S.NO DATE SHIFT EMP CODE JOB DESCRIPTION


1 13.6.2018 A 4 GB603 A BLOWER FILTER RENEWAL

2 14.6.2018 A 3 JD 1308 BAGFILTER AIR LINES DE PLUGGING IN PROGRESS. Modification lin


1 JD 640 PM CHECKS DONE.
BELT REPAIR STRIP ALONG WITH SC 8000 SOLUTION AND HARDNER ISSUED
1 jd 612 Gear box oil renewal done.
1 pipe folded between F75 to F90 due to material continuous crush out prob

3 18.6.2018 1 jD640 take up durm north side repair done.gussets and hub welding done.
1 JD 640 belt center groove repair done (4 mtrs)
2,3 jd 615 screw gear box base bolts checked,pm check done.
2,3 jd 602 pm checks done
4 jd 619 damaged cold joint repair done.(3 mtrs)

4 20.6.2018 1 GB 603A blower greasing done. Oil level checking done.


1 jd 640 tail drum greasing done

5 21.6.2018 1 Near miss jobs atended today near jd 619 take up, jd 615 handrail, jd 640 h
general pm checks of all equipments

6 22.6.2018 1 pipe conveyor south side skirt rubber renewal done


2 jd 1307 area fire water reel renewal done.
2 area house keeping done.

7 23.6.2018 1 jd 640 pm check done, belt side edge cut observed. To be repair
wire rope sling dia22 14 mtr length sended to moshin enterprises th
JOB DESCRIPTION REMARKS

IN PROGRESS. Modification line fabrication in progress.

OLUTION AND HARDNER ISSUED FROM WARE HOUSE.

terial continuous crush out problem.made noraml shut down 15 min

gussets and hub welding done.


rs)
m check done.

trs) pap shut down for 4 hrs (cloth renewal)

ecking done.

ake up, jd 615 handrail, jd 640 handrail repair.

wal done 0.5 hrs shut down during skirt rubber renewal

dge cut observed. To be repair in coming oppturnity.


ended to moshin enterprises threw RMGP by our vechile.