1st December,
December 2015 Hilton Hotel , Nay Pyi Taw
U Tint Lwin Oo
Dy‐Director
D
Department of Electric Power Planning
t t f El t i P Pl i
Brief Introduction
No. of Potentials Installed Capacity
¾ < 10MW 210 231.25 MW
¾ Bet; 10MW & 50MW 32 806.3 MW
¾ > 50 MW 60 45293.0 MW
T t l
Total 302 46330 55 MW
46330.55 MW
Investigation before May ,2009 in Myanmar
Ministry of Electric Power (MOEP)
MOEP
YESC/MESC
Grid‐‐Connected Generation
Grid
14000
12000
Generatioon (GWh)
Existing (Installed Capacity) 10000
8000
3.1%
% 6000
25.5 4000
% 2000
71.4
71 4 0
%
High Case
High Case Low Case
Low Case
18000
16000
14542 MW
14000
12944
12000
11520
MW
10000 10253
9100 MW
8121 9125
8000 8353
7227 7668
6431 7039
6000
6461
4531 5092
5723
5443 5930
4996
4032 4585
4000 3587
3192 4208
2840 3862
2248 2527 2884
3178 3503
2000 2055 2617
2055
2157 2376
0
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
YEAR 5 5
Power Supply Strategies
25 3151
((1)) By
y sole investment of Ministry
y
(2) B.O.T by local entrepreneur
(3) JV/B.O.T by foreign investor
Hydropower
Procedures for Joint Venture Development
Project Proposal to
Signing MOU
Ministry of Electric Power
(MOEP)
FSR & FA Study and Evaluation
ESIA/ CSR
Signing JVA Signing MOA
Approved by MOECAF
Legal Opinion
Concession Right
JV Co. Certificate
Proposal to
Myanmar Investment Project Implementation
Commission (MIC)
EIA Standards for Power Projects
Sr No. Resources IEE( Initial Environmental Enquiry) EIA( Environmental Impact Assessment)
1 Hydropower
(a) Reservoir Type <15 MW ≥ 15 MW
Storage Capacity <200 MCM Storage Capacity ≥ 200 MCM
Water Shed Area <1500 hectare Water Shed Area ≥1500 hectare
(b) Run of River Type 2‐10 MW ≥10 MW
(c)Hydropower+ ‐ Dam Height > 15 m
Water Distribution Distribution Area > 40 hector
Water Shed Area > 1500 hectare
2 Fossil Fuel Power Plant ≥10 MW
3 Natural Gas 5‐50 MW ≥50 MW
4 Coal 5‐10 MW ≥10 M
5 Wind ‐ Land/Water Area ≥ 100 Hectare
6 Solar 1‐5MW ≥ 5 MW
Land Area ≥ 100 Hectare
7 Hybrid ( Gas+ Thermal) ‐ All
8 Geo thermal
Geo‐thermal 5 10 MW
5‐10 MW ≥10 M
≥10 M
9 Nuclear ‐ All
10 Transmission Line
((a)) < 230 KV < 50 Km ≥ 50 km
(b) ≥230 KV All Pass through Living Area/ conservation
area
11 Substation (High Voltage) Land Area < 10 hectare Land Area ≥ 10 hectare
Present Conditions of Hydropower Projects’ ESIA
Sr.No Installed Company/
Project Name Capacity(MW) Organization Remark
1 Upper Thanlwin 1400 KHIDI,BANCA Approved
( Kunglong)
2 Shwe Li (2) 520 KHIDI ,REM Approved
8 D Doke
Dee D k 66 TEAM TBS
TEAM,TBS P
Preparing
i
TEAM = TEAM Consulting Engineering and Management Co.,Ltd
TBS = Total Business Solution Co.,Ltd
REM = Resource and Environment Myanmar
NEPS = National Engineering & Planning Services Co.,Ltd
SMEC
SMEC = Snowy Mountain Engineering Cooperation
S M t i E i i C ti
ECCDI = Ecosystem Conservation and Community Development Initiative
Santac = Santac Technologies
Upper Thanlwin ( Kunglong) Hydropower Project
Naung Pha/ Mang Tong Hydropower Project
Nawchankha (Cascade)Hydropower Project
Challenges
MOEP has a great pressure to fulfill high
MOEP has a great pressure to fulfill high‐rising
rising electricity demand.
electricity demand
Need to Overcome ESIA to construct HP projects
¾Public Awareness
¾ Public Consultation
Insufficient Human resources
Insufficient Human resources
49 HP ProJects (41239 MW)Planed to be constructed.
( )
? ?
? ? ?