100%(2)100% нашли этот документ полезным (2 голоса)
484 просмотров3 страницы
This document provides a normal operation checklist for an Eclipse 550 NG aircraft for simulation purposes only. The 3-sentence summary is:
The checklist outlines the preflight, engine start, taxi, takeoff, climb, cruise, descent, approach, landing, shutdown procedures and includes checks of systems, controls, instruments and configuration settings at key points during the flight. Precautions are noted to not retract flaps if icing conditions occurred and checklists must be completed for each phase of flight from preflight inspections to securing the aircraft after landing.
This document provides a normal operation checklist for an Eclipse 550 NG aircraft for simulation purposes only. The 3-sentence summary is:
The checklist outlines the preflight, engine start, taxi, takeoff, climb, cruise, descent, approach, landing, shutdown procedures and includes checks of systems, controls, instruments and configuration settings at key points during the flight. Precautions are noted to not retract flaps if icing conditions occurred and checklists must be completed for each phase of flight from preflight inspections to securing the aircraft after landing.
This document provides a normal operation checklist for an Eclipse 550 NG aircraft for simulation purposes only. The 3-sentence summary is:
The checklist outlines the preflight, engine start, taxi, takeoff, climb, cruise, descent, approach, landing, shutdown procedures and includes checks of systems, controls, instruments and configuration settings at key points during the flight. Precautions are noted to not retract flaps if icing conditions occurred and checklists must be completed for each phase of flight from preflight inspections to securing the aircraft after landing.
NOT FOR REAL OPERATION! PREFLIGHT ENGINE START CLIMB MISSES APPROACH/GO-AROUND Pitot Cover & Chokes REMOVED SYS BATT Voltage CHECK, 23V Minimum 10,000 feet Throttles MAX Engine Selectors OFF Strobe/beacon switch BEACON Pressurization CHECK Pitch 0° Nose Up Sys Batt Switch ON Throttles IDLE Landing Lights OFF Flaps T/O Fuel Quantity CHECK QTTY START BATT switch ON 18,000 feet Gear UP Power lever IDLE R ENGINE Selector ON/START or Transition Altitude Altimeter SET STD Do Not retract the flaps to UP Parking brake SET Engine Instruments CHECK if the flaps were extended while in icing conditions. CRUISE Flaps (400 ft AGL) UP Gear handle DOWN, 3 GREENS L ENGINE Selector ON/START Cruise Power SET All light switches OFF Engine Instruments CHECK Engine Instruments MONITOR Flaps SET T/O L&R GEN Switches AUTO Pressurization MONITOR Rudder pedals ADJUSTED GPU (if connected) DISCONNECT AFTER LANDING Oxygen MONITOR Flight controls CHECKED Do Not retract the flaps to UP Fuel Quantity MONITOR Trims CHECKED if the flaps were extended while in icing conditions. BEFORE TAXI FMS setup COMPLETED Flaps UP Trims (PITCH, ROLL & YAW) SET TAKEOFF DESCENT / APPROACH External Lights AS REQUIRED Landing data RECEIVED Air Source switch AS REQUIRED Flaps SET TAKEOFF Windshield Defog AS REQUIRED Ice Protec. OFF or AS REQUIRED BEFORE ENGINE START Ice Protec. AS REQUIRED GPU (If Required) CONNECT Ice Protec. AS REQUIRED External Lights AS REQUIRED Door CLOSED, Altimeter SET Current BARO Taxi and Takeoff Briefing COMPLETE Green Flag Landing lights AS REQUIRED Parking brake RELEASED Oxygen control PULL ON Approach Setup and Brief COMPLETE SHUTDOWN Oxygen pressure CHECK TAXI Throttles STABILIZE 1MN AT Air Source switch AS REQUIRED Brakes RELEASE, CHECK IDLE L&R GEN switches OFF Flight Instruments CHECK Parking brake AS REQUIRED BEFORE LANDING Bus Tie switch AUTO Transponder CODE/MODE CHECKED Gear DOWN, 3 GREENS Air Source switch R,L,OFF Annunciators/Lamps TEST Brakes CHECK Engine Selectors OFF ELT switch ARMED Flaps LDG All External lights OFF External Lights AS REQUIRED BEFORE TAKEOFF Start Batt Switch OFF Autopilot & Yaw Damper OFF T/O config OK CHECK DISPLAYED GEAR THREE GREEN L GEN Switch OFF Air Source Switch NORM Fuel Quantity CHECK R GEN Switch OFF External Lights AS REQUIRED Parking Brake SET Bus Tie Switch OFF Transponder MODE CHECKED ATIS, Clearance Obtain Sys Batt Switch OFF Altimeter SET BARO Pitot, Static, & Engine Covers AS REQUIRED COM/NAV/XPDR/GPS SET FOR AFTER TAKEOFF DEPARTURE Gear (positive rate of climb established) UP Flaps (400 ft AGL) UP Yaw damp ON Throttles MCT Ice Protec. AS REQUIRED FOR SIMULATION ONLY! NOT FOR REAL OPERATION!