Illustrate a technical competency you have learned.
WRITE the skill at the TOP CENTER of the page.
LIST the tools/instruments needed to complete the task. LIST the materials/ingredients needed to complete the task. LIST all safety concerns to be considered before completing this task. (OSHA or ServSafe) WRITE a detailed step-by-step explanation of how to complete the skill. (Think Process Paper!) WRITE a brief paragraph describing your personal experience(s) related to completing this skill. Include illustrations, especially photographs of video, of you demonstrating the skill.
*You may have several pages detailing each skill. Remember, you want to be as thorough as possible.
Joining Cast Iron Pipe
With Lead and Oakum
Often when working on rough plumbing in a house, we are asked
to put in a drainage system. If it includes metal drain pipes, it is necessary to join the cast iron pipe with lead and oakum.
Experience: I have worked with lead and oakum in
the Plumbing & Heating shop at Upper Cape Tech. We set up a mock drainage system using lead pipes. I also worked on a project with lead pipes when repairing the school building at Otis Air Force Base. We installed new lines for the bathrooms there and had to ensure drainage was set up properly.
Tools and Materials
Caulking Tools Long Packer
Ladle Heating Pot Hammer Oakum
The Process Safety Considerations
What OSHA regulations are you required Literally begin a step-by-step explanation to follow while completing this task? Eye protection 1. 2. Include very specific/detailed instructions. Gloves 3. Fire safety 4. etc.