Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (DesignDesign Requirements and
Criteria)
411166543.docx Page 1 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (DesignDesign Requirements and
Criteria)
411166543.docx Page 2 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1. Rigid frame Frame viaducts Viaducts for Vapi, Bilimora, Surat and Bharuch
(7)
411166543.docx Page 3 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Table 1.1-1.4 show the contents of each type of Standard Design and their diversion
plan related to block No. of rigid frame structure to be applied for Vapi, Bilimora,
Surat and Bharuch station.
Number of Story 2 2 2
Number of Story 2 2 2
411166543.docx Page 4 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Type-A(VP) Type-B(VP)
Number of Span 3 4
Number of Layer 1 1
411166543.docx Page 5 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Number of Span 3 4
Number of Layer 1 1
Number of Story 3 3 3
411166543.docx Page 6 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Number of
3 4 4 4
Span
Number of
2 2 2 2
Story
Planar Shape Trapezium Trapezium Rectangle Rectangle
Rigid frame Rigid frame Rigid frame
Adjacent Pier and Rigid
structure on structure on structure on
Structures frame structure
both sides both sides both sides
Applicable
12.5+12.0+12.5m 12.5+12.5+
Span 12.5m×4 12.5m×4
12.5+13.0+12.5m 11.5+13.5m
Arrangement
Applicable
Column 13.7m* 13.7m* 13.7m* 13.7m*
Height
Foundation
Pile Foundation Pile Foundation Pile Foundation Pile Foundation
Type
Note: Column height shall not be changed (as per the Drawings).
Number of Span 3 4 4
Number of Layer 1 1 1
411166543.docx Page 7 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Table 3.1 Span allocation plan and standard design to be applied for Vapi station
R1 R2 R3 R4 R5
Number of Span 3 4 4 4 4
Number of Layer 1 1 1 1 1
Planar Shape Straight Straight Straight Straight Straight
Back Split Back Split Back Split Back Split Back Split Back Split
Construction (One-sided) (Both-sided) (Both-sided) (Both-sided) (Both-sided)
Height of Column 17.0m 17.0m 14.8m 14.4m 14.3m
Spread Spread Spread Spread Spread
Foundation Type
Foundation Foundation Foundation Foundation Foundation
Application Type Type-A(VP) Type-B(VP) Type-B(VP) Type-B(VP) Type-B(VP)
R6 R7 R8 R9
Number of Span 4 4 4 3
Number of Layer 1 1 1 1
Planar Shape Straight Straight Straight Straight
Back Split Back Split Back Split Back Split Back Split
Construction (Both-sided) (Both- sided) (Both –sided) (One-sided)
Height of Column 13.9m 13.9m 13.9m 13.9m
Spread Spread Spread Spread
Foundation Type
Foundation Foundation Foundation Foundation
Application Type Type-B(VP) Type-B(VP) Type-B(VP) Type-A(VP)
411166543.docx Page 8 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Table3.2 Span allocation plan and Standard Design to be applied for Bilimora Station
R1 R2 R3 R4 R5
Number of Span 3 4 4 4 4
Number of Layer 1 1 1 1 1
Planar Shape Straight Straight Straight Straight Straight
Back Split Back Split Back Split Back Split Back Split Back Split
Construction (One-sided) (Both-sided) (Both-sided) (Both- sided) (Both-sided)
Height of Column 13.2m 13.2m 13.2m 13.2m 13.2m
Pile Pile Pile Pile Pile
Foundation Type
Foundation Foundation Foundation Foundation Foundation
Application Type Type-A(BL) Type-B(BL) Type-B(BL) Type-B(BL) Type-B(BL)
R6 R7 R8 R9
Number of Span 4 4 4 3
Number of Layer 1 1 1 1
Planar Shape Straight Straight Straight Straight
Back Split Back Split Back Split Back Split Back Split
Construction (Both-sided) (Both-sided) (Both-sided) (One-sided)
Height of Column 13.2m 13.2m 13.2m 13.2m
Foundation Type Pile Foundation Pile Foundation Pile Foundation Pile Foundation
Application Type Type-B(BL) Type-B(BL) Type-B(BL) Type-A(BL)
Table 3.3 Span allocation plan and Standard Design to be applied for Bharuch Station
R1 R2 R3 R4 R5
Number of Span 3 4 4 4 4
Number of Layer 1 1 1 1 1
Planar Shape Trapezium Trapezium Straight Straight Straight
Back Split Back Split Back Split Back Split Back Split Back Split
Construction (One-sided) (Both-sided) (Both-sided) (Both-sided) (Both-sided)
Height of Column 13.7m 13.7m 13.7m 13.7m 13.7m
Pile Pile Pile Pile Pile
Foundation Type
Foundation Foundation Foundation Foundation Foundation
Application Type Type-A(BH) Type-B(BH) Type-C(BH) Type-C(BH) Type-C(BH)
R6 R7 R8 R9
Number of Span 4 4 4 3
Number of Layer 1 1 1 1
Planar Shape Straight Straight Trapezium Trapezium
Back Split Back Split Back Split Back Split Back Split
Construction (Both-sided) (Both-sided) (Both-sided) (One-sided)
Height of Column 13.7m 13.7m 13.7m 13.7m
Foundation Type Pile Foundation Pile Foundation Pile Foundation Pile Foundation
Application Type Type-C(BH) Type-C(BH) Type-B(BH) Type-A(BH)
411166543.docx Page 9 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
The standard bar arrangement drawing of longitudinal beam and slab shall be applied
to the change of the column spacing(longitudinal direction)
411166543.docx Page 10 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.3.6. Change of floor slab within the scope of installation of the instrument room
The slab reinforcement diagram shall be applied to the instrument room on the slab
track.
411166543.docx Page 11 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 12 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 13 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
・ The existence of buried objects, the necessity of relocation, relocation place and ways to
relocate them.
・ Transmission facilities such as the transmission lines, the transmission towers, and the
necessity of relocation about them if necessary.
・ Drainage work of viaduct (confirmation of downstream)
・ With / without an artificial ditch, etc.
The necessity of relocation place and ways to relocation them.
411166543.docx Page 14 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Longitudinal direction
Transverse direction
411166543.docx Page 15 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 16 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 17 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Outer wall loads are assumed as the following figure. If actual values are greater than
the values shown in the figure, they are not allowed to be applied.
411166543.docx Page 18 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
The SER load is assumed in the design as the following figure. If actual area of SER
is wider than shown in the table, it is not allowed to be applied.
Longitudinal direction
Transverse direction
411166543.docx Page 19 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Escalator and elevator are can be applied in the range of the following figure.
411166543.docx Page 20 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 21 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 22 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
For Surat station, supplied drawings (General drawing, bar arrangement drawing) of
rigid frame viaduct are in four types as shown below.
Table 2.1: Supplied standard structures
Type A(SR) Type B(SR) Type C(SR) Type D(SR)
Number of spans 3 4 4 3
Number of layers 2 2 2 2
Middle floor slab Exist Exist Exist None
Type of Back split One side Both side Both side One side
Span length 12.5 11.5 - 13.5 12.5 12.5
(Longitudinal direction) (m)
Pillar height (m) 16.5 16.5 16.5 - 17.9 18.0
Foundation type Pile Pile Pile Pile
Application R1 R3 R2,R4,R5 R9
R6,R7,R8
411166543.docx Page 23 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
R1 R2 R3 R4 R5 R6 R7 R8 R9
Nos. of spans 4
Nos. of layers 2
Middle floor slab Exist None
One One
Type of Back split Both side
side side
Span length 12.5 12.5 (Fixed)
12.5 (Fixed)
(Longitude direction) (m) ~13.5
Pillar height (m) 16.5 16.5 16.5 16.7 17.2 17.4 17.6 17.9 18.0
Foundation type Pile
Application A(SR) C(SR) B(SR) C(SR) C(SR) C(SR) C(SR) C(SR) D(SR)
411166543.docx Page 24 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
assumed in the design, the column member length can be modified depending upon
the depth of the bearing layer.
When the height of column member is necessary to be modified, the length of the
column shall be adjusted by altering the length of the middle part of the column, i.e.
outside 2D range from the end of the column (D: Depth of column member), as
shown in Figure 1.1.For an arrangement of reinforcing bars with changing pillar
length, reinforcing bars of the adjustment range as the following figure is shortened.
The adjustment range is outside the point of 2.0 x D from the beam surface. In this
case, Tthe number of shear reinforcements stirrups shall be adjusteddecreased
depending on the shortened length of the columnpillar. However, the spacingpitch of
the shear reinforcements stirrup shall be same or smaller than the spacingpitch of the
shear reinforcements shown in the drawingDrawings.
The abovementioned procedure can also be applied to the modification of the
Standard Design Drawings to Construction Drawings at the specific place for
adjusting the column length.
Left of the
drawingDrawing is
upward
Range to be
aAdjustmented
range
411166543.docx Page 25 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 26 of 64
Range to be aAdjustedment
range
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 27 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.7.5. Modification of Span Length of Transversal Beam and Slab at Track Level
This section shows the procedure to modify the Standard Design Drawings to
Construction Drawings at the specific place for adjusting the span length of the
transversal beam and slab at the track level.
The length of the transversal beams shall be adjusted by modifying the length of the
middle part of each beam, i.e. the range outside the 1.5D range (D: Depth of beam)
from the end of each beam, as shown in Figure 1.3. The number of the shear
reinforcements shall be adjusted according to the length of the beam. However, the
spacing of the shear reinforcements shall be same or smaller than the spacing of shear
reinforcements shown in the Drawings.
411166543.docx Page 28 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Range to be adjusted
Figure 1.3 Range to be Adjusted in the Case of Modifying Transversal Beam Length
The length of the transversal slabs shall be adjusted by modifying the length of the
middle part of each slab, i.e. the range outside the bending part of longitudinal
reinforcements, as shown in Figure 1.4. The number of distributing bars shall be
modified according to the length of the slab. However, the spacing of the distributing
bars shall be same or smaller than the spacing shown in the Drawings.
Figure 1.4 Range to be Adjusted in the Case of Modifying Transversal Slab Length
1.7.6. Modification of Span Length of Transversal Beam and Slab in First Floor
for Surat Station
Modification of the member length and bar arrangements of transversal beam and
slab in the first floor for Surat station shall be as per the same method shown in the
section “1.3.3 Modification of Span Length of Transversal Beam and Slab at Track
Level”.
411166543.docx Page 29 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 30 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 31 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 32 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Support for
escalatorlifting
equipment
. The contractor shall arrange
properly the small beam reinforcement.
Figure 3.4 Adjusting Method for Slab Opening around Lifting Equipment
411166543.docx Page 33 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.7.12. Adjustment of Dimensions for Opening due to Type of Escalator and Lift
The dimensions for opening due to escalator and lift in the Design Drawings are
determined taking into account the maximum values of the lifting equipment as
shown in the Section “1.3.7 Dimensions of Lifting Equipment Related to Type of
Lifting Equipment”. The dimensions of the opening, if any, shall be reduced
according to the type of the escalator and lift to be installed.
Any extra length in the opening between the rigid frame structure and lifting
equipment shall be adjusted as shown in Figure 1.8. The gap between the rigid frame
structure and lifting equipment shall be adjusted by modifying the length of the
cantilever slab around the lifting equipment. The arrangement of the longitudinal /
transversal sub-beams placed around the opening shall not be changed from the
Design Drawings. The bar arrangements of the reinforcing bars provided in the
cantilever slab shall be the same to the diameter and spacing of reinforcing bars
provided in the slab around the opening.
・上に記載されてい
る漏斗部橋脚と重複
では?Under
411166543.docx Page 34 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
・上に記載されている漏斗部橋
脚と重複では?Under
examination,
The development length of the
reinforcing bars will be specified in
411166543.docx Page 35 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
・上に記載されてい
る漏斗部橋脚と重複
では?Under
411166543.docx Page 36 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 37 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
For reinforcing bars of the transverse beam, reinforcing bars of the adjustment range
as the following figure is shortened. The adjustment range is outside the point of 1.5
x D from the beam surface. The number of stirrups shall be decreased dependent on
shortening length of the beam. However, the pitch of the stirrup shall be smaller than
the pitch shown in the drawing.
411166543.docx Page 38 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 39 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Regarding the adjustment of the reinforcing bars, the adjustment of the lengths of the
reinforcing bars due to the change in the length of the transverse beams is same as for
the upper transverse beam and the upper layer slab.
411166543.docx Page 40 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
R2, R4, R5, R6, R7 and R8 of Type C have different length in the transverse direction.
Changing in the length dimension value of the transverse underground beam follows the
table below. The figure below shows the locations of the dimension values L1 to L2.
411166543.docx Page 41 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 42 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Regarding the adjustment of the reinforcing bars, the adjustment of the lengths of the
reinforcing bars due to the change in the length of transverse beams is the same as for
the upper transverse beam.
411166543.docx Page 43 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
This Drawing Finalization Manual (hereinafter the “DFM”) states the procedures for
setting construction areas by accommodating the Standard Figure of platform slabs
for Vapi, Bilimora and Bharuch stations into situations at site or construction
progress. Revises made in the Standard Figure should be conducted in accordance
with DFM.
1.9.1. Scope of application
This Standard Design can be applied to the Side platform with two platforms and four
tracks (Vapi and Bilmora stations), as well as to Side platform and Island platform with two
platforms and five tracks (Bharuch station).
Spacing of
NBR of Pillars Dimensions Platform Shed
Station Parts
Pillars (Longitudinal of Pillars Column
direction)
Normal □600×600 □1500×1300
Vapi,
2 12.5m
Bilimora
Back Split □500×600 □1000×1300
Island
□450×450 □1000×1000
Platform
Bharuch 3 12.5m Row-Y1 □500×500 □1400×1300
This manual shows the procedure for making the construction Drawing adapted to
site conditions using the Standard Drawing of platform structures for Vapi, Bilimora,
Surat and Bharuch station. In the case of modifying the Standard Design Drawings,
the Drawings shall be modified according to this manual.
411166543.docx Page 44 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 45 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.12.1. Side platform with two platforms and four tracks (Vapi, Bilimora)
The contents of the Standard Designs of platform for Vapi, Bilimora and Bharuch
station are shown in Table 2.1 and 2.2.
Table 2.1 AStandard Design of Platform for Vapi and Bilimora Stationpplicable Type of
Structures (for Vapi and Bilimora)
Side Platform
Section for Lifting Section for Platform
StandardStandard
TypeYPE Facilities (staircase, Operation Instrument
Section
escalator and lift) RRoom
Shape Portal type T-sShaped type Haat-sShaped type
SlabTotal Width
8.25m 8.25m 8.25m
of Platform
Effective Width 8.0m 8.0m 8.0m
Height of
Platform 2.35m 2.35m 2.35m
(From SL to PL)
Planar Shape StraightRectangle RectangleStraight RectangleStraight
Interval of
12.5m 12.5m 12.5m
Expansion Joint
12.5mWith assisted
RemarksJoint With slab
12.5m equipment room
Pitch opening12.5m
under the platform
411166543.docx Page 46 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.12.2. Side platform and island platform with two platforms and five tracks
(Bharuch)
Side Platform
Section for Lifting Section for Platform
Type Standard Section
Facilities Operation Room
Shape Portal type T-Shaped type Hat-Shaped type
Island Platform
Section for Lifting Section for Platform
Type Standard Section
Facilities Operation Room
Shape Portal type T-Shaped type Hat-Shaped type
Side Platform
Section (staircase,
TYPE Standard Instrument Room
escalator and lift)
411166543.docx Page 47 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Island Platform
Section (staircase,
TYPE Standard escalator and lift) Instrument Room
Edge of platform
Shape Portal T-Shaped Hat-Shaped
Total Width of
5~10m 5~10m 10m
Platform
Effective Width 5~10m 5~10m 10m
1.13.
411166543.docx Page 48 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
・上に記載されている漏斗部橋脚
と重複では?・ラーメンのスラブ
2.2.2. Surat Station の寸法調整範囲は,中間スラブの
The contents of the Standard Designs of platform for Surat station are shown in Table
折り曲げ鉄筋の内側範囲を調整す
2.3. ることとなっていますが,それと
整合は取れてますでしょうか?プ
ラットホームスラブには折り曲げ
Table 2.3 Standard Design of Platform for Surat Station (Island Platform)
鉄筋が無いので,ハンチ内側で調
Platform Type Island Platform 整するということでしょうか.
Standard Design
Type-A Type-B Type-C
Type
Section for Lifting
Section to be Section for Lifting
Standard Section Facilities expected
Applied Facilities
in the Future
Shape Portal Type T-shape Type Portal Type
411166543.docx Page 49 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Changes in width
1.15.
Area enable to be
1.16. shortened
1.17.
1.18.
1.19.
1.20.
1.21.
1.26. To install the opening at the side of platform wall, the side
opening is reinforced and transverse beams are placed upon the
upper surface of the opening. The rebar arrangement layout of
the wall opening is recommended to be used for that purpose.
411166543.docx Page 50 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.30. The opening for the lifting facility is set with the maximum
dimension. Reduce the slab opening according to the size of the
facilities to be installed. The gaps should be closed with caps,
etc.
1.31. Open for future lifting facilities (for lift and escalator)
1.33.
411166543.docx Page 51 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.36.
1.41. The expansion joint shall be provided near the column of the
rigid frame viaduct. The back split part shall be placed at the
structural joints. The expansion joint shall also be provided at
the boundary where the platform type changes. The standard
interval of expansion joint is shown in Table.2.1 and Table.2.2.
The joint plate shall be placed on the expansion joint directly
above the back split of the rigid frame viaduct.
1.42. Finishing og platform surface for the area where the width may
change (Bharuch)
1.43. The tile of the platform edge and the warning block are arranged
based on a general drawing. In that process, the range which is
1200mm from the platform to the warning block should be
finished horizontally. Regarding the area between 1200mm and
411166543.docx Page 52 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.44.
1.45.
411166543.docx Page 53 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.47. Distance between the center of track and platform edge and its
height
1.50. The position and size of openings for cables or pipes and
openings in walls made for inspection purpose shall be
confirmed. Moreover, the necessity of installing the gate on wall
openings should be confirmed.
1.55.
1.56.
1.57.
411166543.docx Page 54 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
This manual is the guideline for the preparation of construction drawings which are
applied to the construction condition. Any modification on the standard drawings for
the platform slab of Surat station must be applied to this manual.
1.58.1. Scope of application
This standard design can be applied to the platform of Surat station.
1.58.2. Track structure
As a prerequisite, it shall be based on the track structure of RL to SL=1100mm.
1.58.3. Applicable architecture shed’s pillars
It shall be applied to the island platform with the slab opening to install the
architecture shed’s pillar. The applicable pillars are shown in the table.
411166543.docx Page 55 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
Island Platform
TYPE-D TYPE-E
Place for
Application Platform Nose of
Place Operation Platform
Room
Shape Hut Type T-shape Type
Slab Width 11.28m 5.488m
Loop
Length of Loop line:2.02m line:2.544m
Overhanging Main line:1.98m Main
line:2.544m
Height of
Platform(fro 2.35m 2.35m
m SL to PL)
Planner
Rectangle Trapezoid
Shape
Interval of
Expansion 13.0m 10.0m
Joint
411166543.docx Page 56 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
With Assistive
Equipment
Remarks
Room under the
Platform
Notice: Platform width and height due to curves shall be changed base on SOD.
411166543.docx Page 57 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
11320 or less
2040 400 Changeable Scope 400 2000
(Future) (Future)
4980 or less
Changeable Scope 400 2000
<630
Center of Main Line(Down Track)
1/100
or less
LEVEL
Figure 2.2 Method for Modifying Slab Width of Type-B Standard Design for Surat Station
411166543.docx Page 58 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
installed, the gap between the pillar and the opening shall be closed.
(Future) (Future)
Center of Main Line(Down Track)
Slab Opening
1000 x 1000
1/100 1/100
or less or less
LEVEL LEVEL LEVEL
65
50
2350
411166543.docx Page 59 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
The opening for the lifting facilitiesy is Designed in consideration for the largest type
of each lifting facilities, i.e. lift, escalator and staircase.is set with the maximum
dimension. Therefore, the Reduce the slab opening shall be reduced according to the
size of opening of the lifting facility to be installed as shown in Figure 2.4, and or
close the gap shall be closed with a cover.
・上に記載されてい
る漏斗部橋脚と重複
では?Under
411166543.docx Page 60 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
range of 1200mm to 3000mm from the edge of platform (drain to the track side).
411166543.docx Page 61 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
411166543.docx Page 62 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
1.61.1. Distance between the Center of Track and Platform Edge and its Height
The Standard Design Drawings for the platform show only the general contents. The
distance between the center of the track and platform edge and its height in actual
structures shall be determined by the Contractor. The conditions such as the width of
formation and the construction gauge etc. shall be determined in accordance with
SOD etc. Particularly, due consideration shall be made by the Contractor to determine
these values along the curve section in the loop line.
1.62.1. Confirmation of distance between platform edge and track center on curves
On the curves of the loop line and the range outside of 25m before and after the BTC
and ETC shall be extended the distance between platform edge and track center by
the curve and the cant. Please confirm at SOD Appendix-5, -6 for setting of
separation.
1.62.2. Confirmation of height of the edge of platform on curves
In the curved section of the loop line and the range outside of 25 mm before and after
the BTC and ETC shall be lower the height of front of platform by the cant. Please
confirm at SOD Appendix-5, -6 for setting of height of platform.
1.62.3. Confirmation ofof opening Opening Pposition
The opening position and the size of the platform slab opening in order to provide
electric cables and ducts, and inspection opening in the platform walls shall be
confirmed by the Contractor. It shall Aalso be confirmed whether the gate for the
inspection opening shall be required or not.
, confirm whether the gate on wall opening shall be installed or not.
1.62.4. Confirmation off with or /without and pPosition of Ssign Ppole
The location of the sign pole Refer shall conform to the Clause “the document
”04040 Interface, Coordination and Cooperation with Other Parties””, and if there is
any query regarding the sign pole by the Contractor, the Contractor shall confirm to
the Engineer on this matter.
about the location of the sign pole. If any concern, confirmed with the engineer.
1.62.5. Confirmation of maintenance Maintenance Aaisle and Ffacilities under the
pPlatform
The installation location and necessary space for various equipment such as LCX and
electric cables installed under the platform shall conform toRefer to the document
the Clause “”04040 Interface, Coordination and Cooperation with Other Parties”
”about the installation location and necessary space of various equipment such as
411166543.docx Page 63 of 64
Project for the Development of Mumbai-Ahmedabad High Speed Rail Bidding Documents - Part 2
Package No. MAHSR – C-4 Section VI-2 Employer’s Requirements (Design Requirements and Criteria)
LCX and electric cable installed under the platform. If any concern, confirmed with
the engineer., and if there is any query regarding LCX and electric cables by the
Contractor, the Contractor shall confirm to the Engineer on this matter.
411166543.docx Page 64 of 64