Вы находитесь на странице: 1из 9

15/04/2018

Sistem Panas
Bumi
Pertemuan-6
12-April-2018
(Sachrul Iswahyudi)

Ninik Rina H (2012), Course of "Training for trainer":


detailed exploration, selecting a test site for geothermal resources

Ninik Rina H (2012), Course of "Training for trainer": Ninik Rina H (2012), Course of "Training for trainer":
detailed exploration, selecting a test site for geothermal resources detailed exploration, selecting a test site for geothermal resources

1
15/04/2018

Ninik Rina H (2012), Course of "Training for trainer": Ninik Rina H (2012), Course of "Training for trainer":
detailed exploration, selecting a test site for geothermal resources detailed exploration, selecting a test site for geothermal resources

Ninik Rina H (2012), Course of "Training for trainer": Ninik Rina H (2012), Course of "Training for trainer":
detailed exploration, selecting a test site for geothermal resources detailed exploration, selecting a test site for geothermal resources

2
15/04/2018

Ninik Rina H (2012), Course of "Training for trainer": Ninik Rina H (2012), Course of "Training for trainer":
detailed exploration, selecting a test site for geothermal resources detailed exploration, selecting a test site for geothermal resources

Sejarah Pengembangan
Panasbumi di Indonesia
Sachrul Iswahyudi
3-Mei-2016

Ninik Rina H (2012), Course of "Training for trainer":


detailed exploration, selecting a test site for geothermal resources

3
15/04/2018

Potensi Panasbumi Indonesia


Pengembangan Lapangan Panasbumi

April 2008)

Potensi Panasbumi Indonesia


Potensi Panasbumi Indonesia

Potensi Panas Bumi Indonesia tersebar di 253 lokasi dengan total potensi sebesar 27 ribu MW

16

4
15/04/2018

Geothermal Road-Map by 2025 Kamojang


•Lapangan panasbumi
pertama di Indonesia
2004 2008 2012 2016 2020 2025

822 MW 2000 MW 3442 MW 4600 MW 6000 MW 9000 MW ?


(produksi) (target) (target)

1193 MW
Existing
1442 MW
Existing
1158 MW
Existing
1400 MW
•Sistem dominasi uap
•Pertama kali berproduksi
New WKP
WKP WKP WKP
+ New WKP

1978
2004 2008 2012 2016 2020 2025

Geothermal Road - map

Kamojang Geomorfologi Kamojang

5
15/04/2018

Kamojang Litologi Kamojang


• Gunung api Tipe C
• Tidak ada lubang letusan
• Manifestasi geotermal (fumarol, mud pools, mata air
panas dan semburan uap air mendidih)
• Korelasi antar sumur:
• Fm. Pangkalan
• Fm. Gandapura
• Gunungapi tua, Plistosen

Struktur Kamojang Kamojang

6
15/04/2018

Jumlah sumur Produksi Besar Produksi lapangan Kamojang


•Sumur produksi : 32 buah
•Sumur injeksi : 6 buah •Besar produksi di lapangan kamojang
adalah 200 MW
•Sumur yang tidak dimanfaatkan : 13 buah
•Telah dimanfaatkan 140 MW
•Sumur monitoring : 32 buah
•Kedalaman sumur 1000 – 1500 m

Pemanfaatan energi yang dilakukan Kamojang – Kawah Kereta


•Pembangkit listrik tenaga uap
•Pemanas untuk Media jamur
•Keperluan mandi dan kolam renang
•Geowisata

7
15/04/2018

Kamojang Geothermal Field

dari: Bramantyo, Pertamina

Sumur Produksi Pembangkit Listrik Tenaga Pabum


Power House Cooling Tower

MT-4

8
15/04/2018

Eksplorasi Pengembangan Komersial

Pembangkit Listrik Tenaga Pabum


• 2 tahun 2-3 tahun 25-30 tahun

Dari Pertamina, 2007

Fasilitas Produksi

Sekian & Terimakasih


Sachrul Iswahyudi