SUBJECT : QUOTATION FOR ** TR AIR COOLED PACKAGE CHILLER


As per your discussion had with you for your above subject requirement.
we are pleased to submit our offer for the same are as under.

TECHNICAL BID
SPECIFICATION OF ** TR AIR COOLED PACKAGE CHILLER

SR. NO. Technical Parameter Value

{1} Equipment Air Cooled Package Chiller

{2} Ambient Temp. 45 degree Celsius(Maximum)

{3} Max. Relative Humidity 100%

{4} Compressor Scroll

{5} Refrigerant Capacity Total- ** TR

{6} Refrigerant R-***


{7} Power supply 3 phase 50 HZ AC 415 V

{8} Control Supply AC Single phase 230 V

{9} Motor Power ** KW

{10} Noise Level Less than 80 db at 1 meter Distance


Sr. No. Product Features

Compressor with buit –in Motor Ø Scroll

Ø  Shut off valve at inlet


{1}
Compressor Accessories Ø  Shut off valve at outlet

Ø  Non-return valve at outlet

Ø  High pressure cutout set with display.

Ø  Low pressure cutout set with display.

Ø  Chilled water flow failure trip

{2} Safety Interlocks Ø  Digital Temperature contoller

Ø  Compressor & Pump overload Trip

Ø  Under Voltage/Over voltage

ØSingle phasing preventor/Reverse phasing preven

{3} Control Panel ØFully Automatic control Panel

Ø Tube Thickness :- .27mm

Ø Tube MOC :- Copper Tube Inner Grooved

Ø Chemical Composition :- 98.99%

Ø Tube O.D :- 3/8


{4} Condenser (Air Cooled)
Ø Fins MOC :- Corrosion Preventive Aluminium Blue

Ø Fins Thickness :- .15mm

Ø End Plate MOC :- Galvanized Iron

Ø Pressure Testing :- 450 psi. for 24 Hours

Ø Coil in Tank type.


{5} Evaporator
Ø Capacity – 270Ltr, Make from S S 304 (With PUF I

{6} Capicity Control Ø 1 system 100%

{7} Expansion Valves Ø Thermostatic Expansion Valve


Ø  Inerconnecting refrigerant piping Copper(based o
compact layout.)
{8} Gas piping

Ø  Structural standfor compressor, condenser, liquid


chiller.

Ø  Process Inlet and outlet- 1.5 Inch


{9} Water Connection
Ø  Extra connections for Fresh water fill up with ball
Drainage/Overflow.

Ø  Assembly & installation of the complete chilling p

Ø  Pressure test with nitrogen for leakage, vacuum t


charging of gas into the chiller.
{10} Installation &Commissioning

Ø  Instrument cabling up to the control panel

Ø  Commissioning of the chiller.

Sr. No. Item Make/Manufacturer

{1} Compressor Danfoss OR Equal make Scroll type.

{2} Condenser Virat Make

{3} Evaporator Coil in Tank type.

{4} Expansion valve Danfoss OR Equal make .

{5} Gas Drier Danfoss or equal Make.

{6} HP/LP Danfoss or equal Make.

{7} Control panel Virat Make

{8} Switching Equipments Schneider / HPL or Equal Make.

{9} Process Water Pump CNP / Kirloskar or Equal make.


PRICE BID
Dear Sir/Madam
We thank you for your above referred enquiry . We pleased to submit our offer for the same as under

Sr. No. Item Description Qty Rate

{1} ** TR Air Cooled Package Chiller 1 Nos.

Terms & Condition:-


[1] Price quoted above are on Ex.-Factory basis. [Surat]

[2] GST Will be 18% Extra

One Year warranty from date of dispatch against manufa


We shall repair/replace such parts which may prove defe
which do not fail from neglect or missuse or faulty opera
Six Free services will be done within warranty period.
[3] Warranty Our Warranty Does not extend to consequential damage
damage due to normal wear and tear or failure of equip
due to corrosive atmosphere, damage sue to fluctuation
and unauthorized repairs or modifications carried out et

[4] Installation &Commissioning Extra as aplicable.

The equipment will be dispatched with in 4 to 6 weeks f


[5] Delivery of receipt of purchase order along with the advance

> 50% , Payable as advance with the purchase order


[6] Payment > Balance, with full taxes and duties, payable against ins
before dispatch wich ever is earlier

[7] Transportation Freight and forwarding charges and octroi and demurrag
be payable extra on actual
[8] Offer Validity The above offer is valid for a period of 30 Days

[9] Packing Packing & Forwarding charges@3% extra.


1. ALL CIVILWORK.

2. TOTAL INTERCONNECTING PIPING AND INSULATION W


OUTSIDE THE BASE FRAMES OF OUR SUPPLIED EQUIP

3. TOTAL INTERCONNECTING POWER CABLING AND OTH


RELATED ELECTRICAL WORK, OUTSIDE THE BASE FRAM
OUR SUPPLIED EQUIPMENT.
[10] Exclusive 4. UNLOADING, POSITIONING AND INSTALLATION OF AL
EQUIPMENT AT THEIR PROPER PLACE, WITH DUE CAR

5. ANY OTHER MATERIAL / WORK, WHICH IS NOT INCLU


WITHIN OUR SCOPE AND MAY BE REQUIRED FOR PRO
COMMISSIONING AND OPERATION OF THE SYSTEM.

6. INSULATION OF PIPING.

7.GLYCOL/WATER

[11] Our Bank Details :- HDFC BANK LTD. - A/C No:-02512320002956, IFSC No:-HDFC0000251.

Branch:-Ring Road, Surat.

We hope you will find above offer in line with your requirement and we now look forward for
your order at the earliest.

For, Virat Cooling Systems

Auth. Sign
ms
achha, SURAT - 395 006.
adodara Road, Dist. SURAT

Mo. No:-9825312030
Web : www.viratcooling.com

CHILLER
rement.
er.

Value

d Package Chiller

Celsius(Maximum)

100%

Scroll

tal- ** TR

R-***
415 V

230 V

** KW

b at 1 meter Distance
Features

ith display.

th display.

rip

ller

oad Trip

everse phasing preventor

el

nner Grooved

8.99%

entive Aluminium Blue Fins

d Iron

for 24 Hours

om S S 304 (With PUF Insulation).

alve
piping Copper(based on the

ssor, condenser, liquid receiver,

5 Inch

h water fill up with ball cock,

the complete chilling plant

for leakage, vacuum test &


r.

he control panel

er.

Manufacturer

ual make Scroll type.

rat Make

n Tank type.

OR Equal make .

or equal Make.

or equal Make.

rat Make

HPL or Equal Make.

kar or Equal make.


the same as under

Amount

0.00

dispatch against manufacturing defect.


ts which may prove defective and
r missuse or faulty operation.
thin warranty period.
o consequential damage or loss,
d tear or failure of equipment, controls
amage sue to fluctuation in voltage,
difications carried out etc.

ed with in 4 to 6 weeks from the date


ng with the advance

the purchase order


ties, payable against inspection and/or
ier

and octroi and demurrage, if any, will


iod of 30 Days

3% extra.
PING AND INSULATION WORK,
OF OUR SUPPLIED EQUIPMENT.

WER CABLING AND OTHER


OUTSIDE THE BASE FRAMES OF

ND INSTALLATION OF ALL THE


R PLACE, WITH DUE CARE.

K, WHICH IS NOT INCLUDED


Y BE REQUIRED FOR PROPER
ATION OF THE SYSTEM.

Вам также может понравиться