Prologue

The success for construction site safety can be done by trust of everyone. Make the plan and help
together by everyone. All project managers have a duty that make safety work and also have a responsible to
staff’s safety.

Staffs must be responsible to his own action and follow the safety regulations under the concept
“NOT SAFE NOT WORK”

Unsafe act or incident should be reported to the director.

Subcontractor must make the safety work place by report the unsafe incident and co-operate with
safety officer and follow the safety regulations.

This safety manual is the basic regulations for the construction site safety work. But the regulations
will not be any mean if not followed. So staffs must have safety awareness for all time.

Before work the inexperienced work or using equipment must think, learn and ask for an advice
before work and work safely. And be reminded that always have a safety awareness at all time.

Surasak Sonklin

Author
Contents

Safety Management 1
Occupational Health Safety and Environmental Training 2
Health Support 3
Safety Inspection 4
Encourage to follow the rules 6
Work permit system / Types of work permit 7
Personal Protection Equipment 9
Accident / Incident Report and First Aid 12
Safety work in office 13
Traffic control 15
Fire protection 16
Temporary Electrical System and Equipment 17
Electrical work 18
Working with machine 19
Crane operation 20
Elevator work 22
Piling work 23
Excavation work 24
Fall protection 25
Scaffold Erection 26
Using of Scaffold or Ladder 27
Prevention of falling materials or collapses 28
Shoring work
Moving Materials and Storage 29
Cutting Welding and Grinding 30
Chemical work 32
Demolishing work 33
Working in confined spaces
Construction under water
Page |1

Safety Management

1) Subcontractor must read this safety manual to understand the rules, regulations and instruction of using
equipment by types of working.

2) Subcontractor must provide full time safety officer due to the law

2.1) Project manager must passed the safety officer Management level training

2.2) Supervisor must passed the safety officer Supervisor level training

2.3) Subcontractor must provide Safety officer Technical level for work that has not over than 49
workers, Advanced Technical level for 50-99 workers and Professional level for more than 100
workers.

2.4) Provide safety officer as 1.2.1-1.2.3 are due to the law. Sometimes must followed customers
regulations.

3) Subcontractor must prepared data and document and send to Project Manager and Safety Officer of Thai
Shimizu before work as follows

3.1) Occupational Health Safety and Environmental policy

3.2) Construction plan

3.3) Safety plan for maintenance work, construction building that higher than 15 meters or
construction that has an area more than 2,000 square meters.

3.4) Organization and contacts

3.5) Rules and regulations

3.6) Operation manual and risk assessment

Occupational Health Safety and Environmental Training

Subcontractor must provide the training for new staff. Worker who can train with Thai Shimizu must
be over 18 years old (with ID card). In case of alien must has right work permit with application form.
Page |2

1) New staff must pass the safety training before receive the ID card and allowed the work in the construction
site.

2) Subcontractor has responsible to the specific safety training as confined space, crane operation, rigger,
signal man, pile diving etc.

3) Thai Shimizu will be keep record of training

4) For some project, training may followed the customer’s regulations and also specific safety training.
Subcontractor must study the data of the customer and plan by their needs. By not effected to the work.

5) In case of rush or temporary work, subcontractor must apply the form to safety officer of Thai Shimizu for
the shot training for operation under 7 days.

6) Specific safety training could be except if worker was trained by the reliable organization and has a
certificate that not expired.

Health Support

Every project must do an exercise activity about 5 minutes before work and provide the rest time in
day and evening. In case of rush, project director must provide enough time to rest and provide activity that
support health and hygiene or information board. As should provided

 Drinking Water

 Toilet

 Smoking Area
Page |3

 Housekeeping

 Garbage

 Sink with soap

 DO NOT sell food, beverage, cooking in the construction site before allowed by Project Manager of
Thai Shimizu

 Provide first aid kit and also person in charge of first aid.

Safety Inspection

Subcontractor must join the safety inspection to control working area and also an equipment to be
safe. Worker who notices the unsafe act or incident must report to supervisor and safety officer to improve the
situation to be safe. In case of unable to control must report the Project Manager immediately.

Safety inspection divided to 4 types as;

1) Working area inspection

1.1) Daily Safety inspection, subcontractor must join the inspection with Thai Shimizu and send the
improve report within 24 hours.

1.2) Weekly Safety Inspection, Safety officer, Project Manager or agent of subcontractor must join the
inspection with Thai Shimizu and send the improve report within 24 hours.
Page |4

1.3) Monthly Safety Inspection, Thai Shimizu Safety Manager, Safety Committee, Project Manager,
Safety officer of Thai Shimizu and Safety officer and Project Manager of subcontractor must join the
inspection.

1.4) Safety Inspection from the OHSAS 18001 system certifier company, Internal Inspection,
Inspection and Evaluation by Shimizu Corporation. All of inspection that was mentioned above, subcontractor
must be inspected too.

2) Machine and Equipment Inspection

Machine, Heavy machine and equipment must be inspected before use. Details of an inspection as follows

2.1) Machine and heavy machine: Subcontractor must prepare the documents, certificate, and
inspection sheet form and send to safety officer. Then inspection tag will be put on the machine. Tag will be
expired in 45 days for the longest. Example: Subcontractor bring machine to inspect on 1-15th of the month,
tag will be expired in the end of the month. If inspect after 16 th of the month the tag will be expired in the
end of next month. Inspection must be done before the tag was expired.

2.2 ) Electrical machine or electrical equipment inspection: After the inspection, safety officer will
put inspection tag on the machine. Tag will be expired in 45 days for the longest. Example: Subcontractor
bring equipment to inspect on 1-15th of the month, tag will be expired in the end
of the month. If inspect after 16th of the month the tag will be expired in the end
of next month. Inspection must be done before the tag was expired.

2.3) Falling prevention equipment and Lifting gear inspection once a


month by using monthly color tape

2.4) Scaffold Inspection before use by Thai Shimizu safety officer and subcontractor

2.5) Electrical Machine and Equipment before use is a duty of user and supervisor that must
inspect before use

3) Machine and Equipment Inspection is the duty of the users and supervisor must check the safety before
use.
Page |5

Encouraging to follows the rules

To encourage the safety awareness by compliment worker or company that has great cooperation
with safety activity. Otherwise worker or company that breaks the rules must be punished.

1) Compliment Provide the safety award to the worker/supervisor/subcontractor and organization that
follows the safety regulations.

2) Punishment One who breaks the safety regulations shall be punished by

2.1) 1st Stop the work until supervisor and worker who breaks the regulations reviewed the
regulations again and agrees in writing that there will be more control and take action to improve
working condition to be safe.

2.2) 2nd Stop the work, reviewed the regulations again and agrees in writing that there will be more
control and take action to improve working condition to be safe and also fined in accordance with the
rules of the scheme.

2.3) 3rd or in case of seriously or willful misconduct, worker of subcontractor will not permitted to work
in the construction site, fined in accordance with the rules of the scheme and also take action to
improve working condition to be safe before continue the work.
Page |6

Work Permit
System
1) Before
work,
subcontractor must apply for work permit from Thai Shimizu staff.
2) Work permit valid only shown.
3) Work permit that complete must specified date, time, equipment, work area, work details, inspector
signature, licensee and licensor.
Licensee when signed in the license means understand in work and admit to follow all the
rules that shown in
work permit.
Licensor is the last person to decide that the equipment or working area is safe to work and
prepare for safety with fire protection.
4) Must be installed in the area where the original license was granted to be noticeable before work.
5) In case of working in many areas may require more than one application for a work permit by type of work.
6) Some project work permit must follow customer’s regulations.
Types of Work Permit
1) Cold work permit
Permission for general work that doesn’t has heat or fire spark as painting, paving asphalt, brick
work, plastering grass etc. or control in clean room maintenance, renovation work.
2) Hot work permit
Permission for the work that may cause heat such as metal cutting with gas or electric welding weld
with gas or electricity or work that cause chemical reactions to generate heat or ignition.
3) Confined space entry permit
Permission for work in the area or within the device that narrow with poor ventilation or toxic
chemicals, vapors of oil or gas and there is not enough oxygen to breathe. Such distillation, tank, hose
access, ground which was dug down to a depth of 1 meter or more from the edge of where the band was
shut down completely.
Page |7

4) Excavation certificate permit


Permission for drilling from surface deeper than 30 centimeters such as dig, pole, pile diving or
others work that similar. (Pile Diving work that has worker work in the pit or pile must apply for Confined space
entry permit.

5) Tag out lock out permit


Permission for the work that related with electrical system all voltage except 24VDC in the operation
area and use to permit for high voltage electric outside the operation area that has electric pressure more
than 220 Volts or use along with other work permit.
6) Work at Height permit
Permission for work at height that higher than 4 meters above from ground or building base, working
on structure, roof, ceiling, basket and also working on a machine (Boom lift, X-lift etc) as working area.

Personal Protection Equipment


Subcontractor has a duty to provide proper personal protection equipment that on standard for worker and
control worker to wear properly. Standard of PPEs are from International Standardization and Organization:
ISO, European Standards: EN, Australia Standards/New Zealand Standards: AS/NZS, American National
Standards Institute: ANSI, Japanese Industrial Standards: JIS, The national Institute for Occupational Safety
Page |8

and Health: NIOSH, Occupational Safety and Health Administration: OSHA or National Fire Protection
Association: NFPA. Standardize by types of the work.

Head Protection

1.Safety Helmet divided into 4 types as follows

 “A” For general work. Immune to some electricity as


construction mechanical
 “B” Immune to high electricity. For Electric worker.
 “C” not immune to electricity. Made by steel.
 “D” For fire fighters.
Cleansing: Rinse with clean water every 1 month.
2.Hair Cover Use in case of working near chain, convey or rolling machine.
Such hair net or cap

Ear Protection
1.Ear Plugs help reduce low noise frequency 25-30 Decibels.
2.Ear Muffs help reduce high noise frequency 35-40 Decibels.

Eyes Protection
1.Glasses Covered for cover eyes and eyeglasses. For grinding, waxing, welding.
2.Safety Glasses
 “A” No side-wings. To protect bouncing material from front.
 “B” Have a cup shape wings. To protect bouncing material from
all direction.
 “C” Have a flat wings. To protect bouncing materials from back
and side of the eyes.
3.Chemical Glasses Covered To prevent chemical in steam or dust form.
4.Melting Glasses Covered Lens has deep blue colors.
5.Welding Glassed Covered Should use the filter lens.
Cleansing: Wash with soap or detergent

Face Protection
1.Face Shield used in metal cutting saws, sanding or polishing the surface with sand or working with
chemicals.
2.Filter mask used in the various categories.
3.Ventilation Hood used in a work that has dust, steam, fume of the chemicals.
Hand, Fingers Protection
1.Gloves used to project from heat.
2.Protection Gloves used in work that has to touch sharp things or using knife or
scissors.
Page |9

3.Rubber Gloves used in painting, cement, cleaning


4.Leather Gloves used in extraction, grinding, capture the rough surface or welding/cutting.
5.Neoprene or Vinyl Gloves used in work related to chemical corrosion, or absorbed through the skin.
6.Gloves for High Voltage Electricity used in electrical work
Cleansing: Wash with soap / detergent, dry cleaning, some need to follow the instructions of the
manufacturer.

Foot, Legs Protection


1.Ankle Boots used in general work.
2.Long Rubber Boots used in wet area.
3.Safety Shoes used in work that may has a falling as moving materials,
crane/pile diving operation.
4.Long Rubber Safety Boots used in wet area or pouring cement.

Body Protection
1.Overall leather used by worn in the front side of the body to protect fireball from welding/cutting or boiling
asphalt
2.Armlet used as fireball protection from boiling asphalt
Lifesaving equipment
1.Safety Belt must be able to take at least 1150 kilograms and must be a big hook type
2.Safety Rope must have test certification
3.Basket must has calculation list and test certification
4.Full Body Safety Harness (2 Big Hooks Type) used in steel structure work and work at height
Always inspect before use.
Cleaning: Wash with mild soap, water and warm water. Then let it dry in the shade.
Rub with peanut oil, castor oil, or oil for leather.

Working Cloths
Generally, worker must wear proper clothes and PPEs.
1.Working with machine must not wear loose clothes, bracelet, necklace, necktie, scarf and worker who has a
long hair must wear hair covering or caps. Because there may roll into the machine and cause a dangers.
2.Worker who doesn’t wear proper clothes or doesn’t wear proper PPEs is not allowed to work in the
construction site.
3. Always inspect the equipment to be in a good condition.
4.Working with chemical must
 Wear chemical protection glasses.
 Wear rubber gloves.
 Wear safety mask.
5. Work that causes fragment that bounce off metal surface as grinding etc.
 Must wear safety glasses to protect the metal flakes.
 Must wear leather gloves.
6. Work with high concentration of light such as cutting welding etc.
P a g e | 10

 Must wear safety glasses or safety mask.


7.Work in the place that dust can spread to the respiratory system such as sweeping garbage, painting etc.
 Must wear a dust cover nose and mouth.
8.Work in noisy place as drilling or grinding.
 Must wear ear plugs or ear muffs.
9. Works on heat or temperature should wear proper 100% cotton or leather clothes
Accident / Incident Report and First Aid
1) To harm (even little) and the incident or accident that cause harm or destroy must be reported immediately.
2) Subcontractor must report to Project Manager of Thai Shimizu immediately if following situation happened
 Death
 Fatal Accident
 Accident that victim cured at the hospital
 Vehicle Accident
 Equipment was destroyed
 Fire
 Misconduct the safety regulations
 Unsafe incident
3) Who saw the unsafe act or incident shall report to safety officer or supervisor immediately
4) If fatal accident occurred in the construction site, Project Manager or Safety Officer must report to
provincial welfare within 24 hours by any methods.
P a g e | 11

Safety work in Office


1. Office floor, walkway, door
1.1) Office floor shall be clean.
1.2) Do not run or skate on the floor.
1.3) While waxing, everyone should be more careful when moving.
1.4) If there was any water or oil spilled on the floor must contact the responsible staff immediately
and sign the slippery mark around the area.
1.5) If there was any stationary was left on the floor must bring it up immediately.
1.6) When walk to the corner, everyone should slow down and keep right.
1.7) Telephone cord or electric cable should be kept neatly, do not obstruct the walkway.
1.8) Do not stand around the opening door, door may swing back and tackle.
1.9) When entering-exiting or open-close the glass door should be careful.
1.10) 2 ways door must attached “PULL” and “PUSH” sticker clearly.
1.11) Do not put stuffs around door area.
1.12) Provide mirror in the blind spot.
1.13) Provide daily housekeeping.
1.14) Smoke in the smoking area.
2. Building Staircase
Using staircase Accident always occurred in staircase. So while we’re on the staircase must be
careful
2.1.1) Before climb up-down the stairs that there’s no danger or not.
2.1.2) If there was lack of light or staircase was broken must contact the responsible staff to improve
immediately.
2.1.3) Do not let tiny materials straggle on the floor such glasses or scrap.
2.1.4) Be careful when using the staircase, no teasing or playing.
2.1.5) Keep right and handle a handrail.
2.1.6) While climb up-down must look at the staircase.
2.1.7) Do not climb up-down as a huge group at one time
3. Working table, chair, cabinet
3.1) Document drawer shall use one by one.
3.2) Do not lean the chair by one side.
3.3) Clear the access way.
P a g e | 12

3.4) Do not put the stuff over the cabinet.


3.5) Store the documents from the lowest drawer and avoid over kept.
3.6) Hand the drawer bar
3.7) Cabinet must not obstruct the walkway.
4. Electric cable and plugs
4.1) If broken must change immediately.
4.2) Damaged electrical outlet must be repaired immediately. While waiting for repairs to be closed
or covered to prevent use.
4.3) Place tools or devices near an electrical outlet most.
4.4) Using the electrical equipment must ensure that voltage is proper.
4.5) Placing or moving the user must be careful not to over electric lines.
5. Stationary
5.1) When using paper please be careful not to cut the body.
5.2) Keep pen or pencil by put the top down or place horizontal.
5.3) Shut scissors jaw, cutter or other sharp things before keep.
5.4) Using cutting machine must be careful not to cut finger and avoid cutting many papers.
5.5) Use the tools when pull the staples do not use nails.
5.6) Furniture that made by steel must chamfer the sharp in the corner.
5.7) Use ladder when have to reach high. Do not step on box, table or chair.
5.8) After work must turn off the light and cut the electric system.
5.9) Stationary that may cause danger must install the safety devices. Ex: ground cable.
5.10) Do not adapt or reform stationary while working.
5.11) Do not uninstall the safety device or open the panel board that may cause danger. If broken
must call the technician and inspected before use.
Traffic Control
1) Driver need to have driving license fit with his type of vehicle.
2) Follow the rules, the sign, and advices of traffic strictly.
3) During the entering and exiting of the construction site, for motorcycle, helmet must
be wear, and for a car fast the seatbelt is a must.
4) Inside construction area, speed must not exceed 20 kilometers per hour.
5) Park in the allowable parking area only and park with backward.
6) Driver must cooperate with security guard to let them check the car when come and
leave construction site.
P a g e | 13

7) Do not start your engine and left it longer than 5 minutes.

8) The vehicles must not block the traffic or emergency water cable.
9) Vehicle must be in a good condition, nothing broken. (No leak of oil or black smoke)
10) Do not move any material by hanging with the machine without tighten. For prevent swing or fall.
11) Driver must give signal before he turn or change the path of his vehicle. And turning back by sudden is
not allowed.
12) Any material that come out of the car more than 0.15 meter from side or 1 meter from front or back should
be tie with some flag or something red and make sure that it can be seen clearly.
13) During driving no phone is allowed.
14) Only the car that has been design specifically is allowed to use as transport.
15) Provide traffic mirrors and signs in every crossroad.
16) Transporting large material shall be avoid during rush hour and inform to owner, nearby community
government or related organization.
17) Pull the hand break and turn off engine before get out of the car and put wheel to the proper directions.
18) While filling the fuel must turn off the engine and do not suck the fuel cable.
19) If there was chemical or flammable materials in the vehicle must provide fire extinguisher at least 1.
20) Driving over electrical cable, fire hose is prohibited.
21) If driver get of the car must wear a helmet, long pants, shoes, rubber boots.
22) Do not drive backward if can’t see the route clearly. If necessary must have a watchman.

Fire Protection

1) Do not keep flammable material or explosive sample in the building or


camping inside construction area
2) Provide flammable material or explosive sample storage and provide
warning sign, no smoking sign and also photo, name and contact of the
responsible person.
3) Provide proper portable fire extinguisher at least 2 per welding area, or
work that may cause fire.
4) Placing materials in walkway or fire exit are prohibited.
5) Works that cause fireball must provide partition, fireproof and tray.
6) Provide fire watchman in the welding cutting by gas or electric.
7) Must ask for hot work permit before start the work and clearly signs
the work area.
8) Subcontractor shall train basic firefighting and join the fire evacuation
by the construction safety plan.
P a g e | 14

9) Transportation, storage and using of gas cylinder must be on a cart and place vertically and tie tightly.
10) Lighting a fire is prohibited. If necessary must asked for the Hot Work Permit.
11) Provide emergency plan to control the emergency situation by project manager.
12) Provide the emergency call number that included all related organization.
13) Fire extinguisher must be inspected.
14) Smoke in the smoking area.
15) In case of fire, all worker and staff must gather at the assembly point.

Temporary Electrical System and Equipment


1) Provide the grounding system for the electric transformer, panel board and all of
the installed electric equipment. Other equipment shall be properly grounded or
ELCB plug.
2) Maintenance, Inspect, Fixing of electrical system must provide the lock out tag
out system and provide warning sign “DO NOT switch” and also apply for work
permit before work
3) Electrical panel board must measure Ohm of the ground cable.

4) All equipment shall be inspected before use by Thai Shimizu staff.


5) Machine or equipment that cannot be able to connect with ground cable must install to the ground
properly.

6) Do not put or drag the cable along the wet area.

7) Elevated cable must provide the clear height signs.

8) Do not lay the cable across the ridge, the edge of a sharp metal.

9) Temporary electrical panel board must be daily inspected.

10) Provided “Electric Warning Signs”, photo, name and contact number on the
electrical panel board.

11) Outdoor panel board must be waterproof and place in not-flooded


area.
P a g e | 15

12) Electrical panel board must be locked at all time.

13) Do not use electrical devices on wet areas.

14) Do not use broken electrical device or inspection tag was expired.

15) Electrical terminal and panel area shall be clear.

Electrical Work
1. Worker that work for maintenance, extension, install the electric equipment or related with electrical must
wear dry clothes and wear rubber boot and working by follow the lock out tag out system.
2. Electrical hand tools must have an electric insulation at handle.
3. Do not use broken electrical equipment until fixed.
4. In case of electrical inspection, maintenance or installation must switch off, lock and tag.
5. Check electrical leak before use the equipment.
6. Keep tidy after use.
7. Strictly follow the rules when working in dangerous area.
8. Do not use metal ladders and other materials that transmit electricity while working with the electrical.
9. Keep an equipment to dry and check equipment regularly.
10. Do not work while the electrical system still not shut down. If necessary must provide experienced worker
to cooperate and must wear electrical insulation suit.
11. Use only inspected electrical equipment.
P a g e | 16

Working with Machine


Subcontractor must send the list of machine and electric equipment to safety officer of the project to
inspect and tagged inspection tag to the machine and equipment that valid after 1 month or not over than 45
days after inspected.
1) Worker must pass the training before work.
2) Subcontractor must provide safety devices for machine such as cover, fire ball protection or steel cage.
3) Do not allow unrelated worker to enter working area.
4) Machine and electric equipment shall be inspected before use.
5) Do not use damaged/broken machine at any case.
6) Provided the warning signal for the machine such as light and sound alarm when moving and provided
warning signs.
7) Show the regulations of using machine in information board around
working area.
8) Machine that has a moving part must be covered the moving parts
properly.
9) Machine that has a buzz saw must provide the safety guard.
10) Machine that use for grinding must provide fire ball protection or
bouncing of materials
11) Always inspect forklift before use.
12) Forklift must have light or sound alarm properly.
13) Forklift driver must pass the training before work
14) Control person not to travel with the forklift.
15) Block the working area with warning sign boards.
16) Provide the watchman for a machine.
17) Machine that cause fire spark must provide fire protection partition.
18) Wearing necktie, accessory is prohibited. Worker must wear proper clothes.
19) All electrical machines must be properly grounded.
P a g e | 17

Crane Operation
1) Related worker must pass the crane operation training.
2) After crane/tower crane/mobile crane/crawler crane was fully installed must inspect and test before use
under control by engineer.
3) Crane must be inspected and test punctually.
4) Lifting gears must have an inspection once a month by using
monthly color tape.
5) Do not lift over workers at any case.
6) Blocked the working area and provide warning signs.
7) Provide daily inspection.
8) Provide lifting material protection to not be worn by a sharp of materials.
9) Provide lock to prevent sling not to slip off the hook.
10) Do not use damaged/broken crane or in the unsafe condition at any case.
11) Provide light and sound alarm during the operation.
12 Maintenance signs must be tagged when maintenance.
13) Provided load limit at the crane and hook pulley.
14) For tower/overhead crane must provide bumper at the tip of the rails.
15) For tower crane must provide load chart in the operation room.
16) For mobile crane must provide load chart in the visible area.
17) Hydraulic level must be in the proper level.
18) Outriggers must fully extend and working area must be stable and put a steel plate to support crane.
19) Do not use over capacity of the crane.
20) Do not operate crane in the manhole area, if there were no
soil erosion protection.
21) Do not use crane near a high electric cable less than 4
meters.
22) Do not use crane when light is not enough or bad weather.
23) After used the crane must fully kept the arm before moving.

24) Use rope to support the materials not to sway while lifting.

25) Do not lift materials that have someone hang on with at any case.

26) Crane operator must stand by in the operation room at all time while operate.
P a g e | 18

Elevator Work:
1) Must have the regulations of using elevator.
2) Must show load limit and number of max passengers.
3) Monthly inspection by engineer and keep record.
4) Do not ride on the top of elevator, except installation, inspection, maintenance or demolishing.
5) Elevator controller must pass the training.
6) Provide daily inspection.
7) When elevator I not ready to use must lock and signs.
8) If load the cart or movable tools must lock the wheel before load.
9) Do not keep chemical in the lift.
10) Provide the emergency electrical system or support system in case of blackout.
P a g e | 19

Piling Work
1) Pile driving machine operator must pass the training before work.
2) Subcontractor must make the transportation, installation, inspection plan of
pile diving machine and send to Project manager and safety officer to apply
for the work.
3) Subcontractor must make the method and plan for Project Manager to
consider before work.
4) Before work every day, piling machine must be inspected that safe to use.
5) Lifting gears that use to transport pile must have an inspection once a month by using monthly color tape.
6) After fully installed shall be confirmed by an engineer follows the machine’s standard before use.
7) Provided load limit and instruction for using pile driving machine at the operator can read properly.
8) Daily provided supervisor to inspect all of the pile diving machine tools that are safe to use and keep
record.
9) Provided steel structure and falling material prevention over the operator.
10) Change the pile cover when the pendulum stopped in the safe place.
After worker who changes the cover got out from the rail, supervisor shall
provide a signal to continue the work.
11) Pile that has hole’s diameter longer than 15cm must be covered after
dived immediately.
12) In case of pile diving machine was damage/broken or in the unsafe
condition, do not use before fixed and in the safe to use condition.
13) Do not work while the weather is bad. If necessary shall be approved by
an engineer.
14) Assign engineer to control test load of the pile diving machine.
P a g e | 20

15) Provide warning signs and not allowed unrelated worker to enter testing area.
16) Provide safety box or lifeline on the pile diving machine to let the operator hang on during installation,
demolishing or maintenance.

Excavation
1. Before do an excavation work that has a depth more than 50 centimeters must do
the risk assessment and apply for a work permit to inspect that area has an electrical
cable, water pipe or other utilities or not.
2. Drill or dig a pit, ditch etc. must provide hard barricade and warning sign. In the
night must provide the proper light signal.
3. Dig a pit, ditch etc. or similar work that deeper than 2 meters must provide design
calculation and method of working by engineer before work.
4. Operation in the pit that deeper than 2 meters must provided
4.1) Proper access way
4.2) Proper water pump
4.3) Proper air ventilation and light
4.4) Supervisor who passed first aid training and stay around manhole
4.5) Communication devices
4.6) In case of using crane, heavy machine or material placing around manhole must provide soil
erosion prevention
4.7) Operator must experience and trained
4.8) Do not put the soil in the manhole area. If necessary put at least 2 meters away.
4.9) Inspect excavated area after the rain.
4.10) Around the excavation the use heavy machine must provide watchman.
4.11) Every machine must be inspected before use.
4.12) The machine must have warning sign while working.
P a g e | 21

Fall Prevention
1) Temporary walkway that higher than 150 centimeters must wider than 45 centimeters and must provide
handrails at 90 centimeters height 2 level handrails.
2) Working on or in the pole, stanchion, shaft or beam that height from 4 meters
above or working in tank, pit, funnel or other that in the same condition must provide
handrails 2 levels, safety net, toes board and also proper lifeline and safety belt for
safety work.
3) Construction that has a funnel or opening floor that may cause falling must be
covered strongly or provide safety net, handrails on the 90 centimeters height and
the toes board that not lower than 7 centimeters and also provide warning signs.
4) Working on the building that has opening floor must provide lifeline or proper 2
level handrails.

5) Working on the roof, subcontractor must install 2 level lifelines into the steel. The
length between lifelines must not over than 6 meters and test that strong to use.

6) Provide proper scaffolding with good access way and also provide safety net to
be the entrance-exit for the roof.

7) For steel structure work, subcontractor must make proper temporary walkway
and lifeline.

8) Before install purlin on the roof, subcontractor must install the safety net and test before work.

9) Subcontractor must provide the shoes cleaning device to prevent from slipping.

10) Do not demolish, dismantle a temporary walkway before permitted.

11) While working if feel not good or sick must stop the work and report to supervisor immediately.

12) Do not put the materials in the fall-able area.

13) Do not throw equipment or tools in the working area.

14) Do not place materials on the roof, must kept and tie tightly.

Scaffold Erection
1) Do not erect when bad weather.
2) Do not erect near the high voltage electric cable in 4 meters range.
3) Erector must be experience and healthy
P a g e | 22

4) Scaffold’s base must strong and stable and be able to take at least double weight of all
5) Scaffold structure must leveling properly
6) Stairs was cling tightly with the scaffold and install properly
7) Temporary work plate must be fully installed to the scaffold structure. Advice: Should use the work plate
that wider than 45 centimeters
8) Provide 2 level handrails around the scaffold and provide walkway
9) Install toes board or safety net to prevent falling material
10) Use proper joint and fit the working type
12) Base leveling screw must not turn the screw more than 3 out of 4 of the length of the screw
13) Mobile scaffold’s height shall not exceed 3 the width of the base
14) Scaffold’s height shall not exceed 3 the width of the base
15) Tower scaffold’s height must cling the structure with all level of the building
16) Load scaffold must be designed by an engineer and install follow the engineer
17) Tag the scaffold tag and warning sign and also barricade the demolishing area

Using of Scaffold or Ladder


1) Do not work when scaffold is slippery, bad weather or the light is not enough.
2) Do not work on an unsafe scaffold that may cause danger.
3) Do not work on the hanging scaffold or basket scaffold while raining or
windy. And in case of bad weather must take the scaffold to the ground.
4) In case of many works on the same scaffold that has many floors must
provide a falling material prevention.
P a g e | 23

5) Do not demolish, reform, adapt the scaffolding is prohibited.


6) Do not move the scaffolding while worker is working.
7) Do not use the scaffolding that tagged a red tag at any case.
8) Scaffold that was inspected that safe to use must tagged the usable green tag.
9) Inspect the route before move the mobile scaffolding.
10) Mobile scaffolding’s wheels must be locked before work.
11) Do not use mobile scaffolding on the dirt ground, grass and slope.
12) Supporting base of scaffolding, ladder must be strong and be able to take weight.

Safety use for Ladders


1) Inspect before use
2) Calculate the height and length of ladder should be 1:4.
3) Working area must flat, no pit or bulge.
4) While climbing up the ladder must look forward and work with proper action.
5) Must provide locks for the base of ladder.
6) If do not sure is it safe or not, must provide worker to catch the ladder.
7) In case of moving the ladder must always have people to support.
8) Ladder must have a strong structure, firm and proper angle is 75 degrees and the top length over
about 1 meter.
9) Do not carry the materials while using ladder.
10) Do not work on top 3 of the ladder.
11) Worker who use ladder must stick to ladder firmly while using.
Prevention of falling materials or collapses
1) Must provide the gutter to prevention for collapse of soil.
2) Falling material prevention by using canvas or net.
3) In case of carrying material must provide rails or do by proper method.
4) All tools shall be bound to prevent of falling.
5) Do not put or place materials near the manhole or tip of the building.
6) Do not place material lean on the handrails.
7) Do not place material higher than the height of toes board except there was a safety net around handrails.
8) Moving materials by using basket or truck must
cover the materials properly.
P a g e | 24

Shoring:
Shoring must calculate and confirmed by an engineer for the topic as follows;
1) Steel shoring must be able to load twice of its weight. Steel that use for shoring must has a yield point not
less than 2,400kg per square meters and safety value not less than 2.
2) Wood that use for shoring must be strong and has safety value not less than 4.
3) Joint and connection points must be strong and stable.
4) Shoring support shall be able to load twice of its weight.
5) Shoring must be tie with ground or building part strongly.
6) In case of pouring concrete above the shoring must be inspected by engineer before use.

Moving Materials and Storage


Moving Materials
1) Moving large or heavy materials must carry together.
2) Changing direction when carrying must not “twist” because that may harm the muscle.
3) Carry, Lifting, Dragging the heavy materials please follows;
- Material weight not over than 25 Kilograms for Female worker.
- Material weight not over than 55 Kilograms for Male worker.
4) Choose proper crowbars, shovels, hoes.
5) Using wheel cart for moving, please be careful of fingers and avoid the slope area.
6) Storage area must classified by type and provide clear access way.
7) Shelves must be strong, stable and be able to take weight.
8) Storing pipe or long materials must keep on base that prevent rolling and tip of the material must not
obstruct the walkway.
P a g e | 25

Cutting, Welding, Grinding


1. Do not weld or cut the container of inflammable.
2. Do not blow yourself before operate cutting or welding work.
3. Provide fire extinguisher at the working area.
4. Wear proper clothes to prevent from radiation and fire spark.
5. Around the welding area, worker must wear eyes protection and PPEs.
6. Use partition for safety.
7. Be careful not to let ashes or fire spark to touch with flammable materials as gas or flammable liquid.
8. Be careful when weld or cut on the overhead area because ashes or fire ball may cause danger.
9. Bring the inflammable out of the working area.
10. Before leaving the working area, must be sure that no causes of fire such fire spark etc.
11. Do not wear gloves that have oil spilled.
12. Working in pit, hole or tank must provide good air ventilation.
Electric Welding Work
1. Worker must inspect welding cable, ground cable and connecting cable before work. If broken must fix or
change immediately.
2. Ground cable must connect near the work to prevent left
electric currents.
3. Do not roll the cable to prevent accumulation of heat.
4. Welding machine must properly ground.
P a g e | 26

5. Provide air ventilate when welding.


6. Provide fire ball protection.
Welding, Cutting by Gas
1. Moving the gas cylinder must place vertically on the cart and tie tightly.
2. Gas cylinder should be kept in shade away from fire and heat.
3. Cover before moving.
4. Oxygen tank should keep separately from gas cylinder.
5. Check the gas leaking in the connection point by using soap water before use.
6. Oxygen and Acetylene cable must have a flashback arrestor.
7. Do not use gas cylinder as a roller of rolling machine.
8. Keep items that related to oxygen tank and connection cable away
from oil and grease.
9. Do not bring gas cylinder into a hole, pit or tank at any case.
10. Use light start to light a fire. Do not use lighter or match.
11. Do not use acetylene cutting nozzle with LPG gas at any case.
12. Gas connecting point must use rubber joint and tie by belt or
cord.
13. Red gas cable is for connect to LPG or Acetylene gas.
14. Install pressure control device and gauge properly with type of gas. (Right for Oxygen, Red for
Acetylene).
P a g e | 27

Chemical work
1. Label on the packages or containers of all kinds of chemicals.
2. Study the types and dangers of chemical before work.
3. Read label and follow the instruction strictly.
4. Avoid touching chemical directly.
5. Package must not be broken before moving.
6. Eating, Drinking, Smoking is not permitted while working.
7. Take off PPEs and wash your hands before eating, smoking or going to
toilet.
8. Unrelated person is not permitted to work with chemical.
9. In case of chemical leak must report to Eliminated by follow manual.
10. Used PPEs must clean or destroy by follow the instructions.
11. Wash your hands, take a shower and change clothes after work.
12. If touched by the chemicals such as acid, thinner, etc. must clean immediately.
13. Keep in the chemical storage after use.
14. Do not fire the remained chemical inside the container.
15. Do not spill or pour chemical into ground or gutter.
16. Avoid keeping or working with flammable chemical near the welding, cutting work.
P a g e | 28

Demolishing work
1) Must ask for permission follow the law.
2) Make the demolishing plan and offer to responsible person and Project Manager of Thai Shimizu.
3) Instruct worker about working method and procedure before start the work.
4) Follow the rules & regulations of customer.

Construction Underwater
1) Must make a safety plan, prevention plan and inform to worker by written.
2) Provide emergency plan and training.
3) Provide proper PPEs (Life Vest, Safety vest, etc.) enough for workers.
4) In case of using electrical equipment underwater must be a waterproof.
5) Must wear life vest at all time and vest must glows in night.
Working in confined space
Confined space means working area or working inside the things that narrow, small, bad air ventilation or has
a toxic gas, oil leak or gas leak and also lack of oxygen that cause danger as tank, pipe, ventilation pipe etc.
Dangers that may cause in the confined space are lacking of air, breath toxic, explode, burn, dust, steam,
lacking of light and noise.
1) Related worker (Operator, Controller, Watchman) must be trained before work.
2) Do not allow to work before work permit was applied and work details must be printed in the work permit.
3) Operator must wear proper PPEs.
4) Provide proper entrance and exit.
5) Provide enough proper air ventilation system.
6) Working space must have quantity of Oxygen not less than 21%
and flammable gas is 0% before operate and during the operation
properly.
7) In case of the entrance is an exit must use lifeline.
8) Provide the responsible person who can help in case of
emergency promptly.
9) Important things before work in confined space are checking the atmosphere and provided helper and
lifesaving equipment nearby.
10) Thai Shimizu’s work permit and ID card must be shown clearly in the entrance of confined spaces.
11) Risky work in confined spaces as painting, welding, cutting, chemical work or fire sparkling must apply for
a permit before work.
P a g e | 29
P a g e | 30
P a g e | 31
P a g e | 32
P a g e | 33
P a g e | 34
P a g e | 35
P a g e | 36