Вы находитесь на странице: 1из 19

BID SUMMARY

Store Name: TWO-STOREY COMMERCIAL BUILDING


Location: DRT Highway, Corner Pulilan Regional Road, Pulilan Bulacan

I. Civil Works
I.1 Preliminaries --------------------------------------------------------------------------
I.2 Demolition Works-----------------------------------------------------------------------------------
I.3 Structural Works
Earthworks
Concrete Works: Cast in Place Concrete
Rebars
Formworks
STEEL WORKS
Roof Framing
Floor Framing Plan
Roofing & Tinsmithry
I.4 Exterior Works
I.4.1 Masonry Works--------------------------------------------------------------------------
I.4.2 Ceiling Finishes------------------------------------------------------------------------
I.4.3 Wall Finishes -------------------------------------------------------------------------
I.4.4 Floor Finishes---------------------------------------------------------------------------
I.4.5 Waterproofing ---------------------------------------------------------------------------
I.4.8 Painting Works-----------------------------------------------------------------------
I.4.9 Metal Works ---------------------------------------------------------------------------
I.4.10 Site Development Works --------------------------------------------------------------------------------------------
II. Plumbing Works-------------------------------------------------------------------------------
III. Electrical Works----------------------------------------------------------------------
V. Others (Aluminum Composite Panel)
BID COST

NAME OF BIDDER:

PROJECT ENGINEER:
ADDRESS:

DATE :
TOTAL AMOUNT:
Note: excluded items:
1. Roll-up doors
2. Glass Panels\
3. Building Permit Fees
6. Doors for Toilets
RY

Floor Area: sqm


Lot Area: sqm

-------------------- ###
---------------------------------- 7 1,980.00

------------------------------ ###
----------------------------- ###
--------------------------- ###
------------------------------ ###
------------------------------ ###
--------------------------- ###
---------------------------- ###
------------------------------------------------------------------ ###
---------------------- ###
------------- ###

-
PROJECT NAME: PULILAN COMMERCIAL COMPLEX

LOCATION: DRT Highway, Corner Pulilan Regional Road, Pulilan Bulacan


CIVIL WORKS

CONTRACTOR :

MATERIAL COST

ITEM OF WORK QTY UOM TOTAL


UNIT
MATERIAL QTY UNIT
COST
COST

I.1 PRELIMINARIES * *
a. Mobilization 1.00 lot -
b. Demobilization 1.00 lot -
c. Insurance /Bonds -
c.1 Performance Bond lot -
c.2 Warranty/Guarantee Bond lot -
d. Temporary Facilities (Electricity and Water during construction) -
d.1 Electricity lot -
d.2 Water lot -
d.4 House rental / Barracks 1.00 lot -
e. Appplication for permanent power/water supply (legwork only)
e.1 Electricity 1.00 lot -
e.2 Water 1.00 lot -
e. Permits and Clearances:
e.1 Provincial - lot -
f. Board - up
f.1 wooden l.m -
f.2 others 50.00 l.m -
g. As-built plans lot -
h. Delivery/Trucking 0f Steel Beams 1.00 lot -
TOTAL
* *
I.2 DEMOLITION WORKS and HAULNIG * *

I.2.1 Breaking of exisitng concrete slab on fill 1.00 lot -


I.2.3 Hauling
Hauling and pull out of debris 1.00 lot -
TOTAL
I.3 STRUCTURAL WORKS * *
I.5.1 EARTHWORKS -
I.5.1.1 Excavation 25.00 sq.m.
Footing 184.01 cu.m. -
Footing Tie Beams 28.04 cu.m. -
I.5.1.2 Backfill (including compaction)
Backfiil of excavated soil
Footing 141.07 cu.m. -
Footing Tie Beams 16.84 cu.m. -

Earthfilling materials (building area only) 73.44 cu.m. -


I.5.1.3 Gravel Bed sq.m. -
Footing 116.83 -
Footing Tie Beams 44.50 -
Slab on fill 204.00 -
I.5.1.4 Soil Poisoning 204.00 sq.m. -
I.5.1.5 Site Clearing and Grubbing 204.00 sq.m. -
I.5.1.6 Compaction & Levelling 204.00 sq.m. -
TOTAL
I.5.2 CONCRETE WORKS & FORMWORKS:
Concrete Works: Cast in Place Concrete
1.5.2.1.1 Ground/Second Floor
b. Reinforced Concrete; 3000psi
b.1 Footing
Column Footing 42.94 cu.m. -
b.2 Beams
Footing Tie Beam 11.19 cu.m. -
b.3 Slab
Slab on fill 21.42 cu.m. -
Suspended slab 28.07 cu.m. -
Ledges 3.38 cu.m. -
b.5 Column
Ground (Pedestal) 6.05 cu.m. -
Columns 23.16 cu.m. -
b.7 Others
Lintel Beams and Stiffener Columns, Exterior / Interior, 3000psi 1.25 cu.m. -
TOTAL
Rebars
a. Footing
a.1 Column Footing
16mm Deformed bars (G-40) 2,863.73 kgs. -
b. Beams
b.1 Footing Tie Beams
10mm Deformed bars 582.75 kgs. -
16mm Deformed bars (G-40) 1,730.17 kgs. -
c. Slab
c.1 slab on fill
10mm Deformed bars 1,153.85 kgs. -
c.2 suspended slab
12mm Deformed bars 3,201.20 kgs. -
c.3 ledges
12mm Deformed bars 426.00 kgs. -
e. Concrete Pedestal
10mm Deformed bars (stirrups) 1,138.31 kgs. -
20mm Deformed bars (G-40) 1,864.80 kgs. -
f. Others
Lintel Beams ,10mm bars dropwall 178.00 kgs. -
g. metal decking
0.8mm thk metal decking 227.85 sqm -
TOTAL
Formworks
footing tie beam 89.00 sqm -
column pedestal 72.00 sqm -
to suspended slab 211.00 sqm -
to ledge slab 30.40 sqm -
TOTAL
I.5.3 STEEL WORKS
I.5.3.1 Roof Framing
a. Trusses
2" x 2" x 6mm angle bar 90.00 pcs -
1 1/2" x 1 1/2" x 6mm angle bar 130.00 pcs -
2" x 4" x 1.5mm C-purlins 105.00 pcs -
16mm diameter cross bracing 26.00 pcs -
16mm diameter turnbuckle 32.00 pcs -

Miscellaneous (welding rod, acytelene, oxygen etc.) 1.00 lot -


TOTAL
I.5.3.2 Floor Framing Plan
Columns
W12x53 27.00 pcs -
W12x35 14.00 pcs -
16mm base plate 30.00 pcs -

20mm dia x 600mm anchor bolt 180.00 pcs -


2nd floor beams
W16x45 21.00 pcs -
W14x26 11.00 pcs -
W10x22 2.00 pcs -
roof beams
W14x26 27.00 pcs -

Miscellaneous (welding rod, acytelene, oxygen etc.) 1.00 lot -


TOTAL
I.5.3.3 Roofing & Tinsmithry
Ga. 24 GI sheet 320.00 pcs -

Stainless steel inside gutter ga. 24 17.00 pcs -

10mm thk single sided insulation 7.00 rolls -


TOTAL
TOTAL STRUCTURAL WORKS
I.4 FINISHING WORKS * *
I.4.1 MASONRY ( Including mortar corefill & rebars)
I.4.1.1 100mm thk. CHB
Interior partitions 168.95 sq.m. -
Toilet partitons 34.49 sq.m. -
I.4.1.2 150mm thk. CHB
Perimeter walls 357.58 sq.m. -
I.4.1.3 Floor topping
Hallway 130.22 sq.m. -
I.4.1.4 Plastering
Interior plastering (plain cement) 659.45 sq.m. -
Exterior plastering (plain cement) 332.12 sq.m. -
Toilet walls (rough finish) 147.77 sq.m. -
TOTAL

I.4.2 CEILING WORKS

I.4.2.1 4.5mm thk. Hardiflex bd on metal furrings


Hallway ceiling (G/F) 34.00 sq.m -
Hallway ceiling (2/F) 47.36 sq.m -
Roof eaves ceiling (2/F) 112.01 sq.m -
Office ceiling 6.34 sq.m -
Toilets 10.97 sq.m -
TOTAL

I.4.3 WALL FINISHES

I.4.3.1 300mmx3000mm Mariwasa wall tiles


stall toilets 127.50 sq.m. -
office toilet 15.36 sq.m. -
TOTAL

I.4.4 FLOOR FINISHES


600mm x 600mm Granite tiles (installation only incl adhesive &
I.4.4.1 grout)
hallway G/F 68.38 sq..m -
hallway 2/F 65.63 sq..m -
stair tiles 14.36 sq..m -
stair nosing 24.00 l.m -

I.4.4.1 300mm x 300mm Ceramic tiles


stalls toilet 8.93 sq.m. -
office toilet 2.52 sq.m. -

I.4.4.3 Plain Cement Finish sq..m -


TOTAL

I.4.5 WATERPROOFING ( Including Surface Preparation)


1.4.5.2 Cold applied
Hallway 65.63 sq..m -
Toilets 2/F only 13.86 sq..m -
TOTAL

1.4.8 PAINTING WORKS ( INCLUDING SURFACE SURFACE PREPARATION)


I.3.8.1 Permacoat Semi Gloss Finish
Exterior walls 332.12 sq.m. -
Interior walls (hallways, office, stair area) 126.69 sq.m. -
Ceiling 210.68 sq.m. -
Ledge 45.75 sq.m. -
I.3.8.2 Automotive Paint Finish
Decorative tubular slats 150.08 sq.m. -
Balcony railing 53.60 sq.m. -
Slanted Columns 112.00 sq.m. -
TOTAL

1.4.9 METAL WORKS


1.4.9.1 Decorative Slats (slanted)

50mmx150mmx1.5mm steel tubular 210.00 l.m. -


1.4.9.2 Balcony Railing

50mmx150mmx1.5mm steel tubular (top rail) 20.00 l.m. -

50mmx50mmx1.5mm steel tubular (horizontal & vertical) 240.00 l.m. -


1.4.9.3 Stainless Stair Railing

Stainless railing 38mm dia with horizontal & vertical balluster 12.00 l.m. -
TOTAL

I.4.10 SITE DEVELOPMENT WORKS


a. Concrete Topping with wiremesh
Driveway/Parking 17.70 cu.m. -

f. Earthfilling materials (building area) 94.95 cu.m. -

g. Service Entrance Post and pedestal 1.00 lot -

h. Pavement markings and curb painting 1.00 lot -


TOTAL
TOTAL fFINISHING WORKS
XVI. OTHERS - CIVIL WORKS (Pls Specify)
a. Aluminum Composite Panels (red) sq.m - -
b. Aluminum Composite Panels (white) sq.m - -
mobilization (if provincial stores)
TOTAL

TOTAL CIVIL WORKS


ULILAN COMMERCIAL COMPLEX

ner Pulilan Regional Road, Pulilan Bulacan


IVIL WORKS

NTRACTOR :

LABOR COST
TOTAL 12% TOTAL
TOTAL MARK UP
UNIT UNIT COST VAT AMOUNT
LABOR
COST COST
COST

- - - - -
- - - - -
- - - - -
- - - - n/a
- - - - n/a
- - - - -
- - - - c/o owner
- - - - c/o owner
- - - - -
- - -
- - - - n/a
- - - - n/a

- - - - c/o owner
- - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -

- - - - -

- - - - -
- - - -

-
#REF!
- - - - -
- - - - -

- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - -

- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - -

- - - - - -

- - - - - -

- - - - - -
- - - -
- - - -

- - - - -
- - - - -

- - - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -

- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -

- - - - -
- - - -

- - - - -
- - - - -
- - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - -
- - - -
- - - - by owner
- - - - by owner

- - - -

- - - -
PROJECT NAME: PULILAN COMMERCIAL COMPLEX
LOCATION: DRT Highway, Corner Pulilan Regional Road, Pulilan Bulacan
PLUMBING
CONTRACTOR :

MATERIAL COST
ITEM OF WORK MARK UP 12% VAT TOTAL AMOUNT
QTY UNIT UNIT COST TOTAL MATERIAL
COST
A. PRELIMINARIES *
a. Mobilization 1.00 lot - - - -
b. Demobilization 1.00 lot - - - -
c. As-built plans 1.00 lot - - - -
TOTAL -

B. SANITARY DRAINAGE & VENTILATION SYSTEM


B.1 KITCHEN AREA / DINING / TOILET & WASH A
PVC Pipe Neltex Series 1000
150 mm x 3.0 m 6.00 pcs. - - - -
100 mm x 3.0 m 25.00 pcs. - - - -
75 mm x 3.0 m 16.00 pcs. - - - -
50 mm x 3.0 m 35.00 pcs. - - - -
PVC Wye
150mm x 100mm 17.00 pcs - - - -
100 mm x 100 mm 24.00 pcs - - - -
75 mm x 75 mm 24.00 pcs - - - -
PVC Tee
100mm x 100mm 6.00 pcs - - - -
100mm x 50mm 11.00 pcs - - - -
50 mm x 50 mm 20.00 pcs - - - -
PVC Reducer
150 mm x 100 mm 3.00 pcs - - - -
100 mm x 50mm 8.00 pcs - - - -
PVC Elbow 90 deg
100 mm 25.00 pcs - - - -
75 mm 22.00 pcs - - - -
50 mm 30.00 pcs - - - -
PVC Elbow 45 deg
100 mm 35.00 pcs - - - -
75 mm 22.00 pcs - - - -
50 mm 35.00 pcs - - - -
Brass Clean-out M-335-B
100 mm 16.00 pcs - - - -
PVC P-trap 50 mm 11.00 pcs - - - -
Brass Floor strainer without Funnel 4 x 4 x 2 10.00 pcs - - - -
Dome type strainer 3" (for ledges) 8.00 pcs - - - -
Pioneer epoxy cement 1.00 gal - - - -
Pipe assembly hanger
3/8" dia. Full Thread 5.00 pcs. - - - -
1" x 1/8" thk. Flat Bar 5.00 pcs. - - - -
anchor grip 30.00 pcs - - - -
PVC Solvent (400cc) 10.00 pcs. - - - -
Vulcaseal 2.00 cans - - - -
Catch basin & cover pcs - - - -
Labor Cost 1.00 lot - - - -
TOTAL DRAINAGE & VENTILATION SYSTEM -

C. WATER SUPPLY SYSTEM


C.1 KITCHEN AREA / TOILET & WASH AREA
Borplus Pipes
Bor Plus Pipes (PPR-3), 20x 3.4mm 6.00 pcs - - - -
Bor Plus Pipes (PPR-3), 25x 4.2mm 6.00 pcs - - - -
Bor Plus Pipes (PPR-3), 32x 5.4mm 18.00 pcs - - - -
Borplus Coupling
Coupler, 20mm 3.00 pcs - - - -
Coupler, 25mm 3.00 pcs - - - -
Coupler, 32mm 10.00 pcs - - - -
Borplus Elbow
Elbow 20 x 900 20.00 pcs - - - -
Elbow 25 x 900 11.00 pcs - - - -
Elbow 32 x 900 6.00 pcs - - - -
Borplus Tee
Tee Equal; 32mm 2.00 pcs - - - -
Tee Reducer; 25/20/40mm 11.00 pcs - - - -
Tee Reducer; 32/20/40mm 12.00 pcs - - - -
Borplus Adaptor
Adaptor FT; 32*1" 2.00 pcs - - - -
Adaptor FT; 20*1/2" 22.00 pcs - - - -
Borplus Elbow
Elbow FT; 25*3/4" 6.00 pcs - - - -
Borplus Reducer
Reducer 25*20 11.00 pcs - - - -
Ball Valves
PPR valves 32mm 2.00 pcs - - - -
PPR valves 25mm 11.00 pcs - - - -
Miscellaneous 1.00 lot - - - -
Labor Cost 1.00 lot - - - -
-
D. FIXTURES ( INCLUDING ACCESSORIES) (installation only - owner supplied item
D.1 TOILET
Water Closet 11.00 set - - - -
Wash Basin w/ Half Pedestal 11.00 set - - - -
Faucet 11.00 set - - - -
Hydraulic Pump 1.5HP by Goulds 1.00 set - - - -
Well Mate Bladder Tank W-25 1.00 set - - - -
TOTAL - - - -

E. EXTERIOR PLUMBING WORKS


E.2 Septic Tank 1.00 set - - - -
E.4 Catch Basin & Cover 13.00 sets - - - -
E.6 Storm Drain
PVC Pipe Neltex Series 1000
100 mm x 3.0 m 50.00 pcs. - - - -
75 mm x 3.0 m 15.00 pcs. - - - -
PVC Elbow 90 deg
100 mm 16.00 pcs - - - -
75 mm 31.00 pcs - - - -
PVC Elbow 45 deg
100 mm 10.00 pcs - - - -
75 mm 10.00 pcs - - - -
Labor Cost 1.00 lot - - - -
TOTAL -
TOTAL - - - -
PROJECT NAME: PULILAN COMMERCIAL COMPLEX
LOCATION: DRT Highway, Corner Pulilan Regional Road, Pulilan Bulacan
ELECTRICAL WORKS

CONTRACTOR :

ITEM OF WORK MATERIAL COST

TOTAL MATERIAL MARK UP 12% VAT TOTAL AMOUNT


QTY UNIT UNIT COST
COST

A. PRELIMINARIES
1) Mobilization/Demobilization 1.00 lot - - - -
2) Demobilization 1.00 lot - - - -

3)
As-built Plans/ Testing Reports, Insulation test and Load Balancing 1.00 lot - - - -
4) Testing Reports, Insulation test and Load Balancing 1.00 lot - - - -
TOTAL -
B. ROUGHING - IN
B.1 Stall / Halllway areas
1) P V C Pipe
15 mm dia. 50.00 pcs - - - -
20 mm dia. - pcs - - - -
25mm dia 160.00 pcs - - - -
32mm dia pcs - - - -
50mm dia. pcs - - - -
2) P V C Adapter
15 mm dia. 100.00 pcs - - - -
20 mm dia. pcs - - - -
25mm dia 80.00 pcs - - - -
32mm dia pcs - - - -
50mm dia. pcs - - - -
3) P V C Elbow
15 mm dia. pcs - - - -
20 mm dia. pcs - - - -
25 mm dia 40.00 pcs - - - -
32 mm dia pcs - - - -
50 mm dia pcs - - - -
7) OTHERS
Utility Box 10.00 pcs - - - -
Junction Box 50.00 pcs - - - -
Square Box 11.00 pcs - - - -
Pull Box 12x12x12 11.00 pcs - - - -
Wire Gutters 12x12x36 kls - - - -
# 16 G.I. Wire pcs - - - -
ST Connector ½ 20.00 mts - - - -
Bx Flexible Conduit ½ 20.00 mts - - - -
5) Mica Tube ⅜ 60.00 lot - - - -
6) Hardwares & Consumables 1.00 lot - - - -
7) Labor Cost 1.00 lot - - - -
TOTAL -

C. WIRES & CABLES


Stall / Halllway areas
1) STRANDED COPPER WIRE
2.0 mm2 THHN/THWN 300.00 mtrs - - - -
3.5 mm2 THHN/THWN 1,100.00 mtrs - - - -
14.0 mm2 THHN/THWN 1,100.00 mtrs - - - -
3) LABOR COST 1.00 lot - - - -
TOTAL -

D. WIRING DEVICES
Stall / Halllway areas
1) SWITCH
1-Gang ; National 2.00 sets - - - -
2-Gang ; National 6.00 sets - - - -
3-Gang ; National 2.00 sets - - - -
2) RECEPTACLES / NATIONAL - -
Duplex Grounding Type 4.00 pcs - - - -
Telephone Outlet (2-Gang) 1.00 pcs - - - -
4) LABOR COST 1.00 lot - - - -
TOTAL -

E. INSTALLATION OF OWNER SUPPLIED ITEMS

1) LIGHTING FIXTURES 1.00 lot - - - -


2) C. B. 50Amp 2P 230V w/ 4 Breakers (3-20Amp 2P, 1-30A 2P) 10.00 set - - - -
3) C. B. 50Amp 2P 230V w/ 6 Breakers (5-20Amp 2P, 1-30A 2P) 1.00 set - - - -
4) Cut Off Breaker 225A 2P w/ Nema 3R 1.00 set - - - -
TOTAL -
H OTHERS (Pls specify)

1) NORMAL FEEDERLINE @ 18lm (2-225mm² THHN + 1-30mm² THHN IN 65mmØ RSC PIPE) - - - -
RSC Pipe 65mmØ 5.00 pcs - - - -
RSC Elbow 65mmØ 3.00 pcs - - - -
RSC Coupling 65mmØ 8.00 pcs - - - -
Locknut & Bushing 65mmØ 6.00 pcs - - - -
Entrance Cap 65mmØ 1.00 pcs - - - -
Ground Rod ⅝ x 10 1.00 pcs - - - -
Racks 3 Spole 1.00 pcs - - - -
Wire #125mm² THNN P.D. 36.00 mtr - - - -
Wire #30m² THNN P.D. 18.00 mtr - - - -
Hardware & Consumables 1.00 lot - - - -
-
2) OTHERS (For Meter Center)
Breaker Gutter 11-50A 2P w/ Nema 3R (150 x 400 x 1800) 1.00 lot - - - -
Busbar Gutter w/ Lugs II-Pair for wire 14mm² w/ Grounding Busbar 1.00 lot - - - -
-
TOTAL -
TOTAL - - - -