PROVISION OF ENGINEERING, PROCUREMENT, A02

DOC NO.
CONSTRUCTION, COMMISSIONING OF WELHEAD
PLATFORM FOR D18 PHASE 2 PROJECT
DATE
REV
DOCUMENT TITLE: 5/3/19 A
General Arrangement Drawings PAGE NO.

Comments Response Sheet (CRS)

No. Comments. Confirmation/Explanation by Status


Manufacturer
1 -To indicate Lifting lugs
-Lifting lugs shall be cast or forged into body or
welded with full penetration
2 To provide dimension of flange
- Diameter of flange
- Diameter and height of raised face
- Bolt circle diameter (BCD)
- Bolt hole quantity & Diameter
- Flange thickness
3 Indicate dimension for bore length (1.5 x Bore ID)
241.75
4 Dimension for pig entrance
5 Material for PG (Pressure Gauge)
6 Indicate close and open position on the pig door
opening
7 Fill up this info (dimension)
8 Drawing revision need to start with A

10 1-Specify hydrotest pressure and medium


2-vendor to confirm this valve design is suitable
for vertical installation
3-vendor to indicate in this GA drawing if any
particular design for vertical installation
4-vendor to provide the sealant injection
procedure in operating manual and advise the
type or grade of sealant suitable for seat material
and the frequency of injection.
5-vendor to advise if any other safety features
instead of PG. Vendor shall clearly specify the
safety features in operating manual.
6-provide angle and dimension of vent and drain
valve
11 Provide mounting details of drain/vent valves and
PG
12 Provide with metal cap to prevent leaking
13 Specify boltholes no, sizes and PCD
14 Lifting shall be cast or forged into valve body or
full penetration weld
15 Shall be 2.0 mm raised face
16 Why those dimensions are blank
17 Shall be provided with built in check valve
18 Bolting material shall be b8m cl1
19 Specify material of PG
20 Indication of open or closed door
21 Drawing revision need to start with A

22 To match flange piping spec 6S701 (10” SCH160


pipe)