Best Practices
22 September 2016
I.Honorato
1.
Vision & Capabilities
2.
Principles
1.
Vision & Capabilities
2.
Principles
“A team of applications experts aligned with the business to support existing customers and
drive growth opportunities through differentiated products and services”
1.
Vision & Capabilities
2.
Principles
1 2 3 4
NewNewInternal Product
Product Market Research & Plant Assessment Pre-Trial Audit
Introduction
introduction Internal Customer Introduction
5 6 7 8
Principles Date
Customer
Location
xx/xx/xxxx
WS Plastic
Wenner Von Siemens, 555, Lapa, São Paulo - Brazil
Contatct Person Dias, João (Engineering) / Gomes, Paulo ( Process)
TCS Silva, Antonio
Date Of Plan Review xx/xx/xxxx
3 Plant Assessment Proposed Trial Date
Trial Purpose
xx/xx/xxxx
Demonstrate xxxxxx utilizing xxxxxxx technology on your XXX laminator versus
ABC Adhesives.
1) Most important- Lower cost in use for adhesive which will ultimately impact
•
WS Palstic around $...
Photos
2) Currently have to reduce speed from target of 500-550 fpm to 280-300 fpm
when running UV coated litho. Current production costs are ~$3.76/msf.
Baseline Measurables
3) Previous foaming experience with xxxx caused WS Plastic Laminations
significant down time and frustration as the unit would not keep up with their
capacity. On a typical production day, with the xxxx not operating, WS Plastic
Laminations would see an estimated $XX/day loss due to increased consumption
Notes
and maintenance time.
Hard Savings
1) By foaming the adhesive at a target 25% or higher we will reduce
application rates of xx-xx lbs/msf. Based on an annual consumption of XX MM
lbs of adhesive, foaming has the opportunity to reduce your adhesive
•
consumption by xxxxx lbs/yr. Additionally, this may reduce your cost/msf due
Samples required
production costs on UV coated jobs by an estimate of $X/msf as jobs will be
running faster at the same machine burden.
3) Henkel´s system is a total package including the adhesive, equipment and
service expertise for both. Having local support allows us to respond quickly to
any issues that you may have and sustain the mileage advantage of foaming.
•
Soft Savings: Improved layflat, and faster set speed.
Customer support 1. Silva, Antonio to confirm w/ Gomes, Paulo of WS Plastic that xxxx
adhesive has arrived by ....
2. Silva, Antonio and Gomes, Paulo to set-up foamer on XX/XX
- We will need 480V, 3P, 60 hz power.
•
- Consistent 90-100 psi air supply.
6. We will review the results at the end of each day, with cumulative
results provided on Monday XX/XX
If the product XXXXXXX meets the requirements outlined in the deliverables
Customer Agreement
section, our next step will be to evaluate a longer, 14 tote run starting Monday
for next step
XX/XX
Souza, Marina (Owner)
Key Contact / decision Alves, Carlos (Buyer)
Principles Date
Customer
Location
xx/xx/xxxx
WS Plastic
Wenner Von Siemens, 555, Lapa, São Paulo - Brazil
Contatct Person Dias, João (Engineering) / Gomes, Paulo ( Process)
TCS Silva, Antonio
Product on site
adhesive unfoamed through our unit. This equates to $4/msf.
2) Currently have to reduce speed from target of 500-550 fpm to 280-300 fpm
when running UV coated litho. Current production costs are ~$3.76/msf.
Baseline Measurables
3) Previous foaming experience with xxxx caused WS Plastic Laminations
Check machine
1) By foaming the adhesive at a target 25% or higher we will reduce
application rates of xx-xx lbs/msf. Based on an annual consumption of XX MM
lbs of adhesive, foaming has the opportunity to reduce your adhesive
consumption by xxxxx lbs/yr. Additionally, this may reduce your cost/msf due
to adhesives by $x/msf.
6. We will review the results at the end of each day, with cumulative
results provided on Monday XX/XX
If the product XXXXXXX meets the requirements outlined in the deliverables
Customer Agreement
section, our next step will be to evaluate a longer, 14 tote run starting Monday
for next step
XX/XX
Souza, Marina (Owner)
Key Contact / decision Alves, Carlos (Buyer)
maker approval Dias, João (Engineering)
Gomes, Paulo (Process)
Notes Any other relevant information
7 Implementation
• Process conditions
Lead by technical audit
Customer participation (engineering,
processing, etc )
• Customer Training
Operators manual and others
• Customer sign-off
• Within Henkel
Share best practice examples (Forms, reports, calculators and presentations)
Keep all stakeholders on board
Priorities Support
• Global Strategy Initiatives (KSI) • ADP & Innovation
• Segment Projects • KAM
• Customer Targets • Value Delivery & Qualification
• Equipment
• Quality & Complaints
Execution
• 90 Day Plan Sustaining Values
• Pre Trial Plan • Customers Drives
• Post Trial Validation • Henkel Expertise
• Service Innovation • Total Process Approach
• Customer Support • Win – Win Solutions
• Customer Satisfaction • New Busienss
• Training • Profit Improvement
• Customer Retention
Leveraging Best Practices in our Execution
People
Bring to the customer a real competitive 06.Lower Cost in 02.Henkel Expertise Deliver Technology & Solution
advantage doing more & better with less! Use Know-how
New Business
Profit
Improvement
Customer
Retention
Foster relationship at local and
03.Total Process corporate sites
Overcome all customers expectations! 05.Performance
Approach Manage multiple stakeholders
Industry Presence
04.Win- Win
Solution
Best Offer & Best Solution!
Value Delivery & Quantification