Load Point Load Case FX (kN) FY (kN) FZ (kN) MX (kN-m) MY (kN-m) MZ (kN-m) MX + Fy MY+Fx
LC 1 0 0 -12 0 0 0 0 0
LC 2 9 1 -3 2 -16 0 3 -7
LC 3 0 0 0 0 0 0 0 0
LC 4 -2 0 1 1 2 0 1 0
LC 5 0 -13 0 -46 0 0 -59 0
217
LC 6 0 0 1 0 0 0 0 0
LC 7 0 0 0 0 0 0 0 0
LC 8 -5 0 3 1 6 0 1 1
LC 9 0 -18 0 -59 0 0 -77 0
LC 10 0 0 -14 0 0 0 0 0
9 1 3 2
-5 -18 -14 -59
DOC:
GODREJ BOYCE LTD DESIGN OF FOOTING
REV : R0
COLUMN/PEDESTAL
Depth of footing from NGL = 1
Length (l, dim. || Z axis ) = 450 mm
global
Breadth (b, dim. || X axis) = 450 mm
Y
Height of pedestal = 0.8 m Breadth 2 m
FOOTING global
global
Foot length (L, dim. || X axis) = 1.4 m X
X
Foot Breadth (B, dim. || Y axis) = 2 m
Thickness of footing (t) = 200 mm global
Clear cover to Reinforcement = 50 mm Y
Main bar dia of footing = 12 mm
Effective depth of footing = 144 mm Length 1.4 m
Selfweight of the footing = 1.40 T Footing Dimensions
Area of Footing(A) = 2.80 m2
Sect mod of foot about X axis (Xz) = 0.93 m3
Sec mod of foot about Y axis (Yx) = 0.65 m3
MATERIALS OF CONSTRUCTION
2
Grade of concrete fck = 25 N/mm
2
Grade of steel fy = 500 N/mm
CALCULATION OF PRESSURES
P (T) Moments (T.M) Soil
Pmax Pmin Actual /
Load Case (Incl self wt overstress
(T/m2) (T/m2) Allowable
+ soil wt MX(@X) My(@Y) Factor
217
LC11 5.34 0.000 0.000 1 1.91 1.91 0.29
LC12 5.44 0.204 0.357 1 2.71 1.18 0.34
LC13 5.49 2.854 0.357 1 5.56 -1.64 0.71
LC14 5.44 0.153 0.357 1 2.65 1.23 0.34
LC15 5.49 0.153 0.357 1.25 2.67 1.25 0.34
LC16 5.62 0.204 0.306 1.25 2.69 1.32 0.34
LC17 6.14 0.173 0.336 1.25 2.89 1.49 0.37
LC18 5.77 3.772 0.357 1.25 6.65 -2.52 0.85
LC19 6.20 1.417 0.357 1.25 4.28 0.15 0.55
2
Maximum bending moment = 4.96 x 0.775 = 1.49 tm
2
Factored maximum moment = 1.50 x 1.5
= 2.22 tm
Effective depth d = 120 mm
1.0
0.2
2.00
Factored Total vertical load = 2.11 x 1.5 = 3.17 T
Factored Moment at the base of the pedestal =( 3.17 + 0.53 ) x 1.5 = 5.54 Tm
Since Load is is very less only minimum reinforcement as per cl. 26.5.3(b) of IS 456 will be required.
Minimum Ast required = 0.8 % of the concrete area required to resist direct vertical load