SUPER STRUCTURE
1 STIFFNER COLUMNS M3 4.00 1,100.00 4,400.00
2 RCC COLUMNS M3 23.00 1,050.00 24,150.00
4 STIFFNER BEAMS M3 4.00 1,100.00 4,400.00
5 LINTEL BEAMS M3 2.00 1,050.00 2,100.00
6 R.C.C FOR STAIR, SLAB AND BEAM M3 135.00 1,200.00 162,000.00
7 R.C.C FOR PARAPET M3 19.00 1,100.00 20,900.00
BLOCK WORK
1 THERMAL BLOCK WORK - 200 mm thk. M2 285.00 125.00 35,625.00
2 INTERNAL BLOCK WORK- 200 mm thk. M2 129.00 105.00 13,545.00
3 INTERNAL BLOCK WORK- 100 mm thk. M2 278.00 100.00 27,800.00
PLASTERING
1 EXTERNAL PLASTERING M2 242.00 44.00 10,648.00
2 INTERNAL PLASTERING M2 1,178.00 39.00 45,942.00
PAINTING
1 EMULSION PAINTING M2 796.00 45.00 35,820.00
2 EPOXY PAINTING M2 242.00 47.00 11,374.00
SUBSTRUCTURE
1 EXCAVATION M3 192.00 16.00 3,072.00
2 ROAD BASE FILLING M3 28.00 98.00 2,744.00
3 P.C.C.UNDER FOOTINGS & TIE BEAM M3 5.00 580.00 2,900.00
4 R. C. CONCRETE IN FOOTING M3 7.00 990.00 6,930.00
5 R. C. CONCRETE IN PEDESTAL M3 1.00 995.00 995.00
6 R.C.C CONCRETE IN WALL FOOTING M3 3.00 930.00 2,790.00
7 R. C. CONCRETE IN TIEBEAM M3 4.00 980.00 3,920.00
8 SOLID BLOCK WORK M2 49.00 90.00 4,410.00
9 BITUMEN PAINTING M2 185.00 5.00 925.00
10 BACK FILLING M3 128.00 18.00 2,304.00
11 DISPOSAL M3 64.00 20.00 1,280.00
12 P.C.C BELOW WALL FOOTING M3 2.00 580.00 1,160.00
13 ROAD BASE BELOW FLOOR SLAB M3 18.00 98.00 1,764.00
14 FLOOR SLAB M3 8.00 740.00 5,920.00
15 POLYTHENE SHEET M2 295.00 5.00 1,475.00
16 ANTI TERMITE TREATMENT M2 272.00 5.00 1,360.00
17 POLY FOAM INSULATION M2 82.00 25.00 2,050.00
SUPERSTRUCTUR
1 RCC LINTEL M3 2.00 1,100.00 2,200.00
2 RCC COLUMNS M3 3.00 1,050.00 3,150.00
3 RCC BEAM M3 7.00 1,200.00 8,400.00
4 RCC ROOF SLAB M3 16.00 1,200.00 19,200.00
5 RCC PARAPET M3 2.00 1,100.00 2,200.00
6 RCC STIFFNER COLUMN M3 1.00 1,100.00 1,100.00
7 RCC STIFFNER BEAM M3 2.00 1,100.00 2,200.00
8 50MM THK INSULATION RM 39.00 70.00 2,730.00
BLOCK WORK
1 THERMAL BLOCK WORK M2 116.00 125.00 14,500.00
2 INTERNAL BLOCK WORK M2 99.00 105.00 10,395.00
PLASTERING
1 EXTERNAL PLASTERING M2 219.00 40.00 8,760.00
2 INTERNAL PLASTERING M2 394.00 40.00 15,760.00
PAINTING
1 EXTERNAL PAINTING M2 219.00 49.00 10,731.00
2 INTERNAL PAINTING M2 299.00 47.00 14,053.00
SUPER STRUCTURE -
1 STIFFNER COLUMNS M3 10.50 1100.00 11,550.00
2 RCC COLUMNS M3 7.26 1100.00 7,981.05
3 R.C.C IN COPING BEAMS M3 5.78 1150.00 6,641.25
4 STIFFNER BEAMS M3 5.48 1100.00 6,029.10
5 LINTEL BEAMS M3 0.89 1100.00 981.75
6 R.C.C FOR STAIR, SLAB AND BEAM M3 10.49 1200.00 12,587.40
-
BLOCK WORK -
1 THERMAL BLOCK WORK - 200 mm thk. M2 346.00 125.00 43,250.00
2 INTERNAL BLOCK WORK M2 143.00 105.00 15,015.00
PLASTERING
1 EXTERNAL PLASTERING M2 393.00 44.00 17,292.00
2 INTERNAL PLASTERING M2 633.00 39.00 24,687.00
PAINTING
1 EMULSION PAINTING M2 633.00 45.00 28,485.00
2 EPOXY PAINTING M2 393.00 47.00 18,471.00
SUPERSTRUCTURE
1 RCC COLUMNS M3 12.00 1,050.00 12,600.00
2 STIFFNER BEAMS M3 4.00 1,100.00 4,400.00
3 COPING BEAM M3 7.00 1,150.00 8,050.00
4 LINTEL M3 2.00 1,050.00 2,100.00
5 PUMP ROOM GRADE BEAMS M3 6.00 1,100.00 6,600.00
6 AC PLATFORM LS 1.00 55,000.00 55,000.00
BLOCK WORK
1 THERMAL BLOCK WORK M2 678.00 130.00 88,140.00
-
PLASTERING -
1 EXTERNAL PLASTERING M2 896.00 44.00 39,424.00
2 INTERNAL PLASTERING M2 677.00 39.00 26,403.00
PAINTING
1 EXTERNAL PAINTING M2 897.00 47.00 42,159.00
2 INTERNAL PAINTING M2 678.00 45.00 30,510.00
Discount 167,076.00
SUBSTRUCTURE:
1 EXCAVATION M3 275.00 16.00 4,400.00
2 ROAD BASE FILLING M3 36.00 98.00 3,528.00
3 P.C.C.UNDER FOOTINGS & TIE BEAM M3 7.00 580.00 4,060.00
4 R. C. CONCRETE IN FOOTING M3 11.00 990.00 10,890.00
5 R. C. CONCRETE IN PEDESTAL M3 1.00 995.00 995.00
6 R.C.C CONCRETE IN STRAP BEAM M3 4.00 990.00 3,960.00
7 R.C.C CONCRETE IN WALL FOOTING M3 4.00 950.00 3,800.00
8 R. C. CONCRETE IN TIE BEAM M3 3.00 980.00 2,940.00
9 SOLID BLOCK WORK M2 42.00 90.00 3,780.00
10 BITUMEN PAINTING M2 199.00 5.00 995.00
11 BACK FILLING M3 212.00 18.00 3,816.00
12 DISPOSAL M3 73.00 20.00 1,460.00
13 P.C.C BELOW WALL FOOTING M3 2.00 580.00 1,160.00
14 ROAD BASE BELOW FLOOR SLAB M3 28.00 98.00 2,744.00
15 FLOOR SLAB M3 13.00 750.00 9,750.00
16 POLYTHENE SHHET M2 248.00 5.00 1,240.00
17 A.T.T M2 315.00 5.00 1,575.00
18 FLOOR-POLY FOAM INSULATION M2 115.00 30.00 3,450.00
-
SUPERSTRUCTURE: -
1 RCC COLUMNS M3 3.00 1,050.00 3,150.00
2 LINTEL BEAMS M3 2.00 1,050.00 2,100.00
3 RCC BEAM M3 8.00 1,200.00 9,600.00
4 RCC ROOF SLAB M3 23.00 1,200.00 27,600.00
5 RCC PARAPET M3 4.00 1,100.00 4,400.00
BLOCK WORK
1 THERMAL BLOCK WORK M2 113.00 125.00 14,125.00
2 INTERNAL BLOCK WORK M2 112.00 105.00 11,760.00
- -
PLASTERING - -
1 EXTERNAL PLASTERING M2 263.00 44.00 11,572.00
2 INTERNAL PLASTERING M2 329.00 39.00 12,831.00
PAINTING
1 EXTERNAL PAINTING M2 263.00 47.00 12,361.00
2 INTERNAL PAINTING M2 269.00 45.00 12,105.00
CIVIL WORKS -
CONSTRUCTION OF BOUNDARY WALL AND PLAIN COMPOUND
1 RM 556.00 795.00 442,020.00
WALL COMPLETE IN ALL RESPECT
SUPPLY AND INSTALLATION OF GATES AND AUTOMATIC
2 60,000.00
BARRIERS LS 1.00 60,000.00
3 INTERLOCK WORKS M2 8,500.00 80.00 680,000.00
4 KERB STONE RM 1,350.00 60.00 81,000.00
RCC CONCRETE PAVED AREA, HUMPS, RAMPS INCLUDING HDPE
5 10,000.00
MEMBRANE LS 1.00 10,000.00
6 ROAD BASE COMPACTED AREA M3 1,560.00 95.00 148,200.00
7 AREA LIGHT POLE RC FOUNDATION LS 1.00 60,000.00 60,000.00
8 RAIN WATER DISPERSAL SYSTEM LS 1.00 14,000.00 14,000.00
9 DOMESTIC WATER TANK INCLUDING PUMP SHELTER LS 1.00 24,000.00 24,000.00
10 DOMESTIC HOLDING TANK(26500GL) LS 1.00 96,000.00 96,000.00
11 INDUSTRIAL HOLDING TANK LS 1.00 140,000.00 140,000.00
12 COVERED CAR PARKING NOS. 14.00 4,000.00 56,000.00
13 DIRECTION SIGNS,SPEED BUMPS,CRASH BARRIERS LS 1.00 40,000.00 40,000.00
14 WEIGHTBRIDGE CIVIL WORKS LS 1.00 100,000.00 100,000.00
15 SWEET SOIL FOR LANDSCAPING M2 740.00 25.00 18,500.00