Project Delivery Methods

Construction Manager/
Design-Bid-Build General Contractor Design-Build

Owner Owner Owner


Essential Elements

Designer Contractor Designer CM/GC Design-Build Firm

 Traditional delivery system  Owner engages a construction manager  Combines design and construction under
 Owner contracts separately for design and (CM) to act as a construction advisor a single contract
construction services during the pre-construction phase and  Traditionally a lump sum contract
 Bid based on complete (100%) plans and general contractor (GC) during  Two phase procurement
specifications construction 1. Qualifications
 Owner retains high level of control and risk  Selection criteria include qualifications, 2. Technical/Price
 Traditionally a unit priced contract experience, strategic approach, and cost
elements
Contractor Involvement

Design Construction Maintenance Design Construction Maintenance Design Construction Maintenance

Contractor Contractor Design-Build Firm


Involvement Involvement Involvement

 Projects where the owner needs to  Projects where owner requires control of  Projects that benefit from innovation in
completely define the scope scope during design design and/or construction
Applicability

 Project scope can be best defined using  Project with multiple phases or contracts  Well defined project scope
prescriptive specifications  Time or funding constraints  Projects that would benefit from
 Significant risks or third-party issues (ROW,  Complete or obtainable environmental expedited project delivery
utility, environmental) that can be best documents and permits  Projects having minimal public
resolved or managed by the agency controversy or third party issues

 Applicable to a wide range of projects  Allows for innovation and constructability  Potential for innovation and quality
 Well established and easily understood during design through collaboration of CM enhancement
 Owner retains design control  Reduces error, change orders, and  Accelerate delivery by fast-tracking
 Provides the lowest initial price that materials overruns design and construction
Advantages

responsible, competitive bidders can offer  Identifies and manages risk  Single point responsibility for design and
 No legal barriers in procurement and  Agency retains control over design construction
licensing  Early procurement and construction  Early contractor involvement to enhance
phases prior to completed design constructability of plans
 Earlier schedule and cost certainty
 Reduces error, change orders, and
materials overruns

 Initial low bid might not result in ultimate  Potential appearances of unfairness in sole  Potential to reduce opportunities for
lowest cost or final best value source selection process small construction firms
Risks/Limitations

 Higher level of inspection/testing by the  Potential for failure to agree on price and  Less owner control over design
agency PS&E sent out for bid  Higher procurement costs for proposers
 Agency bears risk of design adequacy  Determining appropriate level of design to  Potential to compromise quality
 Potential adversarial relationship among take advantage of innovations.  Considerable time and effort in RFQ/RFP
the contracting parties  Additional CM fees and independent agent selection process
 Limited opportunity to incentivize during pre-construction
contractors to provide enhanced
performance (cost, time, quality)

 Qualified Low Bid  Best Value Selection  Best Value Selection


Procurement

 A+B Bidding  Performance Specifications  Performance Specifications


Methods

 Alternate Bids  Contingency pre-negotiated  Incentive/Disincentive for time, quality,


 QA Specifications  Incentive/Disincentive for early traffic, safety, etc.
 Incentives/Disincentives for time and completion
quality