PLTD

Pesanggaran Bali
200 MW
CASE STUDY

Grid stability in Indonesia –


generating reliable electricity
in Bali with operational and “Thanks to its superior operation and
fuel flexibility fuel flexibility, the addition of the PLTD
Pesanggaran 200 MW plant to the grid
Indonesia is one of Asia’s fastest growing economies in terms has helped us improving significantly
of energy consumption. With a steadily growing population of the reliability of electricity supply to Bali
nearly 270 million and an increasing rate of urbanization, there in an economical way.”
is significant need for a reliable and guaranteed supply of power
throughout the archipelago. In recent years, the country has been Mr Igan Subawa Putra,
successful in increasing installed capacity and investments in General Manager, Indonesia Power,
infrastructure to both improve the reliability and efficiency of the Pesanggaran Bali
main grids such as the Java-Grid and increase electrification of
the small grids. In this specific case, Wärtsilä’s flexible baseload
power plant with superior internal combustion engine technology
and flexibility provides the efficiency and reliability required for
supporting this portion of the Java-Bali grid. Its low emission
capability and reduced carbon footprint as compared to inflexible
generation also supports Indonesia’s path to a cleaner future.

8 / 2018
KEY DATA

Powering the Bali grid Power plant of the year

Built in consortium with PT Announced as the winner of the best CUSTOMER


Pembangunan Perumahan (Persero) dual-fuel power plant of 2016 by Asian
PT Indonesia Power (utility)
Tbk (PT PP), one of Indonesia’s Power Awards, the PLTD Pesanggaran
largest construction contractors, the Bali was chosen for its large nominal
Pesanggaran Bali 200 MW power plant output and ability to perform efficiently T YPE
is the largest engine-based power while operating on natural gas or HFO. Wär tsilä 50DF multi-fuel power plant
plant in Indonesia. PT. Indonesia With over 48% thermal efficiency at any
Power, a subsidiary of the state utility load and its smart power generation OPER ATING MODE
PT Perusahaan Listrik Negara (PLN) features, it was a stand out. “The power
Flexible baseload
(Persero), contracted this Wärtsilä plant ensures greater reliability in the
50DF multi-fuel power plant due to its supply of electricity to both domestic
unique operational and fuel flexibility in and industrial consumers on the island GENSETS
challenging conditions. With a fast start of Bali. The fuel versatility of this plant 12 x Wär tsilä 18V50DF
and stop ability to reach full loading in provides valuable flexibility of operation
under 10 min and seamless control over and reliability to PT Indonesia Power’s TOTAL OUTPUT
load fluctuations, this plant provides customers,” says Tim Charlton, Editor-in-
200 MW
a greater consistency in the supply Chief of Asian Power.
of electricity to the Java-Bali grid.
Additionally, the plant’s modular design Furthermore, this engineering, FUEL
makes it feasible to upgrade the power procurement & construction (EPC) Natural gas & HFO
plant to meet any future needs without contract highlights Wärtsilä’s fast-
risking operational reliability. track delivery capability. This order SCOPE
was received in the fourth quarter 2013
Engineering, procurement &
Pesanggaran Bali is powered by 12 and began functioning at full output by
Wärtsilä 50DF engines that can run the end of May 2015, proving Wärtsilä construction (EPC)
on either regasified liquefied natural understands the requirements for power
gas (LNG), light fuel oil (LFO), or heavy plant projects and is fully capable of DELIVERY
fuel oil (HFO). When the gas supply is handling and managing the complete 2015
uncertain, or prices are volatile, it is scope of contracting arrangements. The
possible to switch from gas to liquid fuel, success of this plant further strengthens
and vice versa, even during operation Wärtsilä’s presence in the country with
whilst also maintaining a high output. an existing 3500 MW installed power in
Wärtsilä gas engines reach over 50% operation and projects under execution
electrical efficiency which translates and service agreements for more than
into considerable savings in fuel costs 350 MW of generating capacity.
compared to other technologies.

Fuel flexibility – the path to a


cleaner future

Although this plant began operating


on HFO after its delivery in 2015, since
the building of the Tanjung Benoa LNG
storage and regasification terminal in
July 2016, it operates primarily on LNG.
The engines function on a lean-burn
principle where lean combustion enables
a high compression ratio, which in turn
increases engine efficiency, reduces
peak temperatures, and therefore also THE CHALLENGE WÄRTSIL Ä’S SOLUTION BENEFIT
reduces NO_2 emissions. In gas mode,
the carbon footprint is significantly Rapidly growing electricity 200 MW flexible baseload Ensuring a ready, reliable
reduced, contributing to an improved demand power plant electricity supply to the Bali sub
environment and supporting sustainable system grid
generation. As a part of Indonesia’s
2016-2025 Electricity Supply Business Base load fluctuations Modern internal combustion Operational flexibility with ultra-fast
Plan, the country aims to achieve 23% engine technology with ability to starts and stops
renewable energy by 2025. This power reach full load in less than 10 min
plant thus enhances the gas security
in the region and opens the market to Supply interruptions Dual-fuel engines that run on both Provides scope for renewable
greater renewable penetration. LNG and HFO penetration and gas sector
development

wartsila.com

WÄRTSILÄ® is a registered trademark. Copyright © 2018 Wärtsilä Corporation.


Specifications are subject to change without prior notice.