Вы находитесь на странице: 1из 1

1 sheet of 16

BUILDING AND CONSTRUCTION AUTHORITY


APPROVED UNDER SECTION 5 / SECTION 5A OF THE

BUILDING CONTROL ACT (CHAPTER 29)


3. REINFORCEMENT STEEL 4. STRUCTURAL STEEL WORK
1. GENERAL Project Ref No :E4357-00002-2015-ST01
3.1 ALL STEEL FOR THE REINFORCEMENT OF CONCRETE SHALL CONFORM TO SS EN 10080

1.1 UNLESS OTHERWISE SPECIFIED, THESE GENERAL NOTES WILL BE APPLIED IN CONJUNCTION WITH BS EN 10080, SPECIFIED CHARACTERISTIC YIELD STRENGTH 4.1 GENERAL
TO ALL RELEVANT DRAWINGS. WHEN FOUND DIFFERENT FROM THIS GENERAL OF REINFORCEMENT BAR SHALL BE :
NOTES, NOTES IN DETAILED DRAWING WILL TAKE PRECEDENCE. CONTRACTOR SHALL SUBMIT MILL CERTIFICATES STATING THE COMPOSITION,
2
HIGH TENSILE DEFORMED BAR TYPE B (H) 500 N/mm TESTS RESULTS AND COMPLIANCE TO ESTABLISHED STANDARDS FOR ALL
1.2 ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE
2 MATERIALS AND PRODUCTS TO BE USED FOR THE STRUCTURAL STEEL WORKS.
CONTRACT SPECIFICATIONS. WELDED STEEL FABRIC (WSFR) 485 N/mm
CONTRACTOR SHALL CHECK ALL THE DIMENSIONS, SLOPES, ANGLES AND

2
for Commissioner of Building Control
1.3 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND DETAILS ON

66
OTHER DETAILS IN STRUCTURAL DRAWING AND RESOLVE ALL DISCREPANCIES
SITE AND CHECK AGAINST ARCHITECTURAL AND E&M DRAWINGS AND RESOLVE 3.2 UNLESS OTHERWISE STATED ANCHORAGE LENGTH AND LAP LENGTH FOR REINFORCEMENTS SHALL BE:
IF ANY WITH THE ENGINEER BEFORE FABRICATION OF STEEL FRAMEWORK.

24
ALL DISCREPANCIES IF ANY WITH THE ENGINEER BEFORE COMMENCEMENT
OF WORK.

15
CLASS OF CONCRETE C 25/30 C 28/35 C 32/40 and over
4.2 ERECTION

20
1.4 THE CONTRACTOR SHALL INCORPORATE ALL STEEL, MECHANICAL,
REINFORCEMENT TYPE 500 FABRIC 500 FABRIC 500 FABRIC
SANITARY AND ELECTRICAL WORKS TO BE EMBEDDED IN THE CONCRETE OR
CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY AND SAFETY OF
OPENINGS FOR PIPE OR DUCT WORK BEFORE CONCRETING.
STEEL FRAMEWORK DURING ERECTION. HE SHALL SUBMIT A PROPOSAL
COMPRESSION ANCHORAGE LENGTH (Ldc)
FOR APPROVAL PRIOR TO ERECTION.

TENSION ANCHORAGE LENGTH (Lst)


2. CONCRETE WORK
4.3 MATERIAL
2.1 ALL CONCRETE MATERIAL SHALL CONFORM TO BS EN206 & GRADE OF CONCRETE LAP LENGTH SHOULD BE COMPUTED BY MULTIPLYING THE ANCHORAGE LENGTH WITH THE COEFFICIENT BELOW:
STANDARD CERTIFICATION BY THE QUALIFIED PERSON FOR STRUCTURAL WORKS
ALL STEEL SECTION AND PLATE SHALL CONFORM TO BS EN 10210, 10025 & 10219
U.O.S THE SPECIFIED CHARACTERISTIC STRENGTH OF CONCRETE AT 28th DAY GRADE S275 OR EQUIVALENT. IT SHALL BE SOUND AND FREE FROM
PERCENTAGE OF LAPPED BARS RELATIVE TO 1. In accordance with Regulation 9 of The Building Control Regulations, I,
SHALL BE : < 25% 33% 50% > 50% CRACKS, SURFACE PITTING, LAMINATION AND OTHER DEFECTS. ROBERT A TJANDRA
, the Qualified Person for structural works appointed under
TOTAL CROSS SECTIONAL AREA OF BARS STAINLESS STEEL SECTION AND PLATE SHALL CONFORM TO section 8(1)(a) or 11(1)(d)(i) of the Building Control Act, hereby submit the detailed
structural plans and design calculations prepared by me and certify that they have been
AISI GRADE 304L OR EQUIVALENT. prepared in accordance with the provisions of the Building Control Regulations, the
1 1.15 1.4 1.5 Building Control Act and any other written law pertaining to buildings and construction
for the time being in force.
PRECAST RC BEAMS C 40/50 N/mm2
2. I further certify that these detailed structural plans and design calculations are
in reference to Project Ref. No.: E4357-00002-2015-ST01
CAST-IN-SITU R.C. SUPERSTRUCTURES : C 32/40 N/mm2 THE SPECIFIED LAP LENGTH ARE TYPICAL AND SHALL BE PROVIDED FOR ALL BARS, INCLUDING VERTICAL COLUMN 4.4 WELDING 16
3. Total number of structural plans submitted: and
AND WALLS. NO SPILCE AND LAP SHALL BE MADE AT POINT OF MAXIMUM STRESS, E.G IN BEAMS AND SLABS, Vol. 1=231 pages
Total number of pages of design calculations in this book:
1ST STOREY SLAB ON GRADE C 32/40 N/mm2
WELDING PROCEDURES SHALL CONFORM TO BS EN 1011. ELECTRODES Vol. 2=7 pages
TOP BARS NEITHER BE SPLICED OVER SUPPORTS NOR BOTTOM BARS AT MID-SPANS. SPILCES AND LAP SHALL BE
IN METAL ARC WELDING SHALL CONFORM TO BS EN 2560. IONAL EN
PILECAP / FOOTING C 32/40 N/mm2 STAGGERED WHEREVER POSSIBLE. LAP LENGTH FOR UNEQUAL SIZE BARS (OR WIRE IN FABRIC) MAY BE BASE UPON SS G
E

I
N
O

EE
PR
THE SMALLER BAR. CRANKING OF BARS SHALL NOT EXCEED A SLOPE OF 1:10.
CONCRETE KERB, MASS CONCRETE C 16/20 N/mm2

R
CIVIL
4.5 ANCHOR BOLT (CAST IN)
ROAD KERB / HAUNCHING C 16/20 N/mm2 ROBERT A TJANDRA
BENDS AND HOOKS (FOR LINKS) ANCHOR BOLT SHALL CONFORM TO BS EN ISO 3506 GRADE A4-80

COLUMN / LIFT WALL C 32/40 N/mm2 4357


Bar ( ) r (mm)
SI
LEAN CONCRETE C 12/15 N/mm2 > 0
10 30
4.6 BOLT AND NUTS NGAPORE
OCT 2015

> 0
13 40 Qualified Person for Structural Works Date
RETAINING WALL C 32/40 N/mm2

r
BOLTS AND NUTS SHALL COMPLY TO ISO 898 PT1 & 2 CLASS 4.6.

0
0
Signature and Stamp
16 50
TRANSITION SLAB DRIFT SHALL NOT BE USED IN HOLES WHICH ARE BADLY OUT OF ALIGNMENT.
C 28/35 N/mm2
20 80 BOLTS SHALL BE TESTED FOR SPECIFIED TIGHTENING TORQUE.
BENDS HOOKS
BOX CULVERT C 32/40 N/mm2
HIGH STRENGTH FRICTION GRIP BOLT SHALL BE ACCORDANCE WITH BS EN 14399
BOX DRAIN/ U-DRAIN :
FOR EXPOSED STRUCTURAL MEMBERS, HOT DIP GALVANISED BOLTS, NUTS & WASHERS
INSIDE THE DEPOT BENDS AND HOOKS (FOR OTHERS)
C 28/35 N/mm2 SHOULD BE PROVIDED.
Bar ( ) r(mm) H(mm) U(mm)
40
OUTSIDE THE DEPOT C 25/30 N/mm2
10 30 180 85
UNLESS OTHERWISE PERMITTED BY THE ENGINEER, ALL BOLTS, NUTS AND
BENCHING C 16/20 N/mm2
13 36 185 110 WASHERS SHALL BE HOT DIP GALVANISED IN ACCORDANCE WITH BS EN 1461

U
SUMP C 25/30 N/mm2 r

r
16 48 195 135 OR SHERARDIZED IN ACCORDANCE WITH BS 7371, PART 8 AND SHALL BE FURTHER
245 180
PREPARED AND COATED TO THE SAME STANDARD AS THE ADJACENT SURFACES.
2.2 CONCRETE COVER (TO NEAREST REINF'T, INCLUDING LINKS OR STRANDS) 20 70
Bends Hooks
25 100 310 260
NOMINAL COVER WITH ALLOWANCE OF + 5mm SHALL BE :
THE CONTRACTOR SHALL PROVIDE TEST CERTIFICATES FOR ALL STRUCTURAL FASTENERS Contractor :
32 128 380 330
PILECAP / FOOTING : 50 mm DELIVERED TO SITE. IN ADDITION, THE CONTRACTOR SHALL TEST 2% OF THE STRUCTURAL
FASTENERS TO VERIFY THAT THE COATING COMPLIES WITH THE RELEVANT CODE REQUIREMENTS.
BEAMS ( EARTH FACE) : 50 mm HOCK LIAN SENG INFRASTRUCTURE PTE LTD
80 MARINE PARADE ROAD,
( OTHERS ) : 40 mm #21-08 PARKWAY PARADE,
ALL CONTACT SURFACES SHALL BE THOROUGHLY CLEANED BY HAND WIRE BRUSHING OR
SINGAPORE 449269
3.3 CRANKING OF COLUMN BARS NOT TO EXCEED A SLOPE OF 1 IN 10. SIMILAR MEANS IMMEDIATELY PRIOR TO BEING BROUGHT TOGETHER. TEL: 6344 0555 FAX: 6440 9049
SLAB ( EARTH FACE) : 40 mm
( OTHERS ) : 35 mm
4.7 COATINGS
3.4 STARTER BAR FOR WALLS AND COLUMNS
COLUMN ( EXTERNAL ) : 40 mm Contractor Consultants :
STARTER BARS FROM THE FLOOR STRUCTURAL SYSTEM FOR RC WALLS AND COLUMNS SHALL CORRESPOND IN 4.7.1 GALVANISING
( INTERNAL ) : 35 mm NUMBER AND SIZE TO THE REINFORCEMENT IN THE WALL OR COLUMN IN WHICH THEY ARE TO BE EMBEDDED.
GALVANISING, IF SPECIFIED SHALL BE HOT DIP GALVANISED
( EARTH FACE ) : 50 mm ALL STARTER BARS FOR WORK NOT CARRIED OUT WITHIN ONE MONTH SHALL BE PROTECTED WITH 2 COATS CIVIL & INFRASTRUCTURE DIVISION
IN ACCORDANCE WITH BS EN ISO 1461
OF CEMENT WASH. THE COATING SHALL BE MAINTAINED PERIODICALLY TO ENSURE PROTECTION TO THE CPG CONSULTANTS PTE LTD
WALL ( EARTH FACE) : 50 mm REINFORCEMENT. MINIMUM AVERAGE ZINC COATING SHALL BE 460 g/m2.
238B THOMSON ROAD, #16-00 TOWER B

( OTHERS ) : 35 mm CONSULTANTS
NOVENA SQUARE, SINGAPORE 307685
TEL: 6357 4572 FAX: 6357 4103
3.5 BRC / (WELDED STEEL FABRIC) WSFR LAYING
SUMP / DRAIN : 30 mm 4.7.2 PAINTING
FOR BOTH ONE-WAY AND TWO-WAY SLAB, THE OUTER STRAND (i.e. TOP-MOST STRAND FOR TOP MESH,
BOX CULVERT : 40 mm Contractor's Ref No :
AND BOTTOM-MOST STRAND FOR BOTTOM MESH) OF A WIRE MESH SHOULD BE SPANNING IN THE SHORTER ALL STEEL MEMBERS SHALL BE SAND BLASTED TO CLASS 1,

2.3 CONSTRUCTION JOINTS DIRECTION. PROPER LAPPING FOR MESHES IS TWO GRIDS LAP WITH CROSS WIRE UNCUT. PROPER ANCHORAGE FINISH AS PER BS EN ISO 8501-1:2007, PRIMED AND SHOP PAINTED Qualified Person Endorsement :

OF MESHES IS AS PER REBAR AS THE CROSS WIRE IS LIKELY TO BE CUT. BEFORE ASSEMBLY ON SITE.
SHALL BE APPROVED BY THE ENGINEER. WHERE WATER PROOFING IS AN
NEW WELDS, SCRATCHED PAINTWORK, BOLTS, NUTS AND WASHERS
IMPORTANT CONSIDERATION, THE CONTRACTOR SHALL PROVIDE
SHALL BE TOUCHED UP ON THE FIELD.
APPROVED WATERSTOP AND OTHER MEASURES TO ENSURE
WATERPROOFING AT THE JOINTS. STANDARD CERTIFICATION BY THE ACCREDITED CHECKER PRIMER AND FINISHING COATS SHALL CONFORM TO SPECIFICATION.

1. I, CHAN KOK SIONG (Accredited Checker) hereby certify that I have


2.4 CONSTRUCTION TOLERANCES carried out an evaluation, analysis and review of the detailed structural plans and
design calculations presented herein and am satisfied that there are no inadequacies
UNLESS OTHERWISE SPECIFIED, THE DIMENSIONAL TOLERANCES FOR in the key structural elements.

2. I further certify that these detailed structural plans and design calculations are
CONCRETE CONSTRUCTION SHALL COMPLY WITH ENV 13670 OR/AND LTA Endorsement :
in reference to Project Ref. No.: E4357-00002-2015-ST01
LTA M&W SPECIFICATION. and the key structural elements are consistent with the layout shown in the
building plans.

3. Total number of structural plans checked : 16


2.5 FLOOR RENDERING
4. I hereby declare that I have no professional or financial interest in the building works
THICKNESS OF SCREED RENDERING/MASS CONCRETE TOPPING EXCEEDING shown in the plans as defined in section 18 of the Building Control Act (Cap 29).

60 OR MORE SHALL BE REINFORCED WITH ONE LAYER OF WSFR A7.

ACCREDITED CHECKER

No.: 1101

CHAN KOK SIONG

in AC Organisation
Registration No.: A041
Project Title :

BUILDING CONTROL ACT


SINGAPORE CONTRACT 9061
OCT 2015
Accredited Checker's Signature and Stamp Date
DESIGN AND CONSTRUCTION OF
FOR APPROVAL ADDITIONAL STABLING YARD AT
GALI BATU DEPOT

Drawing Title :

GENERAL NOTES - (1)

Designed Checked Approved

CSS RT TSC
Scale Drawn Date

N.T.S GBD APR 2015

Drawing No. : Rev.

Z/9061/GBD/GN/1001 -
Rev. Date Drawn Description Chk'd App'd
CAD File Name:Z9061GBD-GN1001-.dgn Sheet of A1

Вам также может понравиться