 m 10 - - - -


Pipe G.I - DN125 protect for U/G pipe cross the
xv m 18 - - - -
street

xvi Pipe fittings lot 1 - - - -


Excavation & making good of the land for
xvii lot 1 - - - -
underground pipe

xviii Hangering/supporting and accessories lot 1 - - - -


Supply, delivery and installation of Booster pumps
system - complete with control panels, pressure
3 vessel, vibration isolation, Power/ Control Wiring for
Pumps, Valves, connection pipes and all necessary
accessories
Booster pump D.BP-01/02.
i set 2 - - - -
Q= 30.3 m3/h, H= 45mH
ii Pressure tank V=100L set 1 - - - -
iii Control panel for Booster pumps set 1 - - - -
iv Power/ Control Wiring lot 1 - - - -
v Anti-vontex plate DN50 set 1 - - - -
vi Foot valve DN50 set 1 - - - -
vii Y Strainer DN50 set 2 - - - -
viii Gate valve DN50 set 9 - - - -
ix Sub water meter DN50 set 1 - - - -
Gate valve DN100 (For overflow line of tank at
x set 1 - - - -
mezzanine 1 floor)
xi Gate valve DN32 set 2 - - - -
xii Solenoid valve (On - Off) set 1 - - - -
xiii Level switch set 2 - - - -
xiv Modulating Float valve DN50 set 1 - - - -
TOP GLOVE VIETNAM 8.1-P&S 2/14

BILL 8.1 - PLUMBING AND SANITARY SYSTEM


Addendum 2
Total TOTAL
Total UNIT PRICE (VND) AMOUNT (VND)
Item. DESCRIPTION UNIT UNIT PRICE AMOUNT
QUANTITY
Material Labor (VND) Material Labor (VND)
xv Check valve DN50 set 2 - - - -
xvi Pressure gauge c/w syphone, ball valve set 5 - - - -
xvii Flexible Joint DN50 set 4 - - - -
xviii Pressure switch c/w syphone, ball valve set 1 - - - -
Pipe PPR - DN100 (Overflow pipe of tank at
xix m 14 - - - -
Mezzanine1 floor)
xx Pipe PPR - DN50 m 115 - - - -
xxi Pipe PPR - DN32 m 107 - - - -
xxii Pipe PPR - DN25 m 83 - - - -
xxiii Pipe PPR - DN20 m 108 - - - -
Pipe G.I - DN80 protect for U/G pipe cross the
xxiv m 18 - - - -
street
xxv Pipe fittings lot 1 - - - -
Excavation & making good of the land for
xxvi lot 1 - - - -
underground pipe
xxvii Hangering/supporting and accessories lot 1 - - - -

Supply, delivery and installation of water supply


pipework from connect point water city complete with
sleeve pipe, supports, valves, taps, pipes, flow
4
switchs, fittings, meter chamber, anchor block/
haunching for underground pipe, excavation & making
good of the land in the area of work and accessories
Electromagnetic water meter chamber c/w water
meter DN100, gate valve, check valve, flexible,
i set 1 - - - -
Power/ Control Wiring and all necessary
accessories
Irrigation Hose Bibb c/w SUS Steel box and all
ii set 11 - - - -
necessary accessories
iii Gate valve DN100 set 2 - - - -
iv Gate valve DN25 set 1 - - - -
v Gate valve DN20 set 3 - - - -
vi Water tap DN20 set 6 - - - -
vii Modulating Float valve DN100 set 2 - - - -
Gate valve DN100 (For future connection) c/w
viii set 1 - - - -
chamber, cover and all necessary accessories

ix Pressure gauge c/w syphone, ball valve set 1 - - - -


x Pipe HDPE - DN100 m 624 - - - -
xi Pipe HDPE - DN25 m 16 - - - -
xii Pipe HDPE - DN20 m 95 - - - -
xiii Pipe fittings lot 1 - - - -
Excavation & making good of the land for
xiv lot 1 - - - -
underground pipe
xv Hangering/supporting and accessories lot 1 - - - -
Supply, delivery and installation of water supply
pipework for toilet WC1 complete with sleeve pipe,
supports, valves, pipes, fittings, anchor block/
5
haunching for underground pipe, excavation & making
good of the land in the area of work and all necessary
accessories
i Gate valve DN50 set 1 - - - -
ii Gate valve DN25 set 4 - - - -
iii Pressure gauge c/w syphone, ball valve set 1 - - - -
v Flow meter DN32 set 1 - - - -
vi Pipe PPR - DN32 m 7 - - - -
vii Pipe PPR - DN25 m 18 - - - -
viii Pipe PPR - DN20 m 5 - - - -
ix Pipe PPR - DN15 m 82 - - - -
x Pipe fittings lot 1 - - - -
xi Hangering/supporting and accessories lot 1 - - - -
TOP GLOVE VIETNAM 8.1-P&S 3/14

BILL 8.1 - PLUMBING AND SANITARY SYSTEM


Addendum 2
Total TOTAL
Total UNIT PRICE (VND) AMOUNT (VND)
Item. DESCRIPTION UNIT UNIT PRICE AMOUNT
QUANTITY
Material Labor (VND) Material Labor (VND)
Supply, delivery and installation of water supply
pipework for toilet WC2 complete with sleeve pipe,
supports, valves, pipes, fittings, anchor block/
6
haunching for underground pipe, excavation & making
good of the land in the area of work and all necessary
accessories

i Gate valve DN25 set 4 - - - -


ii Pressure gauge c/w syphone, ball valve set 1 - - - -
iii Flow meter DN32 set 1 - - - -
iv Pipe PPR - DN32 m 5 - - - -
v Pipe PPR - DN25 m 30 - - - -
vi Pipe PPR - DN20 m 18 - - - -
vii Pipe PPR - DN15 m 89 - - - -
viii Pipe fittings lot 1 - - - -
ix Hangering/supporting and accessories lot 1 - - - -

To liaise and plan submission to the Authority including


7 all necessary cost for the connection to the Industrial lot 1 - - - -
Park existing Water supply system

II Sanitary Drainage -

Supply, delivery and installation of Piping for production


1 drainage system for product complete with connecting
to manhole, supporting, fitting and accessories

i Floor Trap DN100 set 30 - - - -


ii Floor Clean Out DN100 set 3 - - - -
iii Pipe HDPE DN100 m 489 - - - -
iv Pipe HDPE fittings lot 1 - - - -
v Protect for U/G pipe cross the street lot 1 - - - -
Excavation & making good of the land for
vi lot 1 - - - -
underground pipe
vii Hangering/supporting and accessories lot 1 - - - -
Supply, delivery and installation of Piping for sanitary
drainage system for product complete with connecting
2
to inspection chambers/ manhole, supporting, fitting
and accessories
i Floor Trap DN80 set 6 - - - -
ii Vent cowl set 2 - - - -
iii Pipe uPVC DN200 m 6 - - - -
iv Pipe uPVC DN150 m 62 - - - -
v Pipe uPVC DN100 m 89 - - - -
vi Pipe uPVC DN80 m 91 - - - -
vii Pipe uPVC DN50 m 22 - - - -
viii Pipe uPVC DN32 m 15 - - - -
ix Pipe uPVC fittings lot 1 - - - -
Excavation & making good of the land for
x lot 1 - - - -
underground pipe
xi Hangering/supporting and accessories lot 1 - - - -

Supply, delivery and installation of Piping for sanitary


drainage system Toilet WC1 complete with connecting
3
from sanitaryware to main drain pipe, comprising soil,
waste and vent pipes, fitting and accessories

i Pipe uPVC DN100 m 84 - - - -


ii Pipe uPVC DN80 m 41 - - - -
iii Pipe uPVC DN50 m 12 - - - -
iv Pipe uPVC DN32 m 6 - - - -
v Pipe fittings m 1 - - - -
Excavation & making good of the land for
vi lot 1 - - - -
underground pipe
vii Hangering/supporting and accessories lot 1 - - - -
TOP GLOVE VIETNAM 8.1-P&S 4/14

BILL 8.1 - PLUMBING AND SANITARY SYSTEM


Addendum 2
Total TOTAL
Total UNIT PRICE (VND) AMOUNT (VND)
Item. DESCRIPTION UNIT UNIT PRICE AMOUNT
QUANTITY
Material Labor (VND) Material Labor (VND)
Supply, delivery and installation of Piping for sanitary
drainage system Toilet WC2 complete with connecting
4
from sanitaryware to main drain pipe, comprising soil,
waste and vent pipes, fitting and accessories

i Pipe uPVC DN125 m 7 - - - -


ii Pipe uPVC DN100 m 25 - - - -
iii Pipe uPVC DN80 m 17 - - - -
iv Pipe uPVC DN50 m 46 - - - -
v Pipe uPVC DN40 m 5 - - - -
vi Pipe uPVC DN32 m 6 - - - -
vii Pipe fittings m 1 - - - -
viii Hangering/supporting and accessories lot 1 - - - -

To liaise and plan submission to the Authority including


5 all necessary cost for the connection to the Industrial lot 1 - - - -
Park existing Drainage system

III Fire stopping -

Supply, delivery and installation of Fire-stopping services for


lot 1 - - - -
penetration pipes through walls/floor slabes

IV Testing and Commissioning of Plumbing & Sanitary system -


To carry out of Testing and Commissioning for Plumbing &
lot 1 - - - -
Sanitary system

V Service, Maintenance and Warranty -


Services, Maintenance and Warranty during defects liability
or maintenance period shall include the supply of all labour,
materials, tools, transport and everything necessary to carry lot 1 - - - -
out monthly scheduled servicing and maintenance as
specified.

VI ANY OTHER WORKS -

TOTAL CARRIED TO SUMMARY OF (Excluding -


Commercial Tax)
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 5/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
PLUMBING, SANITARY
1 Labourers – labour per day
2 Plumbers – labour per day
3 Supervisor/Engineer per day
4 Certified Welders per day
5 Licensed Plumber per day
6 Cold water pipework including fittings and supports installed (but
less excavation and backfilling):
a) Polypropylene random pipes installed complete with fittings
of nominal size:
i) 15mm dia per m
i) 20mm dia per m
ii) 25mm dia per m
iii) 32mm dia per m
iv) 40mm dia. per m
v) 50mm dia. per m
vi) 65mm dia. per m
vii 80mm dia. per m
viii 100mm dia. per m
ix 125mm dia. per m
x 150mm dia. per m
xi 200mm dia. per m
7 Hot water pipework including fittings and supports installed (but
less excavation and backfilling):
a) Polypropylene random pipes installed complete with fittings
of nominal size:
i) 15mm dia per m
i) 20mm dia per m
ii) 25mm dia per m
iii) 32mm dia per m
iv) 40mm dia. per m
v) 50mm dia. per m
vi) 65mm dia. per m
vii 80mm dia. per m
viii 100mm dia. per m
ix 125mm dia. per m
x 150mm dia. per m
xi 200mm dia. per m
8 Cold water valves installed,
a) Stop Valves of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 6/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
xi) 200mm dia. each
b) Sluice Valves/Gate Valves of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
c) Check Valves installed of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
d) Float Operated Valves installed of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
e) Pressure Reducing Valves installed of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 7/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
f) Pilot operated float valves installed, of nominal size
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
g) Strainers installed, of nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. each
v) 40mm dia. each
vi) 50mm dia. each
vii) 65mm dia. each
viii) 80mm dia. each
ix) 100mm dia. each
x) 150mm dia. each
xi) 200mm dia. each
h) Constant flow regulators installed, for flow rate,
i) 3 l/min each
ii) 6 l/min each
iii) 9 l/min each
iv) 12 l/min each
9 Sanitary pipework including fittings and supports installed (but
less excavation and backfilling):
a) High density polyethylene pipes for belowground use,
installed, for nominal size,
i) 80mm dia. per m
ii) 100mm dia. per m
iii) 150mm dia. per m
iv) 200mm dia. per m
v) 225mm dia. per m
vi) 250mm dia. per m
b) uPVC pipes for aboveground use, installed, for nominal size,
i) 15mm dia. each
ii) 20mm dia. each
iii) 25mm dia. each
iv) 32mm dia. per m
v) 40mm dia. per m
vi) 50mm dia. per m
vii) 80mm dia. per m
viii) 100mm dia. per m
ix) 150mm dia. per m
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 8/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
x) 200mm dia. per m
xi) 250mm dia. per m
c) Vitrified clay (stoneware) pipes for belowground use,
installed, for nominal size,
i) 100mm dia. per m
ii) 150mm dia. per m
iii) 200mm dia. per m
iv) 225mm dia. per m
v) 250mm dia. per m
10 Condensate drain pipe, including fittings, supports, painting;
installed (but less insulation, excavation and backfilling)
a) uPVC pipes with brazed joints, installed, of diameter
i) 28mm per m
ii) 35mm per m
iii) 42mm per m
iv) 54mm per m
v) 67mm per m
vi) 76mm per m
vii) 108mm per m
11 Condensate drain pipework insulation, installed, complete with
aluminium foil vapour barrier but less jacketting or cement
plaster, as addition to .13
a) Preformed Koolphen phenolic foam, 20mm thick, for
condensate drain pipe diameter of:
i) 28mm per m
ii) 35mm per m
iii) 42mm per m
iv) 54mm per m
v) 67mm per m
vi) 76mm per m
vii) 108mm per m
12 Additional works for underground pipework
a) Excavation and backfilling of trench, including shoring where
necessary of depth,
i) 0.5m per m
ii) 1.0m per m
iii) 1.5m per m
iv) 2.0m per m
v) 2.5m per m
vi) 3.0m per m
vii) 3.5m per m
viii) 4.0m per m
ix) 4.5m per m
x) 5.0m per m
xi) 5.5m per m
xii) 6.0m per m
xiii) 6.5m per m
xiv) 7.0m per m
b) Sand-bedding per m
c) Concrete haunching per m
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 9/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
d) 100mm dia. Bakau piling driven in bottom of trench, of piling
depth,
i) 1.0m per m
ii) 1.5m per m
iii) 2.0m per m
iv) 2.5m per m
v) 3.0m per m
vi) 3.5m per m
vii) 4.0m per m
viii) 4.5m per m
ix) 5.0m per m
x) 6.0m per m
xi) 6.5m per m
xii) 7.0m per m
13 Inspection Chamber/Manhole without cover, of depth (to invert
level),
a) 0.75m each
b) 1.0m each
c) 1.5m each
d) 2.0m each
e) 2.5m each
f) 3.0m each
g) 3.5m each
h) 4.0m each
c) 4.5m each
d) 5.0m each
e) 5.5m each
f) 6.0m each
g) 6.5m each
h) 7.0m each
14 Inspection chamber covers, additional to item 13
a) Medium duty cast iron double seal flat type cover with frame each
including bedding and painting of size 600mm x 450mm
b) Heavy duty cast iron double seal flat typre cover with frame each
including bedding and painting of size 600mm x 600mm
c) Heavy duty recessed cover with frame including bedding of each
size 600mm x 450mm (tiling by others)
15 Hatch box to detail in drawings, complete with cover
a) 200mm deep each
b) 300mm deep each
c) 400mm deep each
d) 500mm deep each
e) 600mm deep each
f) 750mm deep each
g) 900mm deep each
h) 1500mm deep each
16 Toby Box installed with cover for underground stop valves of
nominal size,
a) 50mm dia. each
b) 80mm dia. each
c) 100mm dia. each
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 10/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
d) 150mm dia. each
17 Taking delivery and installation of sanitary appliances (including
final connections from roughed-in pipes)
a) Squatting WC each
b) Pedestal WC each
c) Wash hand basin with taps each
d) Slab urinal each
e) Bowl urinal each
f) Bowl urinal devider each
g) Long bath with taps & shower head each
h) Double bowl sink with taps (for kitchen) each
i) Bidet each
j) Jacuzzi (including wiring to motor) each
18 Cast iron gully trap with aluminium alloy strainer bucket each
19 Cast iron gully trap installed, with purpose made inlets, hopper each
tops and hinged 150mm x 150mm stainless steel grating
20 Floor waste trap installed, (excludes grating) each
a) uPVC, of nominal size
i) 100mm x 80mm each
ii) 100mm x 100mm each
iii) 150mm x 150mm each
iv) 200mm x 200mm each
b) Cast iron, of nominal size
i) 100mm x 80mm each
ii) 100mm x 100mm each
iii) 150mm x 150mm each
iv) 200mm x 200mm each
c) Floor drain (heavy duty) for car park area,:
i) 100mm x 80mm each
ii) 100mm x 100mm each
iii) 150mm x 150mm each
iv) 200mm x 200mm each
21 Grating (hinged type) for item 20
a) Stainless steel, of nominal size,
i) 100mm x 100mm each
ii) 80mm dia. each
iii) 50mm dia. each
b) uPVC, of nominal size
i) 100mm x 100mm each
ii) 80mm dia. each
iii) 50mm dia. each
22 Additional works for underground pipework (additional to .5 to .9).
Excavation and backfilling of trench, including timbering where
necessary of depth,
a) 0.5m per m
b) 1.0m per m
c) 1.5m per m
d) 2.0m per m
e) 2.5m per m
f) 3.0m per m
TOP GLOVE VIET NAM 8.2-Schedule of rate for PS - page 11/14

BILL 8.2 SCHEDULE OF RATES FOR VARIATION & PROVISION SUM


Addendum 2
Rates are inclusive of all overheads (including on and off- site supervisory staff, allowances, consumables, etc.)
and shall remain valid until the end of the Defects Liability Period.
Rate (VND)
Item Description (Including Overheads/ Profits)
Unit Material Labour Total
g) 3.5m per m
h) 4.0m per m
23 Additional works for underground pipework. Excavation and
backfilling of trench, including timbering where necessary of
depth,
a) 0.5m per m
b) 1.0m per m
c) 1.5m per m
d) 2.0m per m
e) 2.5m per m
f) 3.0m per m
g) 3.5m per m
h) 4.0m per m
24 2 layers of denso tape for underground pipe
a) 100mm dia. per m
b) 150mm dia. per m
c) 200mm dia. per m
25 Stop Valves (inclusive of supports and installation)
Bronze Gate Valves
a) 20mm dia. per no.
b) 25mm dia. per no.
c) 32mm dia. per no.
d) 40mm dia. per no.
e) 50mm dia. per no.
f) 65mm dia. per no.
g) 80mm dia. per no.
h) 100mm dia. per no.
e) 150mm dia. per no.
f) 200mm dia. per no.
Cast Iron OS & Y Gate Valves (listed type)
a) 50mm dia. per no.
b) 65mm dia. per no.
c) 80mm dia. per no.
d) 100mm dia. per no.
e) 150mm dia. per no.
f) 200mm dia. per no.
26 Supply, delivery and installation of Others... complete with all
accessories:
a)
b)
c)
TOP GLOVE VIET NAM 8.3-Sch.of Rate for Maintenance - page 12/14
BILL 8.3 SCHEDULE OF RATES FOR MAINTENANCE

Addendum 2

The Sub-Contractor shall submit with his tender, his rates for the servicing and maintenance of the whole installation after the
expiry of the maintenance period. The maintenance of the installations in this service shall generally comply with the standard
terms and conditions stated below:

.1 Terms and Conditions for Comprehensive Maintenance

a) Sub-Contractors shall send skilled staff monthly during regular office hours to clean all the equipment and to check,
inspect and adjust if necessary, and will exercise all responsible care to maintain the equipment in proper and safe
operating condition. The Sub-Contractor shall record all inspection and maintenance works carried out and a copy of
the report shall be submitted to the Employer or Management Corporation.

b) Sub-Contractors shall supply all the necessary oil and grease, cotton waste, gear oil, etc. and all other replacement
parts and to maintain the installation in proper working condition at all times.

c) In the event of a breakdown, the Sub-Contractor shall send skilled staff immediately to rectify the breakdown at the
Owners' request.
d) The Sub-Contractor shall examine and test periodically all machinery and equipment including all safety and control
equipment so as to ensure that the installation is in safe operating condition at all times.

e) The Sub-Contractor shall provide 24-hour emergency call-back service for adjustment and repair to the equipment.
The response time for emergency call shall not exceed 1/2 hour for lift. For other services, 24 hours or within the same
day.
f) It is the Sub-Contractor's obligation to repair and supply spare parts necessitated by ordinary wear and tear without
extra charge
g) The Sub-Contractor shall be paid monthly for the maintenance service rendered at the agreed maintenance rates. The
agreement shall commence after the expiry of the maintenance period.

h) The Sub-Contractor shall exercise reasonable care and take all protective/preventive measures during the course of
rectification works so as to prevent unnecessary loss, damage, delay or injury of any nature whatsoever which may
occur.
.2 Terms and Conditions for Non-Comprehensive Maintenance

a) Sub-Contractors shall send skilled staff once fortnightly during regular office hours to clean the equipment devices, and
to check, inspect and adjust if necessary, and will exercise all responsible care to maintain the equipment in proper and
safe operating condition. The Sub-Contractor shall record all inspection and maintenance works carried out and a copy
of the report shall be submitted to the Employer or Management Corporation.

b) Sub-Contractor shall supply the necessary oil and grease, and cotton waste etc. The cost for the supply of any kind of
spare parts or replacements as well as the carrying out of any repairs or renewals shall be borne by the Owner.

c) In the event of a breakdown, the Sub-Contractor shall send skilled staff immediately to rectify the breakdown at the
Owner's request.
d) The Sub-Contractor shall provide 24-hour emergency call-back service for minor adjustment and repair to the
equipment. The response time for emergency call shall not exceed 1/2 hour. For other services, 24 hours or within the
same day.
e) In the event of it being found necessary or expedient to effect repairs or replacements for the purpose of keeping the
equipment in good operating conditions, the Sub-Contractor shall notify and submit a quotation to the Owner for
approval prior to carrying out of the repairs or replacements.

f) The Sub-Contractor shall be paid monthly for the maintenance service rendered at the agreed maintenance rates. The
agreement shall commence after the expiry of the maintenance period.

g) The Sub-Contractor shall exercise reasonable care and take all protective/preventive measures during the course of
rectification works so as to prevent unnecessary loss, damage, delay or injury of any nature whatsoever, which may
occur.

.3 Rates

Rates for every year for the first five years after the expiry of the initial maintenance period:
TOP GLOVE VIET NAM 8.3-Sch.of Rate for Maintenance - page 13/14
BILL 8.3 SCHEDULE OF RATES FOR MAINTENANCE

PLUMBING AND SANITARY SERVICES

COMPREHENSIVE MAINTENANCE

(Rate Per Year) VND


Year

Water Supply Sanitary Drainage

0 (DLP)
Year 1

Year 2

Year 3

Year 4

Year 5

NON-COMPREHENSIVE MAINTENANCE

(Rate Per Year) VND


Year

Water Supply Sanitary Drainage

0 (DLP)
Year 1

Year 2

Year 3

Year 4

Year 5
TOP GLOVE VIET NAM 8.4-Deviation from Spec. - page 14/14

BILL 8.4 DEVIATIONS FROM THE SPECIFICATION

Addendum 2

The tenderer is to set out below a tabulated statement showing clearly, and in order of the relevant clauses, any deviations from the
specification. No other departures will be accepted during the course of the contract unless otherwise approved by the Engineer in writing.

CONTRACT CONTRACTOR'S
S/N ITEM Description Cost Saving
SPECIFICATION ALTERNATIVE PROPOSAL

I Water Supply

II Sanitary Drainage

Total 0

Appendix of MEP Services