Reference WD/QLE/26

SKILL / QUALIFICATION MATRIX - QUALITY ASSURANCE_INCOMING INSPECTION & FD Rev. Status


A 10.01.2019
/ Date

SKILL REQUIRED FOR INCOMING INSPECTION SPECIFIC SKILL REQUIREMENTS

Basic Knowledge on
( Verification Service

safety & Emergency


Testing equipments

thickness tesr.,etc.)

product verification
Reference Sample /

(CRT, ECV, Coating

Layout Inspction &

Conducting Stored
Control Plan, Work

Inspection reports

knowledge on raw
Instruction & SOP

Furniture Division

material testing &


Visual inspection
understanding of

understanding of

Interpretation of

Providers Parts

Knowledge on
Instruments &

NC / Rework /
Instruments /

Inspection &
Failure parts

Control Plan
Selection of

inspection )
Handling of

preparation

preparation
Selection &

Verification
SPC / MSA
Measuring

evaluation
Drawings
Reading /

Reading /

handling
Sl.No Inspectors Name

Gauges

audit
Nature of Work

A B A B A B A B A B A B A B A B A B A B A B A B A B

Oct'12 - Oct'12 - Oct'12 - Oct'12 - Oct'19 - Oct'12 - Oct'12 - Oct'12 - Oct'19 May'17 Oct'12 - Oct'12 - Oct'12 - Oct'19 Apr'15
Incoming
1 S.Babu
Inspection
D C D C D C D C D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - - - - - - - - - -

A B A B A B A B A B A B A B A B A B A B

Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'12 - Oct'19 May'17 Oct'19 Apr'15
Incoming
2 P.Krishna Kumar NA NA NA
Inspection
D C D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - - - -

A B A B A B A B A B A B A B A B A B

Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 Apr'15 Oct'19 May'17 Oct'19 Apr'15
Incoming
5 P.Deepak NA NA NA NA
Inspection
D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - -

A B A B A B A B A B A B A B A B A B A B

Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 Apr'16 Apr'20 May'17 Apr'20 Apr'16 Apr'20 Apr'16
Incoming
6 G.S.Ananth NA NA NA
Inspection
D C D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - - - -

A B A B A B A B A B A B A B A B A B A B

Apr'20 Jun'18 Apr'20 Jun'18 Apr'20 Jun'18 Apr'20 Jun'18 Apr'20 Jun'18 Apr'20 Jun'18 Apr'20 Jun'18 Apr'19 Jun'18 Apr'20 Jun'18 Oct'19 Jun'18
Incoming
7 C.Vignesh NA NA NA
Inspection
D C D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - - - -

A B A B A B A B A B A B A B A B A B A B A B A B A B

Jun'18 - Jun'18 - Jun'18 - Jun'18 - Oct'19 - Jun'18 - Jun'18 - Jun'18 - Oct'19 Jun'18 Jun'18 - Jun'18 - Jun'18 - Oct'19 Jun'18
Incoming
8 J.Mariraj
Inspection
D C D C D C D C D C D C D C D C D C D C D C D C D C

- - - - - - - - - - - - - - - - - - - - - - - - - -

Legend:
Skill level - D : Min 20 marks Basic Qualification Test
Skill level - C : In addition to the D level, Min 60% marks in theory & 80% marks in practical Marks to be scored
Skill level - B : Skill level C, Min 80% marks in theory & 100% in practical / demonstration
Skill level - A : Skill level B + 3 years experience in respective functional area & Min 90% marks in theory & 100% in practical / demonstration

Minimum skill level required for the above process (Incoming inspection activity) - "B"

A - Can do independently & Teach others, B - Can do independently, C - Can do with supervision / Senior inspectors, D - Needs training, NA - Skill not applicable , b - Authority to stop production
Note : 1. As and when new inspector are placed, they will be included into skill matrix.
2. Based on the skill development timing plan, review will be initiated & skill development plan will be updated.
3. All inspectors will be evaluated once in 6 months for effectiveness.

R.R.Raghul / 10.01.2019 S.Ravichandran / 10.01.2019 G.Prabhu / 10.01.2019


Sheet 01 Of 01
PREPARED BY / DATE APPROVED BY / DATE ISSUED BY / DATE