KARNATAKA POWER TRANSMISSION CORPORATION LIMITED

Peak Load Details of 400/220 KV Lines for the year 2004-05

Name of the Transmission Line Ther Peakload of lines


Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

1 400 KV Nelamangala Line


Nelamangala Hoody SC D.Moose 533 722 420 640 28-Apr-04 0:00 731.43 568.89
2 400 KV Gooty Line
Gooty Hoody SC D.Moose 533 722 470 660 26-Mar-05 11:00 754.29 586.67
3 400 KV Kolar No.1 Line
Kolar Hoody SC Q.Bersimis 562 722 460 660 30-Dec-04 12:00 754.29 586.67
4 400 KV Kolar No.2 Line
Kolar Hoody SC Q.Bersimis 562 722 580 740 10-May-04 11:00 845.71 657.78
5 220 KV HSR Line
Hoody HSR Layout DC Drake 124 788 123 380 24-Feb-05 14:00 434.29 337.78
6 220 KV ITPL Line
Hoody ITPL DC Drake 124 788 120 300 23-Jul-04 9:00 342.86 266.67
7 220 KV Hoody - Nelamangala Line
Hoody Nelamangala SC Drake 124 394 131 346 06-Apr-04 12:00 395.43 307.56
8 220 KV Hoody - D.B.Pura Line
Hoody D.B.Pura SC Drake 124 394 230 640 10-Jan-05 12:00 731.43 568.89
9 220 KV Hoody - Hebbal Line
Hoody Hebbal SC Drake 124 394 192 480 06-Mar-05 9:00 548.57 426.67
10 220 KV Hoody - Malur Line
Hoody Malur SC Drake 124 394 250 610 29-Aug-04 15:00 697.14 542.22
11 220 KV Hoody - Railways -I
Hoody Railways SC Drake 124 394 10.78 56 12-Jul-04 8:00 64.00 49.78
12 220 KV Hoody - Railways -II
Hoody Railways SC Drake 124 394 10.8 64 24-Apr-04 22:00 73.14 56.89
13 400 KV 400 KV Guddadahalli Line
Guddadahalli Guttur SC T.Moose 533 722 386 580 07-Apr-04 8:00 662.86 515.56
14 400 KV 400 KV RTPS Line

Page 1 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

RTPS Guttur SC T.Moose 533 722 506 760 29-Nov-04 14:00 868.57 675.56
15 400 KV 400 KV Hiriyur Line-I
Guttur Hiriyur DC 413 620 05-Apr-04 8:00 708.57 551.11
16 400 KV 400 KV Hiriyur Line-II T.Moose 533 1443.4
Guttur Hiriyur DC 386 580 17-May-04 8:00 662.86 515.56
17 220 KV 220 KV Davanagere Line-I
Guttur Davanagere DC Drake 124 788 230 600 02-Jul-04 20:00 685.71 533.33
18 220 KV 220 KV Davanagere Line-II
Guttur Davanagere DC Drake 124 788 0 0
19 220 KV 220 KV Davanagere Line-III
Guttur Davanagere DC Drake 124 788 246 640 05-Apr-04 5:00 731.43 568.89
20 220 KV 220 KV Hiriyur Line
Guttur Hiriyur DC Drake 124 788 215 560 27-Jan-05 15:00 640.00 497.78
21 220 KV 220 KV Ranebennur Line
Guttur Ranebennur SC Drake 124 394 170 440 06-Apr-04 9:00 502.86 391.11
22 220 KV 220 KV Kaiga Line-I
Guttur Kaiga DC 246 640 01-Sep-04 12:00 731.43 568.89
23 220 KV 220 KV Kaiga Line-II T.Moose 533 1443.4
Guttur Kaiga DC 303 790 03-Sep-04 6:00 902.86 702.22
24 220 KV 220 KV Haveri Line-I
Guttur Haveri DC 170 440 09-Dec-04 16:00 502.86 391.11
25 220 KV 220 KV Haveri Line-II Drake 124 1443.4
Guttur Haveri DC 61 160 10-Dec-04 13:00 182.86 142.22
26 220 KV Lingapur Itagi - Guttur Line
Lingapur Guttur SC Drake 124 394 150 456 29-Apr-04 16:00 521.14 405.33
27 220 KV Lingapur - Hubli Line-I
Lingapur Hubli DC 165 476 14-Nov-04 17:00 544.00 423.11
28 220 KV Lingapur - Hubli Line-II Drake 124 788
Lingapur Hubli DC 200 592 02-Sep-04 4:00 676.57 526.22
29 220 KV Lingapur-RTPS Line-I
Lingapur RTPS SC Drake 124 394 120 353 01-Apr-04 8:00 403.43 313.78

Page 2 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

30 220 KV Lingapur-RTPS Line-II


Lingapur RTPS SC Drake 124 394 190 578 16-May-04 7:00 660.57 513.78
31 220 KV Guddadahalli - Lingapur Line-I
Guddadahalli Lingapur DC Drake 124 788 110 304 12-Nov-04 23:00 347.43 270.22
32 220 KV Guddadahalli - Lingapur Line-II
Guddadahalli Lingapur DC Drake 124 788 140 360 15-Jul-04 13:00 411.43 320.00
33 220 KV Guddadahalli - Kalyani Steel Line
Guddadahalli Kalyani Steel DC Drake 124 788 0 0
34 220 KV Lingapur - Jindal Line-I
Lingapur jindal DC Drake 124 788 150 475 25-Mar-05 11:00 542.86 422.22
35 220 KV Lingapur - Jindal Line-II
Lingapur jindal DC Drake 124 788 105 320 14-Mar-05 12:00 365.71 284.44
36 220 KV Lingapur- Power House Line-I
Power House Lingapur DC Drake 124 788 80 240 28-Mar-05 6:00 274.29 213.33
37 220 KV Lingapur- Power House Line-II
Power House Lingapur DC Drake 124 788 95 260 08-Mar-05 8:00 297.14 231.11
38 220 KV RTPS - Lingasugur Line1 DC
RTPS Lingasugur 176 504 21-Apr-04 11:00 576.00 448.00
Drake 124 788
39 220 KV RTPS - Lingasugur Line2 DC
RTPS Lingasugur 176 504 21-Apr-04 11:00 576.00 448.00
40 220 KV RTPS - Lingasugur Line3 SC Drake 124 394
RTPS Lingasugur 176 504 21-Apr-04 11:00 576.00 448.00
41 220 KV RTPS - Raichur Line SC Drake 124 394
RTPS Raichur 136 334 28-Aug-05 7:00 381.71 296.89
42 220 KV Lingasugur - Bagewadi Line1 DC
Lingasugur Bagewadi 176 504 21-Apr-04 20:00 576.00 448.00
Drake 124 788
43 220 KV Lingasugur - Bagewadi Line2 DC
Lingasugur Bagewadi 192 554 17-Feb-05 11:00 633.14 492.44
44 220 KV Lingasugur - Lingapur Line1 SC Drake 124 394
Lingasugur Lingapur 160 414 02-Apr-04 4:00 473.14 368.00

Page 3 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

45 220 KV Lingasugur - Lingapur Line2 SC Drake 124 394


Lingasugur Lingapur 209 541 30-Apr-04 8:00 618.29 480.89
46 220 KV Lingapur - Kushtagi Line DC Drake 124 788
Lingapur Kushtagi 100 300 05-Feb-04 19:00 342.86 266.67
47 400 KV Somanahalli Line
SC
Nelamangala Somanahalli D.Moose 533 722 427 663 19-Nov-04 19:00 757.71 589.33
48 220 KV Anchepalya Line-1
Nelamangala Anchepalya 81 265 01-Dec-04 17:00 302.86 235.56
DC Drake
49 220 KV Anchepalya Line-II
Nelamangala Anchepalya 124 788 57 69 19-Sep-04 18:00 78.86 61.33
50 220 KV Peenya -4 Line
SC
Nelamangala Peenya Drake 124 394 204 543 07-Apr-04 19:00 620.57 482.67
51 220 KV Peenya -3 Line
SC
Nelamangala Peenya Drake 124 394 205 564 07-Apr-04 19:00 644.57 501.33
52 220 KV Peenya -2 Line
SC
Nelamangala Peenya Drake 124 394 207 580 07-Apr-04 19:00 662.86 515.56
53 220 KV Hassan Line
SC
Nelamangala Hassan Drake 124 394 136 379 05-Mar-04 18:00 433.14 336.89
54 220 KV KB Cross Line
SC
Nelamangala KB Cross Drake 124 394 168 538 04-Mar-04 8:00 614.86 478.22
55 220 KV Antharasanahalli Line
SC
Nelamangala A.Halli Drake 124 394 158 490 09-Jan-05 6:00 560.00 435.56
56 220 KV RTPS - Sedum Line -I
RTPS Sedum SC Drake 124 394 165.6 458 27-Nov-04 06;0 523.43 407.11
57 220 KV RTPS - Sedum Line -II
RTPS Sedum SC Drake 124 394 168.6 465 27-Nov-04 6:00 531.43 413.33
58 220 KV Sedum - Humnabad -I DC
Sedum Humnabad Drake 124 788 44 205 01-Jan-05 19:00 234.29 182.22
59 220 KV Sedum - Humnabad -II DC
Sedum Humnabad 62 289 12-Jun-04 20:00 330.29 256.89

Page 4 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

60 220 KV Sedum - Tandur Line SC Drake 124 394


Sedum Tandur 132 324 22-Sep-04 11:00 370.29 288.00
61 220 KV Sedum - Shahabad Line SC Drake 124 394
Sedum Shahabad 120 554 27-Nov-04 6:00 633.14 492.44
62 220 KV Lingasugur - Shahabad Line SC Drake 124 394
Lingasugur Shahabad 69 320 21-May-04 7:00 365.71 284.44
63 220KV Nagajhari - Hubli Line-I DC 183 550 30-Aug-04 14.00. 628.57 488.89
Nagajhari Hubli
Drake 124 788
64 220 KV Nagajhari - Hubli Line-2 DC 183 550 30-Aug-04 14.00. 628.57 488.89
Nagajhari Hubli
65 220 KV Nagajhari - Hubli Line-3 DC 183 550 30-Aug-04 14.00. 628.57 488.89
Nagajhari Hubli
Drake 124 788
66 220 KV Nagajhari - Hubli Line-4 DC 183 550 30-Aug-04 14.00. 628.57 488.89
Nagajhari Hubli
67 220 KV Talaguppa - Hubli Line SC Drake 124 394 120 360 22-Mar-04 8.00. 411.43 320.00
Talaguppa Hubli
68 220 KV Sharavathi - Hubli Line DC Drake 124 788 160 480 10-Jul-04 18.00. 548.57 426.67
Sharavathi Gen Hubli
69 220 KV Hubli-Gadag Line DC Drake 124 788 200 600 22-Dec-04 19.00. 685.71 533.33
Hubli Gadag
70 220 KV Hubli-Narendra Line-1 DC 183 550 30-Aug-04 14.00. 628.57 488.89
Hubli Narendra
Drake 124 788
71 220 KV Hubli-Narendra Line-2 183 550 30-Aug-04 14.00. 628.57 488.89
Hubli Narendra DC
72 220 KV Hubli-Mahalingapur Line SC Drake 124 394
Hubli Mahalingpur 135 405 01-Sep-04 20.00. 462.86 360.00
73 220 KV Ambewadi - Narendra Line1 DC
Ambewadi Narendra 178 472 21-Aug-04 17.00. 539.43 419.56
74 220 KV Ambewadi - Narendra Line2 DC Drake 124 788
Ambewadi Narendra 208 551 03-Sep-04 20.00. 629.71 489.78

Page 5 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

75 220 KV Narendra - Belgaum Line1 DC


Narendra Belgaum 160 480 30-Aug-04 17.00. 548.57 426.67
76 220 KV Narendra - Belgaum Line2 DC Drake 124 788
Narendra Belgaum 163 480 17-Feb-04 10.00. 548.57 426.67
77 220 KV Sharavathi - Ranebennur Line SC Drake 124 394
Sharavathi Ranebennur 195 510 02-Sep-04 11.00. 582.86 453.33
78 220 KV Nagajhari - Ambewadi Line1 DC
Nagajhari Ambewadi 177 469 30-Mar-04 10.00. 536.00 416.89
79 220 KV Nagajhari - Ambewadi Line2 DC Drake 124 788
Nagajhari Ambewadi 177 469 30-Mar-04 10.00. 536.00 416.89
80 220 KV Ambewadi - Ponda(Xeldom)Line DC
Ambewadi Ponda 92 244 01-Oct-04 19.00. 278.86 216.89
81 220 KV Ambewadi - Ponda Line2 DC Drake 124 788
Ambewadi Ponda 91 241 17-Jun-04 15.00. 275.43 214.22
82 220 KV Kadra - Karwar Line1 DC
Kadra Karwar 48 120 16-Sep-04 20.00. 137.14 106.67
83 220 KV Kadra - Karwar Line2 DC
Kadra Karwar Drake 124 788 42 120 18-Oct-04 20.00. 137.14 106.67
84 220 KV Chikkodi - Kollapur Line DC Drake 124 788
Chikkodi Kollapur Idle charged from Chikkodi end
85 220 KV Bagewadi - Bagalkot Line1
Bagewadi Bagalkot 150 416 08-Apr-04 10.00. 475.43 369.78
86 220 KV Bagewadi - Bagalkot Line2
Bagewadi Bagalkot DC Drake 124 788 163 492 29-Apr-04 15.00. 562.29 437.33
87 220 KV Bagalkot - Mahalingapur Line1
Bagalkot Mahalingapur 120 320 08-Mar-04 10.00. 365.71 284.44
88 220 KV Bagalkot - Mahalingapur Line2
Bagalkot Mahalingapur DC Drake 124 788 120 380 08-Mar-04 10.00. 434.29 337.78
89 220 KV Belgaum - Chikkodi Line1
Belgaum Chikkodi 61 183 23-Jul-04 7.00. 209.14 162.67
90 220 KV Belgaum - Chikkodi Line2
DC Drake 124 788
Page 6 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

Belgaum Chikkodi DC Drake 124 788 61 183 23-Jul-04 7.00. 209.14 162.67

Page 7 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

91 220 KV Talaguppa - Sharavathi Line


Sharavathi Talaguppa SC Drake 124 394 81 247 03-Aug-04 8:00 282.29 219.56
92 220 KV Hubli Line
Talaguppa Hubli DC Drake 124 788 144 375 14-Nov-04 02:00 428.57 333.33
93 220 KV Sharavathi Line
Talaguppa Sharavathi DC Drake 124 788 178 462 28-May-04 22:00 528.00 410.67
94 220 KV STRP - I
Talaguppa STRP DC Drake 124 788 180 473 20-Apr-04 19:00 540.57 420.44
95 220 KV STRP - II
Talaguppa STRP DC Drake 124 788 121 316 19-Apr-04 19:00 361.14 280.89
96 220 KV KM - I
Kemar Kavoor DC Drake 124 788 119 360 25-Jun-04 05:00 411.43 320.00
97 220 KV KM - II
Kemar Kavoor DC Drake 124 788 131 395 8-May-04 22:00 451.43 351.11
98 220 KV T.K. - I
Tannirbhavi Kavoor DC Moose 533 1443.4 222 655 6-Jan-04 11:00 748.57 582.22
99 220 KV T.K. - II
Tannirbhavi Kavoor DC Moose 533 1443.4 113 340 9-Feb-04 14:00 388.57 302.22
100 220 KV Varahi - Kemar - I
Varahi Kemar DC Drake 124 788 72 210 30-Dec-04 13:00 240.00 186.67
101 220 KV Varahi - Kemar - II
Varahi Kemar DC Drake 124 788 140 352 19-Dec-04 12:00 402.29 312.89
102 220 KV Kemar - Mangalore - I
Kavoor Kemar DC Drake 124 788 236 264 21-Oct-04 11:00 301.71 234.67
103 220 KV Kemar - Mangalore - II
Kavoor Kemar DC Drake 124 788 194 255 28-Oct-04 20:00 291.43 226.67
104 220 KV Kemar - Kuduremukh - I
Kemar KIOCL Kudure DC Drake 124 788 75 206 22-Jul-04 23:00 235.43 183.11
105 220 KV Kemar - Kuduremukh - II
Kemar KIOCL Kudure DC Drake 124 788 70 211 6-Feb-04 24:00 241.14 187.56

Page 8 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

106 220 KV Kadakola - C.R. Nagara - I


Kadakola C.R. Nagara DC Drake 124 788 49 150 21-Jun-04 06:00 171.43 133.33
107 220 KV Kadakola - C.R. Nagara - II
Kadakola C.R. Nagara DC Drake 124 788 63 210 6-Jul-04 16:00 240.00 186.67
108 220 KV Kadakola - Hootagally
Hootagally Kadakola SC Drake/Kun 124 394 190 500 24-Sep-04 19:00 571.43 444.44
109 220 KV Kerala Line
Kadakola Kanniyampet SC Drake/Kun 124 394 120 325 25-Sep-04 19:00 371.43 288.89
110 220 KV Kadakola - C.R. Nagara - I
Kadakola C.R. Nagara DC Drake 124 788 48 140 15-Mar-04 19:00 160.00 124.44
111 220 KV Kadakola - C.R. Nagara - II
Kadakola C.R. Nagara DC Drake 124 788 48 140 15-Mar-05 19:00 160.00 124.44
112 220 KV Shimoga - Hassan
Shimoga Hassan SC Drake 124 394 120 360 29-Jun-04 15:00 411.43 320.00
113 220 KV Hassan - Nelemangala
Hassan Nelemangala DC Drake 124 788 100 300 21-Apr-04 03:00 342.86 266.67
114 220 KV Sharavathi - I
MRS Shimoga Sharavathi DC Drake 124 788 190 570 23-Aug-04 11:00 651.43 506.67
115 220 KV Sharavathi - II
MRS Shimoga Sharavathi DC Drake 124 788 190 570 23-Aug-04 11:00 651.43 506.67
116 220 KV Sharavathi - III
MRS Shimoga Sharavathi DC Drake 124 788 190 570 23-Aug-04 11:00 651.43 506.67
117 220 KV Sharavathi - IV
MRS Shimoga Sharavathi DC Drake 124 788 190 570 23-Aug-04 11:00 651.43 506.67
118 220 KV DVG - I
MRS Shimoga Davanagere DC Drake 124 788 165 495 5-Apr-04 03:00 565.71 440.00
119 220 KV DVG - II
MRS Shimoga Davanagere DC Drake 124 788 200 600 5-Apr-04 03:00 685.71 533.33
120 220 KV Bangalore - I
MRS Shimoga Peenya DC Drake 124 788 140 420 19-Aug-04 08:00 480.00 373.33
121 220 KV Bangalore - II

Page 9 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

MRS Shimoga Peenya DC Drake 124 788 165 495 19-Aug-04 08:00 565.71 440.00
122 220 KV Bangalore - III
MRS Shimoga Peenya DC Drake 124 788 150 250 15-Dec-04 19:00 285.71 222.22
123 220 KV Bangalore - IV
MRS Shimoga Peenya DC Drake 124 788 150 450 15-Dec-04 19:00 514.29 400.00
124 220 KV Varahi - I
MRS Shimoga Varahi DC Drake 124 788 140 420 10-Dec-04 15:00 480.00 373.33
125 220 KV Varahi - II
MRS Shimoga Varahi DC Drake 124 788 140 420 10-Dec-04 15:00 480.00 373.33
126 220 KV Mysore - I
MRS Shimoga Hootagally DC Drake 124 788 160 480 21-Apr-04 10:00 548.57 426.67
127 220 KV Mysore - II
MRS Shimoga Hootagally DC Drake 124 788 165 495 21-Apr-04 10:00 565.71 440.00
128 220 KV Hootagally - Tubinakere line
Tubinakere Hootagally DC Drake 124 788 78 235 17-Feb-04 13:00 268.57 208.89
129 220 KV Tubinakere - Shimoga
Tubinakere MRS Shimoga DC Drake 124 788 140 410 26-Jan-05 19:00 468.57 364.44
130 220 KV Mysore - Shimoga
MRS Shimoga Hootagally DC Drake 124 788 83 249 6-Mar-05 11:00 284.57 221.33
131 220 KV Mysore - Hassan
Hootagally Hassan DC Drake 124 788 62 186 12-Jul-05 08:00 212.57 165.33
132 220 KV Mysore - T.K. Hally
Hootagally T.K. Hally SC Drake 124 394 83 222 30-Jan-05 14:00 253.71 197.33
133 220 KV Mysore - Kadakola
Hootagally Kadakola SC Dra/Kun 124 394 186 516 1-Aug-05 19:00 589.71 458.67
134 220 KV T.K. Hally - Mysore
T.K. Hally Hootagally SC Drake 124 394 175 410 13-Mar-05 21:00 468.57 364.44
135 220 KV T.K. Hally - Somanahally
T.K. Hally Somanahally SC Drake 124 394 240 610 13-Mar-05 21:00 697.14 542.22
136 220 KV Somanahalli -TK Halli Line (Via Harohally)

Page 10 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

Drake/
Somanahalli TK Halli SC 124 394 240 720 13-Mar-05 12:00 822.86 640.00
kunda
137 220 KV Somanahalli - Bidadi Line1
Somanahalli Bidadi DC Drake 124 788 40 120 18-Feb-05 9:00 137.14 106.67

Page 11 of 28
Name of the Transmission Line Ther Peakload of lines
Conf
mal Amps Amps jf
SL. Voltage igur Conducto
SIL Limit jf Vg at Vg at
No. Class atio r type
in -12.5% +12.5%
n Time in
From Station To Station Amps MW Amps Date
hours

138 220 KV Somanahalli - Bidadi Line2


Somanahalli Bidadi DC 124 788 40 120 18-Feb-05 9:00 137.14 106.67
139 220 KV Somanahalli - Subramanyapura Line
Drake/
Somanahalli Subramanyapu SC 124 394 170 510 18-Mar-05 10:00 582.86 453.33
kunda
140 220 KV Somanahalli - Yerandahalli Line
Drake/
Somanahalli Yerandahalli SC 124 394 120 360 21-Mar-05 10:00 411.43 320.00
kunda
141 220 KV Somanahalli - HSR Line
Somanahalli HSR Layout SC Drake 124 394 160 380 18-Mar-05 19:00 434.29 337.78
142 220 KV Somanahalli - ITPL Line
Somanahalli ITPL SC Drake 124 394 110 330 18-Mar-05 12:00 377.14 293.33
143 220 KV Somanahalli - NRS (ViaTataguni )
Somanahalli Tataguni SC Drake 124 394 150 450 18-Feb-05 10:00 514.29 400.00
144 220 KV Subramanyapura - Peenya Line
Subramanyapura Peenya SC Kunda 124 394 160 124 19-Jan-05 8:00 141.71 110.22

Page 12 of 28
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Peak load details of 400 KV and 220 KV Stations for the year 2004-05
Station peak load

SL. Capacity Voltage Amps if Vg Amps if Tranf Capacitor


Name of the Station Time in ormer
NO in MVA Ratio MW Amps at Vg at Date
hours TAP
-
12.5% +12.5% No
Amps MVAR

400 KV Stations
1 400 KV Hoody 500 460 730 834.29 648.89 24-Feb-05 14:00 12 - -
400/220
500 440 730 834.29 648.89 21-Aug-04 11:00 12 - -
2 400 KV Nelamangala 500 400/220 531 865 988.57 768.89 7-Apr-04 19:00 12 - -
3 400 KV Guttur 315 400/220 278 455 520.00 404.44 9-Feb-04 9:00 6 - -
4 400 KV Talaguppa 315 263 386 441.14 343.11 13-Aug-04 08:00 9 - -
400/220
315 264 387 442.29 344.00 13-Aug-04 08:00 9 - -
220 KV Stations
100 85 800 914.29 711.11 19-Jan-05 19:00 6
100 - - - - - - -
1 220KV Hoody 220/66/11 228 25
100 84 800 914.29 711.11 31-Mar-05 16:00 5
100 87 860 982.86 764.44 31-Mar-05 16:00 5
100 78 458 523.43 407.11 1-Nov-04 6:00 8 - -
2 220 KV Humnabad 220/110
100 72 432 493.71 384.00 9-Jan-04 19:00 9 - -
100 51.4 128 146.29 113.78 29-Dec-04 13:00 0 - -
3 220 KV Gulbarga/ Kapanoor 220/110
100 46 114 130.29 101.33 5-Mar-04 20:00 8 - -
100 48 125 142.86 111.11 15-Aug-04 8:00 4 125 24
4 220KV RS Sedum 220/110
100 41 105 120.00 93.33 16-Dec-04 6:00 4 - -
5 220 KV Alipura 1 x100 220/110 43 235 268.57 208.89 28-Aug-04 7.00 10 - -
6 220 KV Ittagi 1 x100 220/66 78.8 685 782.86 608.89 6-Nov-04 12.00 10 - -
100 68 167 190.86 148.44 28-Aug-04 7:00 22 - -
7 220 KV Raichur 220/110
100 68 167 190.86 148.44 28-Aug-04 7:00 22 - -
8 220 KV Lingasugur 1x100 220/110 36 113 129.14 100.44 12-Apr-04 19:00 6 - -
9 220 KV Kushtagi 1x100 220/110 75 204 233.14 181.33 22-Mar-04 19:00 6 - -
10 220 KV Lingapur Switching Station
100 68 220 251.43 195.56 31-Dec-04 19 11 - -
11 220 KV Munirabad 220/110
100 68 220 251.43 195.56 31-Dec-04 19 11 - -

Page 13 of 28
Station peak load

SL. Capacity Voltage Amps if Vg Amps if Tranf Capacitor


Name of the Station Time in ormer
NO in MVA Ratio MW Amps at Vg at Date
hours TAP
-
12.5% +12.5% No
Amps MVAR
100 77 210 240.00 186.67 29-May-04 20:00 6 - -
12 220KV RS Shahabad 220/110
100 72 382 436.57 339.56 29-Oct-04 12:00 6 - -
100 - -
13 220KV Hubli 100 220/110 168 500 571.428571 444.4444 17-Jan-04 19.00. 11 - -
100 - -
100 - -
14 220KV Gadag 220/110 60 180 205.714286 160 3-Mar-04 12.00. 9
100 - -
100 - -
15 220KV Narendra 220/110 112 280 320 248.8889 31-Mar-04 20.00. 8
100 - -
16 220KV Karwar 1x100 220/110 46 129 147.43 114.67 16-Sep-04 20.00. 4 - -
17 220KV Haveri 1x100 220/110 76 198 226.29 176.00 9-Dec-04 12.00. 10 - -
18 220KV Ranebennur 1x100 220/110 80 220 251.43 195.56 19-Nov-04 13.00. 2 -- 70
100 220KV Switching station (station Bypassed)
19 220 KV Sirsi 220/110
100
55 -- --
20 220 KV Ambewadi 220/110 94 234 267.428571 208 22-Aug-04 1.00. 5
55 -- --
100 -- --
21 220 KV Bagewadi 220/110 390 1170 1337.14286 1040 7-Mar-04 18.00. 14
100 -- --
100
22 220 KV Bagalkot 220/110 184 520 594.285714 462.2222 24-Mar-04 21.00. 11 130 -24
100
100 12
23 220 KV Mahalingapur 100 220/110 238 675 771.428571 600 4-May-04 21.00. 10 104 20
100 12
100 43 240 274.29 213.33 23-Jul-04 19.00. 5
24 220 KV Chikkodi 220/110 122 22.3
100 58 310 354.29 275.56 23-Jul-04 19.00. 7
100 55 320 365.71 284.44 19-Oct-04 19.00. 6
106 MNR
25 220 KV Belgaum 100 220/110 55 320 365.71 284.44 19-Oct-04 19.00. 6
1X50 Trf. Kept open from Aug .04 and is under repair
100 -- --
26 220 KV Antharasanahalli 220/66 140 409 467.428571 363.5556 28-Aug-04 11:00 9
100 -- --
100 -- --
27 220 KV Anchepalya 220/66 113 374 427.428571 332.4444 21-Aug-04 8:00 9
100 -- --
100 -- --
28 220 KV Kibbanahalli 220/110 171 494 564.571429 439.1111 23-Mar-05 0:00 10
Page 14 of 28
Station peak load

SL. Capacity Voltage Amps if Vg Amps if Tranf Capacitor


Name of the Station Time in ormer
NO in MVA Ratio MW Amps at Vg at Date
hours TAP
-
12.5% +12.5% No
Amps MVAR
28 220 KV Kibbanahalli 220/110 171 494 564.571429 439.1111 23-Mar-05 0:00 10
100 -- --
100 -- --
29 220 KV Madhugiri 220/66 97 282 322.285714 250.6667 19-Sep-04 0:00 9
100 -- --
100 83 227 259.43 201.78 23-Nov-04 12:00 8 -- --
100 83 277 316.57 246.22 23-Nov-04 12:00 8 -- --
30 220 KV Peenya 220/66
67.5 54 180 205.71 160.00 9-Nov-04 9:00 5 -- --
67.5 54 180 205.71 160.00 9-Nov-04 9:00 5 -- --
100 83 260 297.14 231.11 17-Feb-05 19:00 10 -- --
31 220 KV Hebbal 220/66
100 83 260 297.14 231.11 17-Feb-05 19:00 10 -- --
100 80 320 365.71 284.44 28-Mar-05 19:00 10 176 --
32 220 KV NRS 220/66
100 80 320 365.71 284.44 28-Mar-05 19:00 10 176 --
100 92 220 251.43 195.56 11-Oct-04 10:00 7 -- --
33 220 KV Yerandahalli 220/66
100 55.65 150 171.43 133.33 28-Apr-04 24:00 4 -- --
34 220 KV Bidadi 1x100 220/66 66 198 226.29 176.00 23-Apr-05 12:00 8 -- --
100 88 264 301.71 234.67 21-Apr-05 19:00 6 -- --
35 220 KV HSR Layout 220/66
100 64.5 193.5 221.14 172.00 10-Apr-05 2:00 8 -- --
100 82 246 281.14 218.67 24-Nov-05 14;00 9 -- --
36 220 KV Somanahalli 220/66
100 78 234 267.43 208.00 27-Nov-05 20:00 9 -- --
100 96 288 329.14 256.00 19-Jan-05 8:00 8 -- --
37 220 KV Subramanyapura 220/66
100 77 231 264.00 205.33 18-Nov-04 8:00 6 -- --
100 27 85 97.14 75.56 20-Feb-04 10:00 12
38 220 KV TK Halli 220/66 -- 22
100 64 155 177.14 137.78 20-Feb-04 10:00 11
100 -- --
39 220 KV DBPura 220/66 28 168 192 149.3333 6-Feb-05 10:00 9
100 -- --
40 220 KV DBPura I/A 1X50 220/66 60 210 240.00 186.67 23-Sep-04 23:00 10 -- --
100 -- --
41 220 KV Gowribidanur 220/66 12.75 38 43.4285714 33.77778 20-Jun-04 11:00 9
100 -- --
100 -- --
42 220 KV Chinthamani 220/66 122 308 352 273.7778 22-Jul-05 8:00 9
100 -- --
100 -- --
43 220 KV Kolar 220/66 150 419 478.857143 372.4444 25-Feb-05 8:00 10
100 -- --
100 -- --
44 220 KV Malur 220/66 149 411 469.714286 365.3333 1-Jul-04 8:00 9
100 -- --

Page 15 of 28
Station peak load

SL. Capacity Voltage Amps if Vg Amps if Tranf Capacitor


Name of the Station Time in ormer
NO in MVA Ratio MW Amps at Vg at Date
hours TAP
-
12.5% +12.5% No
Amps MVAR
100 8.8 528 603.43 469.33 7-Dec-04 19:00 -- -- --
45 220 KV Chitradurga 220/66
100 36 135 154.29 120.00 7-Mar-04 12.00 -- -- --
100 20.8 1248 1426.29 1109.33 21-Apr-04 0:00 -- -- --
46 220 KV Hiriyur 220/66
100 44 132 150.86 117.33 27-Mar-04 23.00 -- -- --
100 -- -- --
47 220 KV Davanagere 220/66 29.7 1782 2036.57143 1584 12-May-04 23:00
100 -- -- --
100 -- --
48 220 KV Honnali 220/66 64 210 240 186.6667 10-Dec-04 16:00 8
100 -- --
100 80 240 274.29 213.33 19 -- --
49 220 KV MRS Shimoga 100 220/110 66 210 240.00 186.67 13-Mar-05 19:00 11 -- --
100 80 240 274.29 213.33 19 -- --
100 74 216 246.86 192.00 -- -- --
50 220 KV Hootagalli 220/66 11-Jan-05 19:00
100 77 223 254.86 198.22 -- -- --
100 240 26
51 220 KV Kadakola 220/66 79 250 285.714286 222.2222 24-Mar-05 19:00 27
100 -- --
100 -- --
52 220 KV Hassan 220/66 149 447 510.857143 397.3333 16-Mar-05 20:00 18
100 -- --
100 46 150 171.43 133.33 16-Jan-05 19:00 7 -- --
53 22O KV Tubinakere 220/66
100 51 175 200.00 155.56 16-Jan-05 19:00 7 -- --
100 -- --
54 220 KV Chamarajanagar 220/66 91 365 417.142857 324.4444 18-Mar-05 20:00 --
100 -- --
100 52 155 177.14 137.78 29-Mar-05 20:00 4 - -22.1
55 220 KV Kavoor 100 220/110 52 155 177.14 137.78 29-Mar-05 20:00 4 - -22.1
100 64 190 217.14 168.89 29-Mar-05 20:00 8 - 5.3
56 220 KV Kemar 100 220/110 71 215 245.71 191.11 24-Jan-05 20:00 5 - -

Page 16 of 28
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Peak Load Details of down stream lines of 220 KV stations for the year 2004-05

Therma peak load


l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66KV Vokkaleri Line Coyote 12.35 292 10 110 2-Jun-04 8:00 125.71 97.78
66KV KGF Line Coyote 12.35 292 30 300 11-Jan-05 5:00 342.86 266.67
220KV 66 KV Bangarapet line Coyote 12.35 30 300 10-Oct-04 1:00 342.86 266.67
1 292
R/S Malur
66KV Masthi Line Coyote 12.35 292 20 220 2-Jun-04 24:00 251.43 195.56
66KV Malur MUSS Coyote 12.35 292 20 200 2-Aug-04 3:00 228.57 177.78
66KV Chintamani MUSS Coyote 12.35 292 36 300 28-Aug-04 18:00 342.86 266.67
66KV Talagawara Line Coyote 12.35 292 34 300 6-Feb-04 7:00 342.86 266.67
220KV
R/S 66KV Irgampalli Line Coyote 12.35 292 33 310 12-Aug-04 7:00 354.29 275.56
2
Chintaman 66KV Siddlaghatta Line Coyote 12.35 292 21 180 21-Jun-05 11:00 205.71 160.00
i 66KV Srinivasapura Line Coyote 12.35 292 32 296 15-Dec-04 21:00 338.29 263.11
66KV Yenigadale Line Coyote 12.35 292 15 140 29-Jun-04 12:00 160.00 124.44
66KV Kolar MUSS Drake 12.35 578 115 320 3-Mar-04 22:00 365.71 284.44
220KV 66KV Vemgal Line Coyote 12.35 292 25 250 26-Feb-05 13:00 285.71 222.22
3
R/S Kolar 66KV Mulbagal Line Coyote 12.35 292 37 370 3-Sep-04 1:00 422.86 328.89
66KV Srinivasapura Line Coyote 12.35 292 32 320 29-Jun-04 19:00 365.71 284.44
110KV Tiptur Lynx 34.08 361 46 310 22-Dec-04 18:00 354.29 275.56
220KV 110KV TuruveKere Lynx 34.08 361 40 240 4-Sep-04 16:00 274.29 213.33
4
K.B.Cross 110KV Gubbi Lynx 34.08 361 64 431 1-Feb-04 14:00 492.57 383.11
110KV C.N.Hally Lynx 34.08 361 35 175 30-Jan-05 16:00 200.00 155.56
66KV Wipro Coyote 12.35 292 1 10 -- 1:00 11.43 8.89
66KV Tumkur Coyote 12.35 292 19 205 30-Jan-05 8:00 234.29 182.22
66KV Korategere Coyote 12.35 292 -- -- -- -- -- --
220KV 66KV Hirehally Coyote 12.35 34 340 11-Feb-06 2:00 388.57 302.22
5 292
A.Hally
66KV Melekote - I Coyote 12.35 292 30 145 18-Oct-05 6:00 165.71 128.89
66KV Sira Coyote 12.35 292 50 350 4-Jan-05 15:00 400.00 311.11
66KV Kolala(B.C) Coyote 12.35 292 -- -- -- -- -- --
66KV Kunigal Coyote 12.35 292 20 210 16-Aug-04 10:00 240.00 186.67
66KV 66KV 1 Coyote 12.35 292 25 263 18-Jul-04 20:00 300.57 233.78
220KV 66KV 66KV 2 Coyote 12.35 292 29 305 27-Aug-04 24:00 348.57 271.11
6
A.Palya 66KV Huliyurdurga Coyote 12.35 292 24 252 13-Aug-04 24:01 288.00 224.00
66KV Amrutur Coyote 12.35 292 7 74 18-Mar-04 20:00 84.57 65.78
66KV T.G.Hally Coyote 12.35 292 26 270 25-May-04 12:00 308.57 240.00

Page 17 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66kV Bevinahally Coyote 12.35 292 4 40 15-Feb-05 1.00 45.71 35.56


66 kV P.R.Pura I Coyote 12.35 292 25 250 10-Mar-05 12.00 285.71 222.22
66kV Mathod -1 Coyote 12.35 292 20 200 6-Mar-05 1.00 228.57 177.78
220KV 66kV Thallak – Coyote 12.35 292 25 250 10-Mar-05 1.00 285.71 222.22
7
Hiriyur 66kV Mathod – 2 Coyote 12.35 292 18 180 7-Jul-05 15.00 205.71 160.00
66kV Sira Coyote 12.35 292 16 160 30-Jun-04 8.00 182.86 142.22
66kV Challakere Coyote 12.35 292 18 180 20-Jul-04 7.00 205.71 160.00
66kV PR Pura II Coyote 12.35 292 30 300 23-Mar-05 1.00 342.86 266.67
66kV Madhugiri MUSS Coyote 12.35 292 23 230 26-Apr-04 7:00 262.86 204.44
66KV Nitrahally Coyote 12.35 292 8 80 18-Apr-04 19:00 91.43 71.11
66KV Sira - I Coyote 12.35 292 18 180 23-Jun-04 10:00 205.71 160.00
66KV Sira - II Coyote 12.35 292 31 310 26-Apr-04 7:00 354.29 275.56
220KV 66KV Koratagere -I Coyote 12.35 20 200 22-Mar-04 18:00 228.57 177.78
8 292
Madhugiri
66KV Koratagere - II Coyote 12.35 292 17 170 26-Nov-04 16:00 194.29 151.11
66KV Midigeshi - I Coyote 12.35 292 15 150 25-Dec-04 2:00 171.43 133.33
66KV Midigeshi - II Coyote 12.35 292 28 280 19-Jan-04 16:00 320.00 248.89
66KV G.B.Nur Coyote 12.35 292 78 240 21-May-04 19:00 274.29 213.33
66KV I/A Feeder Coyote 12.35 292 -- -- -- -- -- --
66KV D'cross Line Coyote 12.35 292 -- -- -- -- -- --
220KV 66KV D.Hally - I Line Coyote 12.35 292 25 25 9-Oct-04 20:00 28.57 22.22
9 New R/S, 66KV D.Hally - II Line Coyote 12.35 292 26 240 22-Jul-04 9:00 274.29 213.33
D.B.Pura 66KV C.B.Pura Line Coyote 12.35 292 27 270 5-Jan-05 20:00 308.57 240.00
66KV Thondebhavi Line Coyote 12.35 292 -- -- -- -- -- --
66KV Vijajapura Line Coyote 12.35 292 21 240 10-Jun-04 24:00 274.29 213.33

Page 18 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66KV Link Line to KIADB Coyote 12.35 292 -- -- -- -- -- --


66KV Peresandra Line Coyote 12.35 292 22 220 30-Jun-04 5:00 251.43 195.56
66KV Kodigenahalli Line Coyote 12.35 292 18 180 15-Feb-05 7:00 205.71 160.00
Gowribida 66KV Madhugiri Line Coyote 12.35 -- -- -- -- -- --
10 292
nur
66KV Pavagada Line Coyote 12.35 292 18 180 24-Aug-04 8:00 205.71 160.00
66KV Bagepalli Line - I Coyote 12.35 292 26 260 29-Jun-04 7:00 297.14 231.11
66KV Bagepalli Line - II Coyote 12.35 292 19 180 29-Jun-04 7:00 205.71 160.00

220 KV
11 66 KVDevanahalli Coyote 12.35 292 -- -- -- -- -- --
DB
Pura I/A
66kV Sokke Coyote 12.35 292 37 370 7-Jul-04 14.00 422.86 328.89
66kV- Chitradurga 1 Coyote 12.35 292 22.3 223 17-Jan-05 11.00 254.86 198.22
66kV Chitradurga 2 Coyote 12.35 292 19.6 196 24-Jan-05 15.00 224.00 174.22
66kV Industrial Coyote 12.35 292 21.1 211 15-Mar-05 13.00 241.14 187.56
220 kV 66kV Harihar - Hospet Coyote 12.35 292 38 380 8-Jul-04 14.00 434.29 337.78
12 Davanage
re 66kV Shimoga Coyote 12.35 292 36 360 28-Oct-04 6.00 411.43 320.00
66kV Harapanahalli Coyote 12.35 292 25 250 17-Mar-05 7.00 285.71 222.22
66kV Bevinahalli Coyote 12.35 292 5 50 15-Feb-05 1.00 57.14 44.44
66kV Harapanahalli Coyote 12.35 292 25 250 17-Mar-05 7.00 285.71 222.22
66kV Davangere Old MUSS Coyote 12.35 292 33.6 336 29-Jan-05 14.00 384.00 298.67
66kV Challakere Coyote 12.35 292 20 210 8-Jun-04 16.00 240.00 186.67
220 kV 66kV Holalkere Coyote 12.35 292 46 400 11-Jul-04 23.00 457.14 355.56
13 Chitradurg
a 66kV Chitradurga Old MUSS Coyote 12.35 292 40 370 3-Aug-04 15.00 422.86 328.89
66kV Hiriyur Coyote 12.35 292 20 200 15-Jun-04 6.00 228.57 177.78
220 kV 66kV Malebennur Coyote 12.35 292 38 380 5-Mar-05 0:00 434.29 337.78
14
Honnali 66kV Shimoga Coyote 12.35 292 29 290 13-Mar-05 19:00 331.43 257.78
220 kV 66kV Ramnagara Coyote 12.35 292 38 380 27-Mar-05 22:00 434.29 337.78
15
Bidadi 66kV Toyota - I Coyote 12.35 292 4 40 26-Mar-05 9:00 45.71 35.56

Page 19 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

AAAC + Cu
220 kV 630 Sq mm 533 725 58.5 585 26-Sep-04 10:00 668.5714 520
16 HSR 66kV Audugodi - I UGC
AAAC + Cu
Layout 630 Sq mm
66kV Audugodi - II UGC
533 725 57 570 7-Sep-04 19:00 651.4286 506.67
66kV Kanakpura - I Coyote 12.35 292 25 250 29-Mar-05 7:00 285.71 222.22
66kV Kanakpura - II Coyote 12.35 292 28 280 11-Mar-05 14:00 320.00 248.89
66kV Bidadi Coyote 12.35 292 -- -- -- -- -- --
66kV Kumbalagodu Coyote 12.35 292 13 130 18-Mar-05 -- 148.57 115.56
220 kV 66kV Subramanyapura - I Coyote 12.35 292 30 300 29-Nov-04 8:00 342.86 266.67
17 Somanaha
lli 66kV Subramanyapura - II Coyote 12.35 292 24 240 6-Jul-04 10:00 274.29 213.33
66kV Harohally - I Coyote 12.35+
12.35 292 20 200 27-Sep-04 7:00 228.57 177.78
66kV Harohally - II Coyote
Coyote+ Cu Cu 240
12.35 292 10 100 27-Sep-04 1:00 114.29 88.89
12.35
240 Sq. mm Sq. mm +
66kV Jigani - I Coyote
UGC+ Cu Cu
UGC240 292 33 330 1-Jul-04 10:00 377.14 293.33
240 Sq. mm Sq. mm
66kV Jigani - II UGC
Double UGC 292 26 260 7-Feb-05 19:00 297.14 231.11
66kV REMCO - I Coyote
Double 12.35 584 56 560 23-Sep-04 8:00 640.00 497.78
66kV REMCO - II Coyote 12.35 584 38 380 14-Sep-04 19:00 434.29 337.78
66kV Sarakki - I Drake 12.35 578 35 350 22-Mar-05 20:00 400.00 311.11
66kV Sarakki - II Drake 12.35 578 35 350 22-Mar-05 20:00 400.00 311.11
220 kv
66kV Somanahally - I Coyote 12.35 292 -- -- -- -- -- --
18 Subraman
yapura 66kV Somanahally - II Coyote 12.35 292 -- -- -- -- -- --
Coyote +
Cu 630
66kV Padmanabhanagar 12.35 292 11.5 115 8-Feb-05 7:00 131.43 102.22
Sq. mm
UGC

Page 20 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

Deer +
66kV HAL - I 12.35 578 72 700 31-Mar-05 19:00 800.00 622.22
Drake

Deer +
66kV HAL - II 12.35 578 72 670 31-Mar-05 19:00 765.71 595.56
Drake
Deer +
66kV HAL - III 12.35 578 30 300 24-Mar-05 11:00 342.86 266.67
Coyote
220 kV
19
Hoody Coyote +
66kV ITI LYNX + 12.35 378 62 610 31-Dec-04 21:00 697.14 542.22
OWL
66kV Hoskote - I Coyote 12.35 292 30 300 4-Sep-04 11:00 342.86 266.67
66kV Hoskote - II Coyote 12.35 292 26 290 12-Apr-04 19:00 331.43 257.78
66kV Chandapura Coyote 12.35 292 18 180 18-Nov-04 14:00 205.71 160.00
66kV Graphite India Coyote 12.35 292 18 185 24-Apr-04 19:00 211.43 164.44
66kV Chandapura Coyote 12.35 292 30 300 14-Mar-05 12:00 342.86 266.67
66kV Jigani Coyote 12.35 292 28 225 15-Apr-04 10:00 257.14 200.00
220 kV 66kV Electronic City - I Coyote 12.35 292 29 290 23-Mar-05 14:00 331.43 257.78
20 Yarandana
hally 66kV Electronic City - II Coyote 12.35 292 29 290 23-Mar-05 14:00 331.43 257.78
66kV Anekal - I Coyote 12.35 292 12 120 3-Dec-04 17:00 137.14 106.67
66kV Anekal - II Coyote 12.35 292 10 100 3-Nov-04 15:00 114.29 88.89
66kV Brindavan Alloys Coyote 12.35 292 36.4 364 22-Feb-05 11:00 416.00 323.56
Coyote +
66kV T.G. Hally 12.35 292 44 440 22-Feb-05 12:00 502.86 391.11
Owl
Coyote +
66kV Nelamangala 12.35 292 40 400 3-Sep-04 8:00 457.14 355.56
Owl
Drake +
66kV NRS - I Coyote+C 12.35 292 24 240 10-Feb-05 8:00 274.29 213.33
Drake
opper
66kV NRS - II +OWL+C 12.35 292 12 120 3-Feb-05 8:00 137.14 106.67
opper+ 12.35
220 kV Drake
21 66kV Hebbal - I + 292 31 310 1-May-04 2:00 354.29 275.56
Peenya Coyote
12.35
Drake +
66kV Hebbal - II 12.35 292 36 360 23-Apr-04 19:00 411.43 320.00
Coyote
Patridge
66kV DG - I 12.35 292 26 260 16-Jan-05 15:00 297.14 231.11
+ Coyote
OWL +
66kV DG - II 12.35 292 27 270 1-Sep-05 12:00 308.57 240.00
Copper
66kV WAP - I (DG - 3) Coyote 12.35 292 36 360 1-Sep-04 12:00 411.43 320.00
Drake +
66kV WAP - II (DG - 4) 12.35 292 36 360 27-Aug-04 9:00 411.43 320.00
Coyote

Page 21 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

12.35
Coyote +
+
66kV ITI - I Lynx + 292 32 320 3-Mar-05 20:00 365.71 284.44
34.08
Owl
+ OWL
Coyote +
Lynx
66kV ITI - II +Owl+ 12.35 292 38 385 20-Jan-05 20:00 440.00 342.22
240
240 Sq.
Sq.
220 kV mm
mmUGC
UG
22 240 Sq.
Hebbal 66kV C - Station - I Cable 23.79 445 20 200 25-Mar-05 19:00 228.57 177.78
mm
240 UG
Sq.
66kV C - Station - II Cable
mm UG 23.79 445 21 205 19-Jul-04 13:00 234.29 182.22
66kV Tata Institute Cable 23.79 445 22 220 17-Dec-04 8:00 251.43 195.56
Coyote +
66kV Peenya - I 12.35 292 -- -- -- -- -- --
Drake
Coyote +
66kV Peenya - II 12.35 292 -- -- -- -- -- --
Drake
66kV Mysore Road - I Coyote 12.35 292 30 300 7-Jan-05 8:00 342.86 266.67
66kV Mysore Road - II Coyote 12.35 292 28 280 4-Feb-05 18:00 320.00 248.89
220 kV 66kV A Station - I 12.35 41 410 23-Nov-04 18:00 468.57 364.44
23 Lynx
240 Sq. 361
NRS
66kV Astation - II Lynx
mm UG 12.35 361 32 320 30-Dec-04 9:00 365.71 284.44
66kV Victoria Hospital Cable 23.79 445 29 290 30-Jul-04 19:00 331.43 257.78
220KV 110KV Belgaum link line Lynx 34.08 361 73 350 04-Apr-04 15.00. 400.00 311.11
24 R/S 110KV Ghataprabha Line Wolf 34.08 329 55 290 20-Apr-04 22.00. 331.43 257.78
Belgaum 110KV Hukkeri Line 267.43 208.00
Lynx 34.08 361 31 234 16-Jul-04 17.00.
110KV Sadalaga Lynx 34.08 361 22 132 17-May-04 21.00. 150.86 117.33
110KV Ankali Lynx 34.08 361 22 132 04-May-04 10.00. 150.86 117.33
220KV 110KV Chikodi Lynx 34.08 361 38 228 06-Mar-04 7.00. 260.57 202.67
25 R/S 110KV Nipani Lynx 34.08 361 16 96 05-Mar-04 21.00. 109.71 85.33
Chikodi 110KV Hukkeri Lynx 34.08 361 30 180 17-Mar-04 11.00. 205.71 160.00
110KV Raibag - I Lynx 34.08 361 60 360 23-Jun-04 1.00. 411.43 320.00
110KV Raibag - II Lynx 34.08 361 -- -- -- -- -- --
110KV Athani Lynx 34.08 361 49 330 28-Aug-04 16.00. 377.14 293.33
110KV Ugar Lynx 34.08 361 61 380 04-Sep-04 13.00. 434.29 337.78
110KV Mudhol Wolf 34.08 329 50 320 23-Jun-04 18.00. 365.71 284.44
220KV 110KV Terdal - Ugar Lynx 34.08 361 -- -- -- -- -- --
R/S
26 110KV Rabkavi - Athani Lynx 34.08 361 -- -- -- -- -- --
Mahalinga
pur 110KV Jamkhandi Lynx 34.08 361 32 200 17-Jul-04 10.00. 228.57 177.78
110KV Hidkal/Raibag* Lynx 34.08 361 40 260 22-Jun-04 11.00. 297.14 231.11
110KV Ghataprabha Lynx 34.08 361 342.86 266.67
52.5 300 24-Apr-04 13.00.
110KV Mudalagi - Kulgod Lynx 34.08 361 -- --

Page 22 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

110kV SIRSI - 1 (K'Koppa) Wolf 34.08 329 20 120 10-Sep-04 19.00. 137.14 106.67
110kV SIRSI - 2 Dog 34.08 254 18 110 19-Sep-04 12.00. 125.71 97.78
110kV AMBEWADI Lynx 34.08 361 --- --- -- -- -- --
220kV 110kV TARIHAL Lynx 34.08 361 48 290 03-Feb-04 2.00. 331.43 257.78
27 SRS -
HUBLI 110kV GOPANNAKOPPA Lynx 34.08 361 75 450 24-Jun-04 23.00. 514.29 400.00
110kV NAVALGUNDA Lynx 34.08 361 66 396 21-Aug-04 8.00. 452.57 352.00
110kV GADAG Lynx 34.08 361 32 190 17-Feb-04 20.00. 217.14 168.89
110kV SAVANUR Lynx 34.08 361 17 85 12-Mar-04 21.00. 97.14 75.56
110kV HUBLI Lynx 34.08 361 50 300 08-Mar-04 11.00. 342.86 266.67
220kV 110kV BELUR - 1 Lynx 34.08 361 9.5 57 19-Mar-04 14.00. 65.14 50.67
28 NAREND
RA 110kV BELUR - 2 Lynx 34.08 361 22 132 30-Mar-04 14.00. 150.86 117.33
110kV BELGAUM Lynx & 34.08 329 50 300 13-May-04 18.00. 342.86 266.67
110kV GADAG MUSS Wolf
Lynx 34.08 361 50 300 17-Feb-04 19.00. 342.86 266.67
110kV NAREGAL Lynx 34.08 361 16 100 26-Mar-04 22.00. 114.29 88.89
220kV 110kV MUNDARAGI 80.00 62.22
29 Lynx 34.08 361 12 70 01-Mar-04 2.00.
GADAG
110kV LAXMESHWAR-I Lynx 34.08 361 5 30 02-Mar-04 12.00. 34.29 26.67
110kV LAXMESHWAR-II Lynx 34.08 361 5 30 02-Mar-04 19.00. 34.29 26.67
110kv Haveri MUSS Lynx 34.08 361 33 172 19-Jul-04 10.00. 196.57 152.89
220kv 110kv Savanur Lynx 34.08 361 38 200 12-Mar-04 19.00. 228.57 177.78
30
Haveri 110kv Byadgi Lynx 34.08 361 - Load -- -- -- --
110 Kv Guttal Lynx 34.08 361 14 taken
74 01-Sep-04 11.00. 84.57 65.78
from
220 KV
RNR
Ranebenn 110kv Byadgi Lynx 34.08 361 48 300 29-Nov-04 13.00. 342.86 266.67
end
31 ur
Dog+Coy
110 KV NK - I 34.08 292 40 200 07-Dec-04 17.00. 228.57 177.78
ote
220 KV Dog+Coy
32 110 KV NK - II 34.08 292 36 180 20-Sep-04 19.00. 205.7143 160
Ambewadi ote
110 KV SA - I Lynx 34.08 361 52 260 25-Oct-04 11.00. 297.14 231.11
110 KV SA - II Lynx 34.08 361 51 255 28-Oct-04 13.00. 291.43 226.67
220KV
33 110KV Kumta Lynx 34.08 361 36.8 205 08-Dec-04 10.00. 234.2857 182.22
Karwar

Page 23 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

110KV Bagalkot - I Lynx 34.08 361 28 190 26-Mar-04 9.00. 217.14 168.89
110KV Bagalkot - II Lynx 34.08 361 32 210 26-Mar-04 10.00. 240.00 186.67
110KV Shahabad-I(Indi)
110KVShahabad-II(Sindagi Lynx 34.08 361 - 360 19-Aug-04 7.00. -- --
220KV + Moratagi)* Lynx 34.08 361 - - - - -- --
34 B.Bagewa 110KV Bijapur - I (City
di station)
110KV Bijapur-II (KIADB Lynx 34.08 361 -- 180 26-Dec-04 12.00. -- --
station) Lynx 34.08 361 32 230 24-Aug-04 10.00. 262.86 204.44
110KV Mamadapur - I Lynx 34.08 361 14 100 07-Feb-04 9.00. 114.29 88.89
110KV Mamadapur - II Lynx 34.08 361 28 140 01-Apr-04 6.00. 160.00 124.44
220KV 110KV Lokapur Lynx 34.08 361 65 400 05-Mar-04 19.00. 457.14 355.56
35 Bagalkot 110KV Kataraki-Bilagi Lynx 34.08 361 40 245 27-Mar-04 5.00. 280.00 217.78
110KV Kaladagi Lynx 34.08 361 42 262 28-Mar-04 23.00. 299.43 232.89
110 KV Kulashekara - I Lynx 34.08 361 33 200 2-Jun-04 18:00 228.57 177.78
110 KV Kulashekara - II Lynx 34.08 361 30 180 13-Oct-04 19:00 205.71 160.00
220 KV 110 KV S.K. line Lynx 34.08 361 34 205 30-Oct-04 11:00 234.29 182.22
36
Kavoor 110 KV Puttur Lynx 34.08 361 67 400 29-Mar-04 18:00 457.14 355.56
110 KV KIOCL 18 110 15-Aug-04 13:00 125.71 97.78
Lynx 34.08 361
110 KV Bantwala 26 155 3-Sep-04 20:00 177.14 137.78
110 KV Hiriyadka DOG 34.08 254 49 294 8-Apr-04 17:00 336.00 261.33
220 KV 110 KV Kavoor Lynx 34.08 361 35 200 31-Aug-04 16:00 228.57 177.78
37
Kemar 110 KV Gruvayanakere - I Lynx 34.08 361 14 84 10-Apr-04 15:00 96.00 74.67
110 KV Gruvayanakere - II Lynx 34.08 361 14 84 30-Apr-04 14:00 96.00 74.67
66 KV Doddaryapet - I Coyote 12.35 292 20 215 16-Apr-04 20:00 245.71 191.11
66 KV Doddaryapet - II Coyote 12.35 292 24 290 23-Mar-04 16:00 331.43 257.78
220 KV 66 KV Kollegala - I Coyote 12.35 292 10 90 8-Jul-04 16:00 102.86 80.00
38 C.R.
Nagara 66 KV Kollegala - II Coyote 12.35 292 10 90 13-Nov-04 18:00 102.86 80.00
66 KV Gundulpet - I Coyote 12.35 292 22 220 17-Mar-04 19:00 251.43 195.56
66 KV Gundulpet - II Coyote 12.35 292 22 220 17-Mar-04 19:00 251.43 195.56
66 KV Santhesaragur - I Coyote 12.35 292 13 120 10-Aug-04 14:00 137.14 106.67
66 KV Santhesaragur - II Coyote 12.35 292 13 120 10-Aug-04 14:00 137.14 106.67
66 KV Nanjangud - I Coyote 12.35 292 30 300 26-Mar-04 20:00 342.86 266.67
220 KV 66 KV Nanjangud - II Coyote 12.35 292 17 170 25-Aug-04 18:00 194.29 151.11
39
Kadakola 66 KV Mysore South Coyote 12.35 292 23 242 24-Mar-04 19:00 276.57 215.11
66 KV R.K. Nagara Coyote 12.35 292 11 120 28-Jan-04 19:00 137.14 106.67
66 KV D.K. Maidana Coyote 12.35 292 14 140 11-Feb-04 19:00 160.00 124.44
66 KV Devnoor (Nanjangud) Coyote 12.35 292 14 140 18-Jul-04 11:00 160.00 124.44

Page 24 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66 KV Hassan Coyote 12.35 292 29 219 18-Mar-04 17:00 250.29 194.67


66 KV Sakaleshapura Coyote 12.35 292 6 60 7-Mar-04 20:00 68.57 53.33
66 KV H.N. Pura Coyote 12.35 292 26 260 7-Mar-04 17:00 297.14 231.11
220 KV 457.14 355.56
40 66 KV C.R. Patana - I Coyote 12.35 292 40 400 25-Jun-04 16:00
Hassan
66 KV C.R. Patana - II Coyote 12.35 292 29 290 5-Mar-04 13:00 331.43 257.78
66 KV Belur Coyote 12.35 292 40 400 13-Dec-04 19:00 457.14 355.56
66 KV Arakalgud Coyote 12.35 292 10 100 7-Mar-04 20:00 114.29 88.89
110 KV Bhadravathi - I Lynx 34.08 361 19 114 21-Dec-04 20:00 130.29 101.33
110 KV Bhadravathi - II Lynx 34.08 361 19 114 21-Dec-04 20:00 130.29 101.33
110 KV Bhadravathi - III Lynx 34.08 361 20 120 16-Feb-04 19:00 137.14 106.67
110 KV SBT- II Lynx 34.08 361 62 372 25-Feb-04 17:00 425.14 330.67
110 KV Mysore Lynx 34.08 361 18 108 6-Dec-04 02:00 123.43 96.00
220 KV 110 KV South Canara Mooose 45.45 687 36 216 22-Jun-04 15:00 246.86 192.00
41 MRS 110 KV LST - III Lynx 34.08 361 32 160 5-Apr-04 10:00 182.86 142.22
Shimoga 110 KV LST - IV Lynx 34.08 361 30 150 5-Apr-04 10:00 171.43 133.33
110 KV MPM Lynx 34.08 361 20 120 4-May-04 23:00 137.14 106.67
66 KV Bhadra - I Copper 12.35 292 9.2 95 2-Apr-04 20:00 108.57 84.44
66 KV Bhadra - II Copper 12.35 292 9.2 95 2-Apr-04 20:00 108.57 84.44
66 KV DVG - I Copper 12.35 292 29 219 22-Jul-04 09:00 250.29 194.67
66 KV DVG - II Copper 12.35 292 28 280 29-Dec-04 08:00 320.00 248.89
66 KV Pandavapura Coyote 12.35 292 36 364 21-Jun-04 10:00 416.00 323.56
66 KV Nagamangala - I Coyote 12.35 292 12 120 21-Mar-04 17:00 137.14 106.67
220 KV 66 KV Nagamangala - II Coyote 12.35 292 16 160 3-Jan-04 18:00 182.86 142.22
42 Tubinaker
e 66 KV S.R. Patana Coyote 12.35 292 31 312 11-Mar-04 20:00 356.57 277.33
66 KV Arakere Coyote 12.35 292 4 55 7-Feb-04 18:00 62.86 48.89
66 KV Mandya Coyote 12.35 292 27 280 16-Jan-04 19:00 320.00 248.89
66 KV FTS - I Coyote 12.35 292 34.5 374 23-Aug-04 08:00 427.43 332.44
66 KV FTS - II Coyote 12.35 292 32.8 295 15-Mar-04 11:00 337.14 262.22
66 KV BARC - I Coyote 12.35 292 2.6 26 4-Aug-04 20:00 29.71 23.11
66 KV BARC - II Coyote 12.35 292 4.2 47 15-Jan-04 13:00 53.71 41.78
66 KV Hunsur Coyote 12.35 292 38.2 365 23-Feb-04 19:00 417.14 324.44
66 KV BEML + AXLE Coyote 12.35 292 6.5 67 1-Apr-04 18:00 76.57 59.56
220 KV
43 66 KV K.R. Nagara Coyote 12.35 292 40.3 361 27-Jan-04 19:00 412.57 320.89
Hootagally
66 KV R.K. Nagara Coyote 12.35 292 8.6 85 25-Oct-04 07:00 97.14 75.56
66 KV Mysore South Coyote 12.35 292 14.8 156 11-Jan-04 18:00 178.29 138.67
110 KV MCF Copper 12.35 292 12.4 116 30-Jan-04 21:00 132.57 103.11
110 KV H.N. Pura Copper 12.35 292 29.4 154 15-Apr-04 20:00 176.00 136.89
66 KV Vikaranth Coyote 12.35 292 29.5 295 16-Jul-04 16:00 337.14 262.22
66 KV RBI Coyote 12.35 292 3.2 32 3-Jul-04 09:00 36.57 28.44

Page 25 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66 KV BWSSB - I Drake 12.35 578 4 40 14-Apr-04 13:00 45.71 35.56


66 KV BWSSB - II Drake 12.35 578 18 165 23-Feb-04 23:00 188.57 146.67
66 KV BWSSB - III Drake 12.35 578 5 50 2-Apr-04 06:00 57.14 44.44
66 KV Akkurmole Coyote 12.35 292 16 165 13-Jan-04 13:00 188.57 146.67
66 KV Mandya - I Coyote 12.35 292 24 250 24-Jun-04 09:00 285.71 222.22
220 KV 66 KV Mandya - II Coyote 12.35 292 27 250 22-May-04 12:00 285.71 222.22
44
T.K. Hally 66 KV Shimsha - I Coyote 12.35 292 25.2 225 7-Nov-04 10:00 257.14 200.00
66 KV Shimsha - II Coyote 12.35 292 24 200 5-Oct-04 09:00 228.57 177.78
66 KV Harohalli - I Coyote 12.35 292 - - - - -- --
66 KV Harohalli - II Coyote 12.35 292 - - - - -- --
66 KV Somanahally - I Coyote 12.35 292 - - - - -- --
66 KV Somanahally - II Coyote 12.35 292 - - - - -- --
110 kV Manna-E-Khellki Lynx 34.08 361 15.6 98.4 02-Sep-04 8:00 112.46 87.47
220 kV 110 kV Humnabad Lynx 34.08 361 32.4 197 12-Dec-04 9:00 225.14 175.11
45 Humnaba 110 kV Bhalki Lynx 34.08 361 35.4 201 24-Dec-04 20:00 229.71 178.67
d 110 kV Mahagaon Maragutti Wolf 34.08 15.2 94 04-Mar-04 7:00 107.43 83.56
110 kV Bidar-I (Chidri) Lynx 34.08 361 28.8 154 24-Sep-04 6:00 176.00 136.89
110kV Kapanoor Lynx 34.08 361 3.8 19 03-Jan-05 13:00 21.71 16.89
110kV Gulbarga North-I Wolf 34.08 24 120 04-Mar-05 19:00 137.14 106.67
220 kV
46
Kapanoor 110kV Gulbarga North-II Lynx 34.08 361 29.2 146 21-Jan-05 19:00 166.86 129.78
110kV Yadgir Wolf 34.08 32.8 167 27-Jan-05 6:00 190.86 148.44
110kV Aland Lynx 34.08 361 13.6 68 03-Jan-05 16:00 77.71 60.44
Rajshree Cements (EHT) 06-Jun-04 7:00 141.49 110.04
47 Sedam Lynx 34.08 361 23.8 123.8
Chincholi -- -- -- --
110 KV Gulbarga I Lynx 34.08 361 22.2 133 29-May-04 21:00 152.00 118.22
110 KV Gulbarga III Lynx 34.08 361 22.6 123 10-Jul-04 21:00 140.57 109.33
48 Shahabad
110 KV Raichur I Patridge 34.08 361 25.1 133 06-Feb-05 20:00 152.00 118.22
110 KV Baswan Bagewadi I Lynx 34.08 361 18.1 122 11-Jan-05 8:00 139.43 108.44
110 kV Munirabad Lynx 34.08 361 32 190 14-Dec-04 19.00 217.14 168.89
220 kV
49 110 kV Bellary (N) Lynx 34.08 361 21 160 3-Apr-04 19.00 182.86 142.22
Alipur
110 kV Bellary (S) Lynx 34.08 361 18 120 5-Feb-05 19.00 137.14 106.67
110 kV Sindanoor I Lynx 40 276 4-Apr-04 10.00 315.43 245.33
34.08 361
111 kV Sindanoor II Lynx 42 244.5 15-Aug-04 16.00 279.43 217.33
110 kV Koppal Lynx 34.08 361 29 180 26-Jan-05 7.00 205.71 160.00
110 kV Vyasanakere -
Lynx 34.08 361 - - - - -- --
220 kV Donimalli I
50
Munirabad 110 kV Vyasanakere -
Coyote 12.35 292 10.66 33 6-Jan-05 8.00 37.71 29.33
Donimalli II
66 kV MSD Lynx 12.35 361 24 200 25-Feb-05 8.00 228.57 177.78
66 kV MHD Coyote 12.35 286 10.8 130 11-Dec-04 14.00 148.57 115.56

Page 26 of 28
Therma peak load
220 kV l
50 Name of Type of Amps if
Sl. Munirabad Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66 kV T.B.Dam tie line Patridge 12.35 361 9 75 12-Apr-04 11.00 85.71 66.67

Page 27 of 28
Therma peak load
l
Name of Type of Amps if
Sl. Capacit Amps if Vg
the Name of the line conducto SIL Vg at
No. y of the at +12.5%
Station r Time in -12.5%
Line in MW Amps Date
Amps * hours

66 kV Hadagali Coyote 12.35 292 17.4 151 23-Mar-04 18.00 172.57 134.22
220 kV 66 kV T.B.Halli Coyote 12.35 292 14.3 124 26-Feb-05 7.00 141.71 110.22
51
Ittigi 66 kV H.B.Halli Coyote 12.35 292 17.5 152 9-Mar-04 14.00 173.71 135.11
66 kV Kudligi II Coyote 12.35 292 26.3 229 27-Mar-05 15.00 261.71 203.56
110 kV ilkal Lynx 34.08 361 21.4 128.4 22-Mar-04 19:00 146.74 114.13
220 kV 110 kV Yelburga Lynx 34.08 361 23.1 138.6 1-Mar-04 2:00 158.40 123.20
52
Kushtagi
110 kV Gajendragad Lynx 34.08 361 16 96 18-Dec-04 12:00 109.71 85.33
110 kV Shahabad 1
Patridge 34.08 361 19.5 122 22-Jul-04 11:00 139.43 108.44
(Devdurga)

110 kV Shahabad 2 (Yadgir) Lynx 34.08 361 33 200 29-Oct-04 6:00 228.57 177.78
220 kV
53 110 kV Sindhnoor 1 Patridge 34.08 361 31 187 -- -- 213.71 166.22
Raichur
110 kV Sindhnoor 2 Lynx 34.08 361 29.6 186 2-Sep-04 18:00 212.57 165.33
110 kV APMC Raichur 1 Patridge 34.08 361 -- -- -- -- -- --
110 kV APMC Raichur 2 Lynx 34.08 361 361 15.6 25-Oct-04 13:00 17.83 13.87

220 kV
54 Lingasugu 110 kV Hatti Lynx 34.08 361 14.5 94 23-Nov-04 18:00 107.43 83.56
r

Page 28 of 28