QUANTITY MEASUREMENT

Excavation - Top soil

Times Dim Result Description Unit Qty


Excavation
W.B.L.F.F
Excvt.topsoil
Length
6.000
Add fdn.spr. (AP1)
1.2
Less st.
0.25 0.950
6.950

Width
8.100
0.950
9.050

6.95 Excvt, top soil for preservn.avg. 100


9.05 62.90 mm deep m2 62.90
6.95 Deep. preserved top soil in temp.soil heaps avg.
9.05 10.00 m dist
0.10 6.29 m3 6.29
Excavation
W.B.L.F.F
Excvt.topsoil
Length
6.000
Add fdn.spr. (AP2)
1.4
Less st.
0.25 1.650
6.950

Width
8.100
1.650
9.750

7.65 Excvt, top soil for preservn.avg. 100


9.75 74.59 mm deep m2 74.59
7.65 Deep. preserved top soil in temp.soil heaps avg.
9.75 10.00 m dist
0.10 7.46 m3 7.46
Excavation
W.B.L.F.F
Excvt.topsoil
Length
6.000
Add fdn.spr. (AP3)
2.2
Less st.
0.25 2.450
8.450

Width
8.100
2.450
10.550

8.45 Excvt, top soil for preservn.avg. 100


10.55 89.15 mm deep m2 89.15
8.45 Deep. preserved top soil in temp.soil heaps avg.
10.55 10.00 m dist
0.10 8.91 m3 8.91
Excavation – Reduced Level

Times Dim Result Description Unit Qty


(AP1)
Surc.excvn
Depth
conc. bed 0.125
hardcore 0.150
0.275
Less topsoil
excvn 0.100
0.175
6.95
9.05 Excvt.to.red.levmaxdepthn.c
0.18 11.32 250mm m3 11.32
& REM.excvt.mat.from site.
(AP2)
Surc.excvn
Depth
conc. bed 0.125
hardcore 0.150
0.275
Less topsoil
excvn 0.100
0.175
7.65
9.75 Excvt.to.red.levmaxdepthn.c
0.8 59.67 250mm m3 59.67
& REM.excvt.mat.from
(AP3)
Surc.excvn
Depth
conc. bed 0.125
hardcore 0.150
0.275
Less topsoil
excvn 0.100
0.175
8.45
10.55 Excvt.to.red.levmaxdepthn.c
0.8 71.32 250mm m3 71.32
& REM.excvt.mat.from
Excavation – Pad footing

Times Dim Result Description Unit Qty


AP1
Pit. excvn.
depth
binding. 0.050
ftg. 0.250
stump. 1.250
1.550
Less excvn.
top soil 0.100
red. lev 0.175 0.275
1.275
2/ 1.2 Excvt. pit to rec. col. Bases startg. from red.
1.2 lev. max. depth n.e 1.00m
1.28 3.68 (ln No. 4) m3 3.68
&
Fillg. to excvn. w. mat. arising from excvn

10 1.2 E.o pit excvn. for excvtg. in rock


/
100
1.2 (Prov.)
2/
1.28 0.37 m3 0.37
AP2
Pit. excvn.
depth
binding. 0.050
ftg. 0.250
stump. 1.250
1.550
Less excvn.
top soil 0.100
red. lev 0.175 0.275
5/ 1.4 1.275
1.4 Excvt. pit to rec. col. Bases startg. from red.
1.28 12.54 lev. max. depth n.e 1.00m
(ln No. 4) m3 12.54
&
Fillg. to excvn. w. mat. arising from excvn

10 1.4 E.o pit excvn. for excvtg. in rock


/
100
1.4 (Prov.)
5/
1.28 1.25 m3 1.25
AP3
Pit. excvn.
depth
binding. 0.050
ftg. 0.350
stump. 1.150
1.550
Less excvn.
top soil 0.100
red. lev 0.175 0.275
5/ 2.2 1.275
2.2 Excvt. pit to rec. col. Bases startg. from red.
1.28 30.98 lev. max. depth n.e 1.00m
(ln No. 4) m3 30.98
&
Fillg. to excvn. w. mat. arising from excvn

10 2.2 E.o pit excvn. for excvtg. in rock


/
100
2.2 (Prov.)
5/
1.28 3.10 m3 3.10
Excavation – Trench for ground beam

Times Dim Result Description Unit Qty


W.B.L.F.F. (cont’d)

Tr. excvn.

length
6.000
Less col.st
2/0.250
0.500
6.500

depth
0.400

Add blind. 0.500


0.450
Less excvn.
top soil 0.100
red. Lev 0.175
12/ 6.5 0.275
0.2 0.175
0.18 2.81 Excvt. tr. to. rec.grd.bm.starting from red.lev. m3 2.81
Depth n.e. 0.25m
& Rem.excvn.mat. from site

10 6.5 E.O. tr. excvn. For excvtg. in rock


/
100
0.2 (Prov.)
12/
0.18 0.28 m3 0.25

Item Allow for keeping the surfacespf the site


& excvn free of suf. water
Concreating – Blinding and Concreate

Times Dim Result Description Unit Qty


Blinding and Concrete col. bases

AP1
2/ 1.2 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
1.2 on earth
0.05 0.14 & m3 0.14
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
2/ 1.2 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
1.2 [(ln No. 4)
0.25 0.72 [& m3 0.72
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn

2/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.25 0.16 stump m3 0.16

Blinding and Concrete col. bases

AP1
5/ 1.4 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
1.4 on earth
0.05 0.49 & m3 0.49
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
5/ 1.4 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
1.4 [(ln No. 4)
0.25 2.45 [& m3 2.45
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn

2/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.25 0.16 stump m3 0.16
Blinding and Concrete col. bases

AP3
5/ 2.2 [Conc. Gr.C15 blindg. ne 100mm thk. Laid
2.2 on earth
0.05 1.21 & m3 1.21
Rem. excvtd. mat. from site
&
[Ddt. Fillg. to excvn. w. mat. arising from
excvn
5/ 2.2 [Reifd. insitu conc. Gr.C30/37 in isol. fdn. bases
2.2 [(ln No. 4)
0.35 1.69 [& m3 1.69
[Rem. excvnd. mat. from site
[&
[Ddt. Fillg. to excvn. w. mat. arising from excvn

5/ 0.25 [
0.25 [Reinfd. insitu con.Gr.C30/37 in isol. col.
1.15 0.07 stump m3 0.07
Concreating – Removal of excavated material

Times Dim Result Description Unit Qty


W.B.L.F.F. (cont’d)

Vol. of stump int pit


ht
1.250
Less excvn
top soil 0.100
red.lev 0.175
0.275
7/ 0.25 0.975
0.25 [Rem. excvtd. mat. from site
0.98 0.48 [& m3 0.48
[Dat. Fillg. to excvn. w. mat. arising from excvn

W.B.L.F.F. (cont’d)

Vol. of stump int pit


ht
1.150
Less excvn
top soil 0.100
red.lev 0.175
0.275
5/ 0.25 0.875
0.25 [Rem. excvtd. mat. from site
0.88 0.28 [& m3 0.28
[Dat. Fillg. to excvn. w. mat. arising from excvn
Formwork – Column Stump

Times Dim Result Description Unit Qty


AP1/AP2 stump
gth.
7/0.250 1.75

7/ 1.75 [Fwk. to sides of isol. col. Stump


1.25 15.31 [ m2 15.31

AP3 stump
gth.
5/0.250 1.75

5/ 1.75 [Fwk. to sides of isol. col. Stump


1.15 10.06 [ m2 10.06
Steel Reinforcement

Times Dim Result Description Unit Qty


Reinft.bars in isol.col.stump
stump
length
fdn. 0.250
stump. 1.250
lap in col. 0.250
1.750
Less
conc. cov. 0.050
fdn.bars
2/0.016 0.032 0.082
1.668
Add bend 0.200
1.868

12/12 1.87 269.28 [16 mm Dia.b.t. steel. in strt. & bent bars in m 269.28
[isol.com.stump

Links
gth.
width 0.200
Less
conc. cov 2/0.010 0.02
4/0.180
=0.720

Add
hooks 24/0.008 0.192
0.912

W.B.L.F.F. (cont’d)
4/ [
6/ 0.91 21.84 [8mm Dia. m. s reinft. in links in isol. col. Stump m 21.84
Steel Reinforcement – Blinding and Concrete

Times Dim Result Description Unit Qty


Blindg. to grd. bm.
length
6.000
Less 2 stumps
2/0.250 0.500
5.500

4/ 5.5 [
0.2 [Conc. Gr.C15 blindg. n.e. 100mm thk. Laid on 0.22
3
0.05 0.22 earth m
[

4/ 5.5 [
0.15 [Reinfd. In.situ conc Gr. C30/3 in grd.bm
0.40 1.32 [ m3 1.32
Steel Reinforcement – Formwork

Times Dim Result Description Unit Qty


Fwk. to fdns & beds
Fdn
4/1.200 4.800

4/ 4.8 19.2 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 19.2
[n.e. 500 mm high

Fwk. to fdns & beds


Fdn
4/1.400 5.600

4/ 5.6 22.4 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 22.4
[n.e. 500 mm high

Fwk. to fdns & beds


Fdn
4/2.200 8.800

4/ 8.8 35.2 [Fwk. to edges & faces of fdn. exceeds. 250mm & m 8.8
[n.e. 500 mm high

4/4 5.5 44 [Fwk to grd.bm. exceed. 250mm & n.e. 500mm m 4.4
[high
Steel Reinforcement

Times Dim Result Description Unit Qty


Pad ftg.
length
1.200
Less
conc. cover b/s
2/0.0050 0.100
1.100
Add
2 bends 0.300

Less
2 conc. cover 0.080
2/0.220 0.440
1.540

4/ [mm Dia. h.t steelreinft. In strt. & bent bars in m 61.6


10/ 1.54 61.6 [fdn. (pad ftg)

W.B.L.F.F. (cont’d)

grd.bm.
length
6.000
Less con. cov.
2/0.0050 0.100
5.900
Add 2 bends
2/0.300 0.600
6.500

4/ [12 mm Dia.h.t. steel reinft. In strt & bent bars in


4/ 6.5 104 [fdn. m 104
stirrups
grd.bm.
width. 0.200
Less
cov. 2/0.050 0.100
0.100
ht. 0.500
Less
cov. 2/0.050 0.100
0.400
2/0.5
=1.00
Add
hooks 24/0.008 0.192
1.192

4/ [8mm Dia.m.s.reinft.in stirrups in fdn


28/ 1.19 133.16 (grd.bms. m 133.16
Hardcore & Damp Prove Membrane

Times Dim Result Description Unit Qty


H/c & D.P.M

length
6.000
Less
6 stumps 6/0.25 1.500
7.500

width
8.100
Less
6 stumps 6/0.25 1.500
9.600

W.B.L.F.F. (cont’d)
7.5 [Fillg. to make up lev.avg 150mm thk.w.h/c. of m2 72
9.6 72 [clean hard broken stones obtained off site
[&
[Polyethlene not less than 1000gauge horiz.d.p.m
[lapp.d 100mm at jts. Laid on h/c

7.5 [Conc. Gr.C30/37 in bed 100 mm. 150 thk. Laid


9.6 on h/c
0.13 9.36 [ m3 9.36