Вы находитесь на странице: 1из 1

High water level design

(Tie rod anchor plate section


profile)

(the elevation( height) in the drawing (the employer provides the elevation reference) in
meters(m) and others in cm.
(Concrete Strength level: Parapet, anchor plate and sheet pile are all C35 type).
(The position of the deformation joint of the cast-in-situ Parapet is shown in the elevation, and the asphalt
linoleum (bitumen linoleum board) is filled between the deformation joints. The length of the unit can be
adjusted appropriately, but the deformation joints should be placed at the joints of the sheet piles. After the joint,
100cm wide woven geotextiles are placed on the soil surface, and the joints are laid in two cases. The geotextile
(Mud surface elevation specifications are 320g/m?
design) (The distance between the drawbars is 1.5m, the lower pad is 15×15cm C15 plain cushion, and the tie rod is
also arranged)
(() The middle elevation is the bottom elevation of the pile, the corner pile and the pile at the joint)
(Each 21m of the parapet is provided with expansion joints. The joints are separated from the piles. The 2cm asphalt
linoleum (bitumen linoleum board) is embedded in the joints. After the joints are laid 100cm wide and 320g/m, the
woven geotextiles are spread on both sides).

(Drainage body) DISC. SIGN. DATE

DRAWN
2017057
JOB NO.
CHKD. AARANO NIGERIA LIMITED
3
DISC. structure
APPR. 2×5000m Spherical Tank Station Project
DES.STAGE
SHARELINE PROTECTION
SCALE See Figure

Lagos, Nigeria 2018.04 2017057-206-S-02


COUNTERSIGNED Location DATE Sheet of DWG.NO.