Академический Документы
Профессиональный Документы
Культура Документы
Short descriptive Questions of the unit, (Total 5 questions with 5 marks each)
1. Write a short description of Pump overhauling sequence (steps) with most common errors.
2. Write steps during alignment check of an equipment in field with specific safety measures.
3. Write the summary of dynamic balancing procedure. (sequence of steps)
4. Write the sequence of operations in PSV calibration with specific safety measures.
5. Describe the sequence of WPS preparation for any unknown metal (including all interfaces).
Short Questions related to Unit Management Manual, Standing Instructions / Orders, Defeat
protocols, SCD, Past Incidents of the unit (Total 5 questions with 2 marks each)
1. What incident can you recall during your stay at the unit? Describe any lesson leant?
2. What is the Pneumatic pressure limitation for air storage tank used for PSV calibration?
3. What is the minimum and maximum capacity of balancing on our machine in Workshop (in
terms of Weight)?
4. Describe the safety measures implemented during hydro-testing of equipments in Workshop.
5. Describe all the PPE’s required for grinding operations.
Practical understanding of PSM, Safety Procedures, Company Policies, (Total 5 questions with 2
marks each)