Вы находитесь на странице: 1из 29

CCNA v4 - E4 - Module 2 (100%)

Post by: Admin at 12:16 AM


Lables:CCN A 4, CCNA4 Chapter 2
1. Refer to the exhibit. What can be concluded about the function of the
Serial 0/0/0
interface on the router after the commands are entered?
The serial link will be closed if the number of received packets at the
destination node falls below 90
percent of the packets that are sent.

2. Refer to the exhibit. While troubleshooting a serial interface, a


technician enters the
command show interface serial 0/0/0 . If the interface is in DCE mode,
what two problems are likely
to cause the indicated problem? (Choose two.)

The remote CSU or DSU has failed.


A timing problem has occurred on the cable.
3. Refer to the exhibit. What statement is true regarding the output
shown?
The PAP passwords did not match, so the routers are trying CHAP
authentication.
4. Why are serial connections preferred over parallel connections for long
transmission lengths?
Parallel connections are subject to clock skew and to crosstalk between
wires.
5. Which two statements are true about time-division multiplexing
(TDM)? (Choose two.)
Multiple sources can transmit over a single channel.
Original data streams must be reconstructed at the destination.
6. Which authentication protocol can be spoofed to allow playback
attacks?
PAP

7. What function do Network Control Protocols provide for a PPP

connection?

to allow multiple Layer 3 protocols to operate over the same physical link
8. Refer to the exhibit. Router R1, the DCE device, has just been

configured for PPP encapsulation

with authentication. What series of commands will allow another router,


the DTE device, to
communicate over its serial 0/0/0 interface to router R1?

Router(config)# hostname R3
R3(config)# username R1 password Cisco
R3(config)# interface Serial 0/0/0
R3(config-if)# encapsulation ppp

R3(config-if)# ip address 172.16.3.3 255.255.255.0

R3(config-if)# ppp authentication chap

9. What advantage does PPP have over HDLC for serial

communications?

It supports authentication

10. Which PPP configuration option can be used to establish load

balancing over the interfaces of a

router?

multilink

11. Which three statements are correct about HDLC encapsulation?


(Choose three.)

HDLC implementation in Cisco routers is proprietary.

HDLC is the default serial interface encapsulation on Cisco routers.


HDLC uses frame delimiters to mark the beginnings and ends of frames

12
.
Refer to the exhibit
.
Router R1 is not able to communicate with a neighbor router that is
directly

connected to serial 0/0/0. What is the reason for this?

The interface has been administratively shutdown with the shutdown

command.

13. Refer to the exhibit. What statement is true regarding the output

shown?

Data is able to flow across this link.

14.
Which serial communications DTE/DCE interface standard is used to
provide high-speed connectivity
of up to 52 Mbps between LANs and is found on many high-end Cisco
routers?
EIA/TIA-612/613 (HSSI)

15. What does the demarcation point represent in data communication

physical circuits?
physical point at which the public network ends and the private customer

network begins

16. Which three statements are true regarding LCP? (Choose three.)

It is responsible for negotiating link establishment.

It terminates the link upon user request or the expiration of an inactivity


timer.

It can test the link to determine if link quality is sufficient to bring up

the link.

17. Refer to the exhibit. Which two statements are true regarding the

output shown? (Choose two.)

The router has agreed on IP parameters.

The router has negotiated LCP successfully.

18. Refer to the exhibit. Which statement is true about PPP operation?

Both the link-establishment and network-layer phase completed

successfully.
19. Which three statements correctly describe PPP authentication?

(Choose three.)

PAP sends passwords in clear text.

CHAP uses a challenge/response that is based on the MD5 hash


algorithm.
CHAP uses repeated challenges for verification.
20. Which two options can LCP negotiate? (Choose two.)
link quality
authentication
21. Refer to the exhibit. On the basis of the show interface Serial0/0
output, how many NCP session
1What is the purpose of SNMP?
to facilitate the exchange of information between devices and the NMS

to monitor and control IP address allocation in a network


to report user login to a monitoring station
to verify traffic throughout the network and keep a log of all activity
2What is the purpose of system-level acceptance testing?
to develop an installation plan for the newly designed network
to train end users and support personnel on the newly installed network
to check that the newly installed network meets the business goals and
design requirements
to justify the financial investment required to implement the technology
change

3When should a network baseline be performed within the stages of the


Cisco Lifecycle Services?

Prepare Phase
Plan Phase
Design Phase
Implement Phase
Operate Phase

4What is a business constraint that may impact the WAN design of a


company?

company policy regarding specific operating systems on LAN devices


current monitoring protocols implemented on end-user devices
non-availability of end users during implementation

company policy requiring the use of specific vendor networking equipment

due to partnerships

5A corporation (client) wants a network upgrade and is putting out a


request for services to various network consulting companies
(contractors). Which statement is true concerning the required RFQ?
sent from the contractors to the client in response to a RFP
sent from the client to the contractors along with the RFP to provide more
specific technical
details
sent from the client to the contractors in place of a RFP when the
technical
specifications of a project are known
sent from the contractors to the client outlining reasons for financial
investments for the
network upgrade

6Which two statements best describe the responsibilities of an account


manager? (Choose two.)
acts as the primary point of contact between the company and the client
directs the sales teams and support personnel

provides technical support to critical clients


selects the equipment and technologies to be used for the client solution
acts as the network design lead

.Why is it important to prioritize business goals when developing network


design?

to ensure that the least expensive technologies are implemented first


to simplify the configuration, administration, and monitoring of the newly
installed network
to anticipate the effects of changes and growth of the business

to adhere to the best opportunities to contribute to the success of the


business
8Which two statements are true regarding the response to an RFQ?
(Choose
two.)
The response should be brief.
It should strictly conform to the formatting requirements specified by the
RFQ.
Only the items that the contracting company will be addressing should be
answered.
The response helps the customer compare pricing with other potential
contractors.
The response is more complicated than a response to an RFP.
9A network engineer working for a contracting company is informed of a
pre-
bid meeting with a potential client. What purpose does the network
engineer
have for attending the pre-bid meeting?

to submit request for proposal responses


to discuss proposed installation and monitoring plans
to perform system-level acceptance tests on the current network

to clarify project scope and timelines not included in the original request
for
7.Why is it important to prioritize business goals when developing
network
design?

to ensure that the least expensive technologies are implemented first


to simplify the configuration, administration, and monitoring of the newly
installed network
to anticipate the effects of changes and growth of the business

to adhere to the best opportunities to contribute to the success of the


business
8Which two statements are true regarding the response to an RFQ?
(Choose
two.)
The response should be brief.
It should strictly conform to the formatting requirements specified by the
RFQ.
Only the items that the contracting company will be addressing should be
answered.
The response helps the customer compare pricing with other potential
contractors.
The response is more complicated than a response to an RFP.
9A network engineer working for a contracting company is informed of a
pre-
bid meeting with a potential client. What purpose does the network
engineer
have for attending the pre-bid meeting?

to submit request for proposal responses


to discuss proposed installation and monitoring plans
to perform system-level acceptance tests on the current network

to clarify project scope and timelines not included in the original request
for
proposal
to create a business case outlining reasons for financial investment in a
network upgrade
10
What is a purpose of establishing a network baseline?
It provides a statistical average for network performance.
It manages the performance of network devices.
It creates a point of reference for future network evaluations.
It checks the security configuration of network devices.
11
Which two items help identify business goals and priorities before a new
network project starts? (Choose two.)
installation
motivation
profitability
trustworthiness
customer satisfaction
12

A network engineer is analyzing the network of a potential client


company to identify problems and determine whether a network upgrade
or addition is needed. Which role in the sales team is this engineer
assuming?

post-sales field engineer


pre-sales engineer

account manager
network designer
13
What are two benefits of using a top-down approach instead of a bottom-
up
approach to network design? (Choose two.)
incorporates organizational requirements
allows for a quick response to a design request
requires less time up front to create a network design
clarifies design goals from the perspective of applications and network
solutions
facilitates a design by using devices and technologies that are based on
previous experience
14
In a network management architecture, which statement best describes a
management agent?

standardized database storing network performance parameters


communication protocol used between a management station and
managed device
host with the management application loaded that is used by the
administrator to monitor

and configure network devices


software running on a managed device to collect network information and
account manager
network designer
13
What are two benefits of using a top-down approach instead of a bottom-
up
approach to network design? (Choose two.)
incorporates organizational requirements
allows for a quick response to a design request
requires less time up front to create a network design
clarifies design goals from the perspective of applications and network
solutions
facilitates a design by using devices and technologies that are based on
previous experience
14
In a network management architecture, which statement best describes a
management agent?
standardized database storing network performance parameters
communication protocol used between a management station and
managed device
host with the management application loaded that is used by the
administrator to monitor

and configure network devices


software running on a managed device to collect network information and
allow that device to be managed by a management station
15

Which stage of the Cisco Lifecycle Services strategy is usually completed


before an organization issues a Request For Proposal (RFP) or Request
For
Quotation (RFQ)?

Prepare Phase

Plan Phase
Design Phase
Implement Phase
Operate Phase
Optimize Phase

16

A major corporation has decided to hire someone to upgrade their


network
infrastructure. A network consulting company wants the job. What
document
must the network consulting company obtain to learn about the business
goals, the project scope, the requirements for the new network and the
expected deliverables?

Business Case
Project Plan
Request for Proposal
Request for Comments
17

During an evaluation of the currently installed network, the IT staff


performs
a gap analysis to determine whether the existing network infrastructure
can
support the desired new features. At which stage of the Cisco Lifecycle
Services approach does this activity occur?

Implement Phase
Operate Phase
Optimize Phase

18
What is the purpose of creating a prioritized list of technical
requirements?
defines the project scope

determines the business profitability


creates a feasibility report for analysis
identifies existing and new user groups

19
What is the purpose of preparing a business case?
to justify the financial investment in implementing the technology change

to provide an example of a previous job done in the RFP


to define the technical requirements of the network
to define timelines and critical milestones

20
Which stage of the Cisco Lifecycle Services involves proactive
management to
identify and resolve issues before the organization is affected?

Prepare Phase
Plan Phase
Design Phase
Implement Phase
Operate Phase

Optimize Phase
21
Which software component is installed on network devices that are
managed
through SNMP?
management agents
management stations
network management protocol
Management Information Base (MIB)

22

A network engineer working for ABC company is writing a response to


an RFP
for a network upgrade and must create an executive summary. Which
statement describes the basic components of an executive summary?

quick overview of the problem, the recommended solution, and the


justification for ABC
company doing the job
detailed description of the solution, including but not limited to,
timelines, turn-over
schedule, warranty information, and emergency recovery information
detailed description of costs including, the cost of software and hardware
components,
licensing requirements, labor cost, and other applicable fees
multiple page document containing additional information such as
detailed lists of
equipment required, diagrams, company background information, and
insurance coverag
(1) Not At All Enthusiastic (2) Slightly Enthusiastic
(3) Enthusiastic
(4) Very

Enthusiastic (5) Completely Enthusiastic


In your opinion (this has no bearing on your grade), please indicate how
enthusiastic you are about
the content of this course and the things you’re learning (or have learned):
24
(1) Not At All Interested
(2) Slightly Interested (3) Interested (4) Very Interested (5)

Completely Interested

In your opinion (this has no bearing on your grade), please indicate your

interest in this course:

25
(1) Not At All Motivated
(2) Slightly Motivated
(3) Motivated (4) Very Motivated
(5) Completely Motivated
In your opinion (this has no bearing on your grade), please rate your
motivation to do well in this

Вам также может понравиться