Академический Документы
Профессиональный Документы
Культура Документы
INSTRUCTIONS T 0 8 10
Project Lotsafee House UNREGISTERED COPY
Concrete Innovation & Design ENTER DATA IN BLUE/MAGENTA CELLS
ONLY. fbu = 2.958 79 10 12
Client BigBucks PLC Made by Date
Page RED MESSAGES INDICATE ENTRY ERRORS. Fs = 77779 113 12 16
Location Pilecap G14 Double Pilecap Rod 17-
Mar-19 101 THIS PAGE for DOUBLE PILECAPS ONLY. bond L = 524 201 16
20
PILECAP DESIGN to BS 8110:1997
Checked Revision Job No v max = 4.733 314 20 25
804 32 40
MATERIALS fcu 35 N/mm� h agg 20 mm gc 1.5 concrete
1257 40 40
fy 460 N/mm� T&S cover 50 mm gs 1.05 steel Concrete
Innovation & Design
Pile capacity 200 kN Btm cover 75 mm Conc density
23.6 kN/m�
DIMENSIONS mm PILECAP
COLUMN A = 400
� = 350 B = 1500
� = 350 C = 400
M
H
REINFORCEMENT PILE REACTIONS kN
0
BOTTOM M = 156.5 kNm PILE 1 PILE 2
. 0
"d = 309.0 mm, As = 1,243 mm�" Gk + Qk
147.4 192.2 . 0
7 T16 B " = 1,407 mm�" Gk + Qk +Wk 159.3 207.7
. 0
TOP M = 0.0 kNm . 0
Gk + Qk 147.4 192.2 .