National Disaster Risk Reduction and Management Center, Camp General Emilio Aguinaldo, Quezon City, Philippines
CHECKLIST
Province
Local Disaster Risk Reduction & Management Councils (LDRRMCs)
Gawad KALASAG CY 2018
LGU: ______________________
Date: ______________________
Score: ______________________
MINIMUM REQUIREMENTS:
1. LDRRM Office
2. Permanent LDRRM Officer
3. Operations Center
4. LDRRM Plan (approved and patterned from the NDRRM Plan)
5. CLUP and CDP (updated or ongoing formulation)
6. LCCAP (approved and patterned from the NCCAP)
7. Other basic requirements specified under the RA7160
GENERAL AGREEMENT:
Telefax: NDRRMC Opcen +63 (2) 911-1406; 912-2665; 912-5668; NDRRMC Secretariat +63 (2) 912-0441; 912-0459;
Office of the Administrator, Office of Civil Defense +63 (2) 912-2424
Email: dopcen@ndrrmc.gov.ph Website: www.ndrrmc.gov.ph
Risk Maps
Updated maps
(reckoning date)
Should be Digitized
(GIS Maps)
Prominently displayed
1.2 Is there a database on Complete data 2
elements at risk? (disaggregated)
Population (refer to
Guidance Notes)
Infra
Table as proof of the
availability of the
database
Narrative/ indication of
source of the
database/documents
Source documents of
items 1.2 & 1.3 is the
LDRRM Plan
Updated (3 years at the
minimum)
1.3 Conduct of Risk Have the LGUs 2
Assessment and conducted the risk
Analysis Assessment and
Analysis?
Any tool they used is
acceptable
Narrative?
Source document is the
PDPFP
Proof of verification-
narrative about the
process they underwent
Result of the risk
assessment and
analysis( evidence by
narrative, maps, tables)
2. Plans, Policies, and (8)
Budget
2.1 Are there disaster For Province 3
prevention and a. PDP
mitigation measures b. PDPFP-Provincial
integrated/ Development and
mainstreamed in the Physical Framework
local development Plan
plans? c. PDIP-Provincial
Development and
Investment Program
Page 2 of 12
2.2 Are there funds Look for the (SRE) 3
appropriated and Approved Budget
utilized for mitigation
measures?
2.3 Are all non-state Number of non-state 2
stakeholders involved stakeholders
in the planning and
implementation of
prevention and
mitigation
projects/activities of
the DRRMC. (CSOs,
women, youth, and
others such as
religious, business and
other basic sectors i.e.
Victims of Disasters
and Calamities,
PWDs. Elderly,
children, etc)?
Page 3 of 12
Volunteers (ACDVs) Section 13 )
5. Environmental (4)
Management
5.1 Is/are there Presence of 2
environmental environmental code and
ordinance/s? ordinances
5.2 Is/are there PPAs (Programs, 2
environmental Projects, and Activities)
program/s? implemented
6. Infrastructure Resilience (6)
6.1 Inspection/ Infrastructure Audit 2
Assessment of all Report/Action photos of
Public Infrastructure Inspection
and all Infrastructure For Barangay -
utilized by the public Coordination activities
with City/Municipality
6.2 Ensuring all Compliance to the 2
constructions comply National Building Code
to accepted standards Occupancy Permits
and specifications
6.3 Does the LGU conduct Regular Risk 2
periodic Maintenance assessment of the
of public facilities? infrastructure
Maintenance activities
done to the public
facilities
Budget allocated for
maintenance
Page 4 of 12
Council/Committee
(Supporting Document:
Certificate of
Accreditation) (.5pt)
1.2 Regularity of Minimum: Quarterly 1
Council Meetings
Page 5 of 12
2.4 Equipage Adequacy of equipment 2
2.4.1 Office
Operations
2.4.2 Training
2.4.3 Search and
Rescue and
Medical
2.4.4Transportation
2.5 Operations Center .5
manned on a 24hr
basis
2.6 Efficient and Laymanized .5
effective IEC Available
materials on Customized guidance
hazards, risks, notes
vulnerabilities, Posting in Conspicuous
EWS, and Areas
counter-measures Supporting Document:
Sample IEC attached in
the entry
2.7 Pre-positioned Presence of stockpile .5
stockpiles of relief items or negotiated
goods (food and credit line MOU/MOA
non-food) or a
negotiated
agreement with
local suppliers
2.8 Submission of the Reports received by .5
DRRMO of the LDRRMC and LDC
LDRRMF
Utilization Report
to the LDRRMC
AND LDC
3. Plans (3)
Page 6 of 12
4.1 Disaster Risk General and basic .5
Reduction and DRRM Orientation
Management conducted
(DRRM) Orientation for PDRA
conducted
4.2 Evacuation Camp At least (1) training .5
Management conducted during the
review year
4.3 Community-based Levels of training (basic .5
DRRM or advance/ladderized)
At least (1) training
conducted during the
review year
4.4 Search and At least (1) training 1
Rescue conducted during the
4.4.1 Water review year
4.4.2 Collapsed
Structure
4.4.3 Mountain
4.4.4 Swift Water
4.5. Fire Suppression At least (1) training .5
conducted during the
review year
4.6. Medical Services At least (1) training .5
(Basic Life conducted during the
Support, First Aid) review year
4.7 Incident Command At least (1) training .5
System (ICS) conducted during the
review year
4.8 Family and At least (1) training .5
Community-Based conducted during the
Disaster review year
Preparedness &
Monitoring System
4.9 RDANA At least (1) training .5
conducted during the
review year
4.10 Psycho-social At least (1) training .5
Intervention conducted during the
review year
4.11 Involvement of Participation as .5
NGOs/CSOs/ resource person or
Business and participant
Private in the After activity report
conduct of training Action photos
(enabler and Certificates *guidance
receiver) notes
5. Partnership (3)
Mechanisms/Linkages
Page 7 of 12
5.1 Participation of MOA/MOU of the 1
NGOs, Business partnership relating to
and Private preparedness
Sectors, and others (excluding the conduct
of training)
Page 8 of 12
1.1.7 Identification of List of sites and 1
Standard based centers/maps
Evacuation Sites
and/or Centers and
Routes
1.1.8 Readiness to List of vehicles and 1
provide drivers and/or MOA
transportation for with transport groups
Evacuation if available
1.1.9 Establishment of Evacuation center 2
Standard constructed
Evacuation purposely for
Center(s) evacuation
OR
Page 9 of 12
1.2.8 Conduct of Rapid Copy of RDANA 2
Damage Reports
Assessment and
Needs Analysis
(RDANA) within
72 hours after the
occurrence of the
disaster
OR
Page 10 of 12
source
Involvement of multi-
stakeholder in
planning,
implementation and
monitoring of the
recovery plan
2.3 Restoration Compliance with 5
Build-back Better
Principle
Status of projects in
the recovery plan
Supporting docs:
reports, list of PPAs
status of
implementation
Page 11 of 12
Summary Sheet
MAX. ACTUAL Remarks,
Criteria for Checking Recommendations
SCORE SCORE and Suggestions
II. PREPAREDNESS 30
III. RESPONSE 20
TOTAL 100
Excellent 91-100%
Good 71-80%
Validated by:
Name:
Position:
Agency:
Date:
Page 12 of 12