Finish to schedule

R . C. Beam to S . E 's

details
75mm*20mm hardwood
architrave

45mm timber door to


schedule

Finish to Schedule Finish to Schedule

122mm*45 mm
hardwood frame 75 mm * 20 mm hardwood

architrave
75 mm * 20 mm
Softwood Packing hardwood

architrave

Softwood Packing

75mm*20mm hardwood
architrave 45 mm timber door
122 mm * 45 mm Mvule to schedule
hardwood frame

See wall on plan

Finish to Schedule

TIMBER DOOR HEAD DETAIL


TIMBER DOOR JAMB DETAIL
scale 1:2
scale 1:2

10mm bar welded onto


frame to hold glass Rugged end steel tail piece anchor Rugged end steel tail
cast in-situ piece anchor cast in- situ

8mm thick glass panel

200mm*50mm stainless
steel pull handle on both
sides

50mm*35mm heavy
duty R.H. Steel frame
painted to approval

500mm thick Finish to schedule


masonry walling

R . C. Beam to S.E' s details

50mm*35mm heavy duty


R.H. Steel frame painted
to approval
10mm*10mm lock
keeper

35mm*25mm R.H. Steel frame


5 mm*10mm R.H. Steel frame

Cylinder dead lock master


keyed to schedule 8mm thick glass

4 no. heavy duty hinges


Finish to schedule screwed to frame

STEEL DOOR JAMB DETAIL


scale 1:2 STEEL DOOR HEAD DETAIL
scale 1:2

GENERAL NOTES. FINISHES. C. CEILING. REVISIONS LEGEND PROJECT TITLE :


1. All dimensions to be checked on site before commencement of any work. Use figured A. FLOOR FINISHES. 1. Unpainted water proofed rough cast lime plaster finish.
2. 150mmx400mm anti-termite boriti poles on lime fill soffit alternating with plastered ceiling FLOOR SKIRTING MAMBRUI TOURISM AND INFORMATION CENTRE
1. 200mm thick coral aggregate slab to SE's details treated withhardener/sealer laid to falls DATE NO DESCRIPTION
dimensions only. Any discrepancies should be reported to the Architect. FINISH FINISH DRAWING TITLE :
2. All dimensions are in millimetres unless otherwise specified.. with a ribbed finish. strip at 300mm spacing.
2. Lime screed. 3. 9mm first coat 1:4 lime/sand screed and3mm second coat of lime plaster, smooth trowelled on
3. P.V. denotes permanent vent.
3. 300*300*10mm non slip ceramic tiles. structural slab. F S
4. Metal gutters & down pipe to suite. DRAWING NUMBER:
4. 6mm thick polished grey terrazzo laid on lime mortar screed, 50% chops, with 25mmx3mm 4. 18mm thick plywood toungue and groove board glued to 10mm felt layer to dampen noise.
5. All windows & doors to schedule.
dividing strips set off to architect's approval. 5. 450mmx450mm suspended gypsum board acoustic ceiling panels. W C
6. All internal fittings to approval. L (--) 02
Total floor slab thickness= 200mm. 6. 25mm thick suspended gypsum ceiling board and plaster on concrete soffit.
5. Approved 200x65x20mm Iroko timber parquet flooring in approved pattern laid with 7. Fully vitrified black chlorinated rubber paint WALL CEILING DRAWING SCALE:
CIVIL WORKS. FINISH
1.All slabs at ground level to be poured over 1000 gauge polythene sheeting on 50mm stone adhesive on20mm 1:4 lime screed. FINISH 1:100
blinding on hardcore. 6.200*65*20mm mvule wood blocks in approved pattern laid with adhesive 20mm lime mortar. D. SKIRTING.
2.All soils under slab to be treated for termite control. 7. 400x400mm fully vitrified ceramic tiles. 1. 300mmx100mmx10mm thick grey ceramic tiles. JOB NUMBER: Project 06/2016
3.All soils on cut embarkments to be stabilised.The slope should not exceed natural angle of 2. 10mm cement mortar on25mm thick mortar screed. PROJECT NATURE: WORKING DRAWINGS
repose. B. WALLING. 3. 150mm high in-situ terrazzo.
1. Coral rag or coral blocks 4. 150mm*20mm mvule wood on plugged sand coated with polyurethane clear linseed
STRUCTURAL WORKS. . 2. 300mmx300mmx20mm thick glazed ceramic tiles 1200mm high with 100mm straight lacquer finish. DOOR ANNOTATION WINDOW ANNOTATION DRAWN BY : KATHURIMA JEANINE NAITORE
1.Depth of foundation to be determined on site to SE's approval
. . continuos joints in both directions fixed with adhesive on rendered background with grouting to
2.For all R.C. works refer to Structural Engineer's details. 5. 100mm x25mm precast concrete tiles. REF NO:B02/53985/2012
approval. TYPE NUMBER TYPE NUMBER
3.All adjacent RC. .work and masonry walls to be tied with strap iron at every course. 3. Coral lime plaster finish containing 2-3 coats of egg white. CHECKED BY:
4. 12mm thick lime wash coat on lime plaster, treated with water proofing admixture. Coats ( D- 03 / 03 ) ( W - 01 / 37 )
MECHANICAL. DATE : March 2016
1.All plumbing and drainage to comply with Mambrui city council specifications.
. applied to manufacturers' specifications.
2.All service ducts ducts to be accesible from all floors. 5. Moulded mvule timber wall panelling upto 1200mm above finished floor level exposed
3.All underground foul and waste drain pipes to be class 41 golden brown pvc pipe. random cut coral stone to picture rail emulsion paint to cornice.
4.Minimum slope in the drain to be1%.
GSPublisherEngine 0.0.100.100