Академический Документы
Профессиональный Документы
Культура Документы
LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT TINGGI, DAERAH
KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS
SDN. BHD.
TC 2 (GRIDLINE 12-13/A-B )
AKUAN:
I hereby certify that these works have
been designed by me in accordance with
sound engineering practice and that i
take full responsibility for the design and
proper performance of the same.
MAIN CONTRACTOR:
ENG HAN ENGINEERING SDN. BHD.
DESIGN ASSUMPTION
1./ THE TOWER CRANE IS DESIGNED FOR THE MAXIMUM FREE STANDING HEIGHT AS STATED.
2./ FOR HEIGHT EXCEEDING THE FREE STANDING HEIGHT, TIE AT INTERMEDIATE LEVEL
SHALL BE PROVIDED.
3./ THE TOWER CRANE WAS FITTED ON THE NEW FOUNDATION PILECAP.
4./ DESIGN CALCULATIONS ARE BASED ON TORQUE MOMENT AND REACTION FORCES
PROVIDED BY THE CRANE'S MANUFACTURER.
5./ THE TOWER CRANE FOUNDATION SUPPORT BASE SHALL KEPT FREE FROM WATER/
MUD AND BARRICAEDED ALL AROUND FOR SITE SAFETY.
7./ THE TOWER CRANE IS CATEGORISED AS TEMPORARY STRUCTURE AND IS THE SOLE
RESPONSIBILITY OF BUIDLING CONTRACTOR ONLY.
8./ CONTRACTOR SHALL REPORT CHANGES ON SETTING OUT AND MATERIALS ON SITE TO
TOWER CRANE DESIGN & SUBMISSION ENGINEER BEFORE COMMENCEMENT OF
WORKS.
9./ TOWER CRANE COMPONENTS AND ITS FIXING PART ARE THE PROPIETARY SYSTEM OF
THE MANUFACTURER AND HENCE NOT COVER UNDER THIS REPORT.
PROJECT
CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR BUKIT
TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD.
INTRODUCTION
Design check of tower crane support foundation.
1
3
2
P1 P2
4 5
B
6
P3 P4
7
8
*ASSUME PILES AT 4 CORNERS
OF THE PILECAP, P1->P4 B
PILES CHK.
PRECAST R.C. CONCRETE PILES = 500 mm DIA.
ASSUMED PILES WORKING LOAD (PILE TO SET) = 1200 KN/ PILE
= 120 TONNES
EACH CORNER REQUIRED PILES NOS., MINIMUM = 1 NOS AT EACH CORNER
PROJECT
CADANGAN PEMBANGUNAN PANGSAPURI PERKHIDMATAN DI ATAS LOT 161544, JALAN BATU NILAM 16, BANDAR
BUKIT TINGGI, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN GEMILANG WARAS SDN. BHD.
PILECAP DESIGN
(BS8110) 475 4550 475
28T25
475
4550 5500
b
y 475
x 28T25
av
5500 *SHAPE FOR ILLUSTRATION
1. MAST size :
b= 2000 mm
h= 2000 mm
2. Pile size/diameter, hp = 500 mm
3. Pilecap thickness = 1800 mm
Effective depth of cap,d = 1687.5 mm
4. Spacing factor of pile, x = 9.1
Pile spacing, s 4550.0 mm
5. Pile capacity, 1200.0 KN
6. Max. deviation of pile = 75.0 mm
a/d = 0.667
Bond factor, BF = 1.333 ~ Full truss action 0.5(fcu)^0.5 = 2.739 N/mm2
Permissible anchorage bond stress, fba = 3.98 N/mm2 fba = 3.98 N/mm2
Anchorage bond length required, L = (Dia. of bar* 0.87*BF* Asreq)/(4*fba*Asprov)
L= 785.6 mm
475.0 mm
275.97 mm
(start of anchorage)
473 * ALLOW MIN. 1200mm BEND UP
-18.65 mm LENGTH
r 190.36 mm
25 mm
300.0 mm
209.6 190.36
FOUNDATION DRAWING
26/6/2015
0
9 0
.
26/6/2015