Вы находитесь на странице: 1из 3
Chief Engineer (H), NABARD & Rural Roads, Chennai - 25 For the year - 2018 -2019 - (w.e.f - 01.06.2018) Model Data for Centering City Limit - 10% for Labours. 1A) DATA FOR CENTERING WORKS [S101 coniorng for sides and soffis including Supports and Siang Tor plane Sata such a8 RCC slab, rectangular beams, T or beers line blocks, staease waist ana | fanatng slab, landing beams, canopy et, wih al cess bracings sing mid sta |sheets of size 90em x 60am x 10 gauge stifened with welded mideteel angles of size | 25x 25 x 6mm for boarcing taid over siver oak (county wood) jes of size 40am x | [80 cum (epaced at about 90 cm cle) and supported by casurina props of 10-13 en | ea (spaced at 75 om cle) complete. | ceed \ (Cost ofS sheets and angels for each set | Weight of f'8 sheet: dem x Gem x 100=| 2.924 Kgieqm 3.175 x 7850 1000 | ‘00m x0.800m x24 62 43.468 ikolsqan \Vieight of MS Angle of size 25% 26x Smm= 409 [3.60mx 1-1 4kgtm | i 43480 Kg. [Cost of MS sheets, (Si. lem No. 111) | 4050 kg | 8.9 400 | Ke |Cost of Angect size 28 x 25 x’3mm Faso | ky | 46200 (SI ltom No, 112), : i 47.46 | Kg’ |Add fo euting, bending & welding 30:10 | ky so. | (SI.No. 168 R.2) | | feree} Sundties o7e | 1 ToraL| 7246.00 Sub-Data- (2) T [Gest OFS angles and Angles and Siver oak] 1000 1 Samm country wood jist tem x 6.5cm at about £0 om | | centre to centre etc. | | 1 | Nos. Coit otis ens and Sheet tA 121600. | Each) 2310889 (Foal ep 2at0d.aa | ‘Cost for single use | ast0a.92/40 PF) | pea 0:43 | cum Siver ook county wood joists Tem Scmatl 1484700 | Cum’ 478464 | abcut 'om cone to conve ete (Gah tem No. | | 77D) i | fort ac a | |Steel props 40 x 11.10 x 68 /40 for tuse | [___7e409 ro bo petaa| | [Cost for single use | Rs. lant 43 MAIN DATA 1.00 | Use” [Cost of M.S sheels and angles cost 577.60 | 877.60| 1.00 | Use ost of sliver oak joists size (103 Sci) a 900m 1414.48 | | anata centre t use Do Tiel 0% for corporaton area | 3.8 | Nos. (Carpenter 1st class. (SI. Item No. 11). Rs.61050 | Each i 2319.90| 5.4 | Nos. |Mezdoor 4st class. (SI. Item No. 39A) Rs.390.50 | Each 2108.70] I | Bach | 1of3 4.0 | Nos. ‘Fitter 2nd class. (SI. Item No. 194) Rs.513.70 | cacn | 613.70 ‘Add for welding grils, nails et. Ls 2.00 ’Add for Oling for MS sheet and edges. ws 7 1665 i i Sundries, 0.39] | Total | 66686,00|/10 sqm Rate Por Tsqm fa] Above Sili Level 668.60)" sam |Steol centering for foundation of retaining wal, Abulments, Pers, Bad block cum Din wail ove |Abutments, Crash borer, Base Course below Approach slab and Approach sla 4.00 | $4.m ‘Centering ate | Rs008.60 | Sam) 68860 [Deduct {or strutting charges | 0 1144 | ! Bolow Sill Level: 587.48) | ‘Gontoring fr Vertical Surtaces | 1 100 5.66860 | Sqm 668.60 "10% Evra for Vertical surface Rs.66.86 | Sam 66.86} 8 feundies big oad | Total | 736.00 i RS. 736.00 | Centering for Pier Column t my 400 | sain Centering at | astaseo” | sam) noo 100% Exra fr Vertical surface | Rs@60.00°| Sam |” 66d | LS ‘Sundries ee ery.) ! Total 56.00 Centering for Capping Beam. poet 1.00 | Sqm |Centering rate 5.66860 | Sam 668.60 50% Extra for Vertical surface 5.33430 | Sam) 33430 LS Sundries Ls 010 Total 7005.00 16) DATA FOR CENTERING WORKS [Steel centering for sides and Soffits Including supports and strutting for plane surface such as] RGC slab, rectangular beams, "T* of "L’ beams lintel blocks, staircase waist and landing slab, landing beams, canopy etc., with all cross bracings using mild steel sheets of size 90em x] ‘60cm x 10 gauge stifened with welded mildstee! angles of size 25 x 25 x Gmrn for boarding lai] cover silver oak (country wood) joists of size 10em x 6.50 cum (spaced at about 90 cm c/o) and| _supported by casurina props of 10-13 em dia (spaced at 75 cm clo) complete For Deckslan | T Beam ‘Sub-Data-(1) cost of M.S sheets and angels for each set | I Weight of M.S sheet: 90cm x 60cm x 109 = 24.024 KgiSqm 3.175 x 7860/1000 | Weight of MS Angle of size 25 x 25 x amin | | | 153.60m x 1.11Kgin 400 | 1346 Kg Cost of MLS sheeis. (i. item No. 111), 4060 848.13 400 Kg Cost of Angleot size 26 x 26 x 3mm. 40.50 162.00 (Gi. tern No, 112) 17.48 Kg Add for cutting, bending & welding 6% 29.10 | Kg 508.09 (GI No. 168 R-2) | eee 2083, Sundries, i TOTAL, ‘Sub-Data- (2) |Cost of M.S angies and Angles and Silver oak! |country wood joists tem x 6.5em at about 90cm) centre to centre ate, { 10.00 | Sqm 49 | Nos. Cost of MS angies and Sheet [A] 121600 Each 2310309 j Totar 23 | | 23103,02| | Gost for single use © 2105.92 40 778 G2 | Cum [sik abun wos joe Yen x Bon at) 1404700 Cum 17018 | jabout 80 cm centre to centre etc. (SI. Item No. | j i) | 5 For fuse 1781.64'/5 366.33 |size of ribs 0.60m x 0.60m x 1.20m pot (Ges 36 x 100 x 68 140 j | 6120.0 (cross bracings 2x 19.30m x 1i.40m x68/40 | |) zeae |__eosttor single use | a 720004 MAIN DATA 1.00 | Use [cost GFWS Shoals and angles coat B78] 37780 1.00 | “UGe cost of siver oak joists and steel props | 70084 | 00.4 38° | Nos. Caipenter tat class. (Si. lem No. 11). 5.61050 | Each | 231980] BA” | Nes. |Mazdoor tat class. (SL. item No, 384) | Raa9050 Each | 210070 4.0 | Nos. iter dnd clas. (Sem No. 194) | Rest3.70 | Each) “51370 [Ade for weleing grils, hails ote: pois 8.00 | |Add for Oting for MS shast and edges jest F409 — |e | [Total | | [Roto Pert sqm la} Centering for Deck Siab | 4.00 | Sq.m (Centering rate (0% Extra for Vertical surface | ts lsunahies i Ea Total a] i | |Centering for T-beam Girders | 4.00 | Sam | Centering ato | | 120% Extra for Vertical surface Mis" lbundies | Total) 12776.00)/10 sqm 1277.80 sam seserr60 | sam Rseco Sain wey 1277.60) 0.09] 0.49} 1278.00} | Rs.t277.60 | Sqm 5.288.62 ) Sqm Ls | 1277 60| 285.52] ae 1534.00) 30f3

Вам также может понравиться