JOB KONTRAKTOR SPINNING

1. Check kondisi spinning m/c


2. Cleaning area floor spinning m/c A & B side.
3. Replace idle gear yang rusak / idle gear penggantian
4. Overhoul idle gear A & B side, stock A QTY 10, Stock B QTY 10
5. Overhoul gearbox godet 10 ea for shutdown
6. Overhoul pump shaft for stock minimum QTY 1 ea (ada 5 jenis pump shaft)
7. Fill up / oiling idle gear, pump shaft, metering pump
8. Overhoul metering pump & cleaning metering pump, testing metering pump on
workshop pressure cleareance maximum 3%, >3% reject
9. Menata gudang / pengelompokan material seperti metering menjadi 1 posisi.

JOB KONTRAKTOR BATH STATION


1. Check kondisi area bath station L-4.5 (daily checklist)
2. Check kondisi area CS2 settler (daily checklist)
3. Check kondisi pipe hypo, pipa CS2, pipe steam until NGBC (per week) 1 kali
pengecekan. (weekly checklist)
4. Cleaning overflow pump L-4.5 , sumpzone pump. Cleaning pompa apabila
chocking ada fiber pada impeller pompa / mengganjal pada elbow pipe inlet.
5. Overhoul pompa ketika ada masalah segera untuk diperbaiki & di pasang.
Seperti mengganti bearing, mechseal pada pompa.
6. Ganti gasket apabila ada kebocoran & ganti valve butterlfy.
7. Membuat stock gasket all ukuran dari ukuran 1 inchi hingga ukuran 6 inchi untuk
stock apabila ada kebocoran di gasket.
8. Ganti bolt flange secara berkala apabila sudah corrosive & sudah tidak layak
dipakai kembali.