Вы находитесь на странице: 1из 7

WBS Criteria for Effective Project Control

Postula, Frank D
American Association of Cost Engineers. Transactions of the American Association of Cost Engineers; 1991;
ProQuest
pg. I6(1)

Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.
Reproduced with permission of the copyright owner. Further reproduction prohibited without permission.

Вам также может понравиться