9/2/2018 Aconex

Marilyn Fernandez Cardenas Mobility Pavilion-Main Contract - ST - EWS 103/EWS 1… 11/04/2018 Closed-Out
PERMASTEELISA GARTNER MIDDLE EAST LLC REQUEST FOR INFORMATION PGME-RFI-000006

ALEC Gate Keeper Mobility for EXPO 2020 Fwd: Mobility Pavilion-Main Contract - ST - EWS 103/… 29/04/2018 Closed-Out
ALEC ENGINEERING & CONTRACTING L.L.C RESPONSE TO RFI ALE-RTRFI-000007

Marilyn Fernandez Cardenas Mobility Pavilion-Main Contract - EWS 103/EWS 102 L… 30/07/2018 Responded
PERMASTEELISA GARTNER MIDDLE EAST LLC REQUEST FOR INFORMATION PGME-RFI-000061

ALEC Gate Keeper Mobility for EXPO 2020 Fwd: Mobility Pavilion-Main Contract - EWS 103/EWS… YESTERDAY
ALEC ENGINEERING & CONTRACTING L.L.C RESPONSE TO RFI ALE-RTRFI-000307

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to RFI ALE-RTRFI-000307 PGME-RFI-000006

Fwd: Mobility Pavilion-Main Contract - EWS 103/EWS 102 Level 4 Primary Steel
Movement

From ALEC Gate Keeper Mobility for EXPO 2020 - ALEC Engineering & Contracting L.L.C

To (2) Mr Luca Vignolo - Permasteelisa Gartner Middle East LLC

Marilyn Fernandez Cardenas - Permasteelisa Gartner Middle East LLC

Cc (3) Mr Arun Anandraj - Tiger Steel Engineering LLC

Shankar Rao - Tiger Steel Engineering LLC

Mr lakmal Attapatu - Tiger Steel Engineering LLC

Sent Saturday, 1 September 2018 8:03:03 AM GST (GMT +04:00)

Status N/A

DETAILS

Discipline FC - Facade

Contract No D0002 - Sustainability and Mobility Pavilions Developer

Originator Reference No MP-ALE-RFI-0199

Priority Regular - Respond by 7 Days

Information Requested Refer to the below information.

Response Provided Refer to the below information.

FILE ATTACHMENTS (1)

https://mea.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1758948357&USERID=537336905 1/3
9/2/2018 Aconex

File Name

Mobility Pavilion Main Contract EWS 103EWS 102 Level 4 Primary Steel Mo....xlsx

ATTRIBUTES

Attribute 1 C16 - Mobility Pavilion / 4103 - Thematic Pavilion - Mobility

MESSAGE

FYI and record

From: T Gatekeeper
Sent: 30/08/2018 4:48:13 PM GST (GMT +04:00)
To: ALEC Gate Keeper Mobility for EXPO 2020
Cc: Mohamed Aatif Valay, Mohamed Adel Amin, Raees Ahmad, Janarthanan Alagarsamy, Vivek Bandi Haridas, Shoni CS, Shijo George, Douglas
Hemajith, Christopher Jindu, Maxcell Joseph, Anthony Kirkham, Jithin Korambayil, Makesh Krishnamoorthy, Ashish Mukesh Manani, ALEC Gate
Keeper Mobility for EXPO 2020, Noor Mohamed, Gul Kaja Mohideen, Henk Mol, Johann Mostert, Saravana Murugan, Waseem Mushtaq, James P.D.,
Shiju Plavila, Abdul Rahman, Roshan Rai, Tumuluri Rama Rao, Abdul Rahman Shafsheen Shereef, Sumesh Subrahmanyan, Harikrishnan
Unnikrishnan, John Xavier, EMAAR_EXPO Gatekeeper, Martin Jakobson, Paola Tardini, Caitlin Connelly, F+P Gatekeeper, Austin Relton, Ronald
Schuurmans, Miguel Silva Romera, Omnium Gatekeeper, Feroz Abdulla, Mohammed Al Qassem, Ammar Dannan, Wajdi Kamel, Maan Majeed,
Ahmed Nabih Ibrahim, Shehab Taha, Astrid Wurdig, james maher, Shine Nair
Mail Number: TIME-RTRFI-000962
Subject: Fwd: Mobility Pavilion-Main Contract - EWS 103/EWS 102 Level 4 Primary Steel Movement

Discipline: FC - Facade
Contract No: D0002 - Sustainability and Mobility Pavilions Developer
Originator
MP-ALE-RFI-0199
Reference No:
Priority: Regular - Respond by 7 Days
Information
Refer to the below information.
Requested:
Response
Refer to the below information.
Provided:

https://mea.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1758948357&USERID=537336905 2/3
9/2/2018 Aconex

REQUEST FOR INFORMATION (RFI)

QUESTION BY CONTRACTOR

From F+P movement and tolerances report, the (post-installation of façade) deflection should not
exceed:

Whereas, the current response exceed the limits.


To clarify please provide in-plane vertical deflection of “Point X” by filling out the table below:
-Refer to attached PGME-RFI-0061 for full illustration

A 3D model of the location showing Permasteelisa brackets is provided for more clarity.
The requested loads from Permateelisa are provided in the attached sketch 01.

Attachments:
SKETCH 01(pdf)
Steel to COREWALL @ L4-1(dwf)

Signature / Raees Ahmad Date: 31-Jul-178

Name:

SUPV. CONSULTANT’S ANSWER

Please refer to attached schedule for requested deflections

Signature / Date :
Name:

THIS RFI RESPONSE SHALL NOT CONSTITUTE A TIME OR COST IMPACT TO THE CONTRACT UNLESS
ACCOMPANIED BY A SIGNED INSTRUCTION.

This mail has been approved for release by R Ahmad on 2018-08-01 10:37:04 GST

https://mea.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1758948357&USERID=537336905 3/3