Вы находитесь на странице: 1из 56

Second Party

Site Name: DLF NCR 1

Vinay Yadav,
DLF NCR 1 Security
02 30 Jan 2019 Deepak Rai & Col Arun Sindhwani
Audit Report
Sanjay Dixit
Rev Date Details Drafted by Reviewed & Issued by
DLF NCR 1 Security Audit Report

Confidential Page 1 of 55

Contents
1. Background ......................................................................................................... 3
2. Objective ............................................................................................................. 3
3. Scope ................................................................................................................... 3
4. Audit Team.......................................................................................................... 3
5. Executive Summary .......................................................................................... 4
6. DLF Gateway Tower .......................................................................................... 4
6.1 Good Practices ................................................................................................ 4
6.2 Audit Observations Detail ............................................................................. 4
6.3 Alignment with Compendium of SOP .......................................................... 8
7. DLF Building -14 ............................................................................................... 8
7.1 Good Practices ................................................................................................ 8
7.2 Audit Observations Detail ............................................................................. 8
7.3 Alignment with Compendium of SOP ........................................................ 11
8. DLF Building -6 ................................................................................................. 11
8.1 Good Practices .............................................................................................. 11
8.2 Audit Observations Detail ........................................................................... 11
8.3 Alignment with Compendium of SOP ........................................................ 14
9. DLF Building – 9A & B ..................................................................................... 15
9.1 Good Practices .............................................................................................. 15
9.2 Audit Observations Detail ........................................................................... 15
9.3 Alignment with Compendium of SOP ........................................................ 18
10. DLF Building -7 A&B ........................................................................................ 18
10.1 Good Practices ........................................................................................... 18
10.2 Audit Observations Detail ........................................................................ 19
10.3 Alignment with Compendium of SOP .................................................... 24
11. DLF Building -10 .............................................................................................. 24
11.1 Good Practices ........................................................................................... 24
11.2 Audit Observations Detail ........................................................................ 25
11.3 Alignment with Compendium of SOP .................................................... 30
12. DLF Building -Infinity ...................................................................................... 30
12.1 Good Practices ........................................................................................... 30
12.2 Audit Observations Detail ........................................................................ 30
12.3 Alignment with Compendium of SOP .................................................... 33
13. DLF Building - 8 ............................................................................................... 34
13.1 Good Practices ........................................................................................... 34

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 2 of 55

13.2 Audit Observations Detail ........................................................................ 34


13.3 Alignment with Compendium of SOP .................................................... 37
14. DLF Building -5 ................................................................................................. 37
14.1 Good Practices ........................................................................................... 37
14.2 Audit Observations Detail ........................................................................ 37
14.3 Alignment with Compendium of SOP .................................................... 40
15. DLF Building -Cyber Green............................................................................. 40
15.1 Good Practices ........................................................................................... 41
15.2 Audit Observations Detail ........................................................................ 41
15.3 Alignment with Compendium of SOP .................................................... 44
16. DLF Cyber Hub ................................................................................................. 44
16.1 Good Practices ........................................................................................... 44
16.2 Audit Observations Detail ........................................................................ 44
16.3 Alignment with Compendium of SOP .................................................... 47
17. DLF Centre ........................................................................................................ 48
17.1 Good Practices ........................................................................................... 48
17.2 Audit Observations Detail ........................................................................ 48
17.3 Alignment with Compendium of SOP .................................................... 51
18. DLF IT Park Chandigarh .................................................................................. 52
18.1 Good Practices ........................................................................................... 52
18.2 Audit Observations Detail ........................................................................ 52
18.3 Alignment with Compendium of SOP .................................................... 55

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 3 of 55

1. Background
The DLF NCR 1 offices/buildings site security audit was carried out between
30 Nov 2018 – 14 Jan 2019 as per the guidelines provided in compendium
of SOP and based on training given in security symposium. In addition,
security audit question bank was used for the conduct of audit.

As the owner of the audit report, you are requested to develop an action
plan indicating response and follow up actions on each recommendation
made in the report. Among other things, this action plan should include time
lines for completion of each action and the name of the designated individual
responsible for it. While the status of the action plans would be reviewed
by you as frequently as necessary, you are required to submit quarterly
status reports to the central team. This shall continue until all
recommendations made in the audit report have been satisfactorily
addressed/ completed.

2. Objective
The audit was carried out with the objective of reviewing the design and
operating effectiveness on existing security controls being followed at site.

3. Scope
The audit scope covered but not be restricted to:
I. Security Infra & Management Framework
II. Detection and surveillance capability
III. Access control
IV. Security Incidents Management Capability
V. Material Security
VI. Security Training
VII. Security assessment information & Records

4. Audit Team
Audit Team Leader: Col Arun Sindhwani

Audit Team Member 1: Vinay Yadav

Audit Team Member 2: Deepak Rai

Audit Team Member 3: Kamal Rana

Audit Team Member 4: Mukesh Dhusia

Audit Team Member 5: Sanjay Dixit

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 4 of 55

5. Executive Summary

Observations made during the audit with respect to the strengths of systems
and their implementation as well as opportunities that exist for improvement
have been summarized in succeeding paragraphs building wise.

Site Management: DLF NCR 1 site management took the security audit as
an opportunity to improve the existing security system. Management not
only provided administrative support to audit team members but also
contributed actively during audit period. At times, security audit team felt
overwhelmed by seeing the contribution from management.

A comprehensive Security process evaluation using First/ Second Party Site


Security Audit question list was done to identify strengths and opportunities
for improvement.

6. DLF Gateway Tower

DLF Gateway Tower security audit was carried out on 21 Dec 2018.

6.1 Good Practices:

The following can be considered as good practices:

I. Visitor Management System


II. Functionality of CCTV room
III. Functional Access Control system (ACS) installation
IV. Turn-Out and Grooming of Protection force personnel
V. Alarm system installed at terrace door
VI. Panic button installed at all Atrium and In & Out main entry gates
VII. Overall security infrastructure is in good shape
VIII. Adequate CCTV coverage of building periphery
IX. RFID system for vehicular movement in basement
X. Bag screening at atrium by use of X-ray baggage machine

6.2 Audit Observations Detail

Findings/Observation no 1: Employees are being allowed entry through open


ground floor fire door used as material gate located adjacent to main exit
gate.

Compendium of SOP deviation: SOP No.61, Responsibilities of security guard


at material loading/unloading point and SOP No. 55, Responsibilities of
Security Officer.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 5 of 55

Recommendation: Security officer (SO) of the building shall ensure that


employees’ entry inside the building be routed through atrium only after
security screening.

Findings/Observation no 2: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 3: Bags of employees/vendors/ entering through


open fire exit door on main vehicle entry point side are being not checked.

Compendium of SOP deviation: SOP No.61 Responsibilities of security guard


at material loading/unloading point and SOP No. 55 Responsibilities of
Security Officer.

Recommendation: SO to ensure that employees /visitors entry inside the


building be routed through atrium for entry only after security screening.
Secondary access points should be stringently monitored for unauthorized
entry.

Findings/Observation no 4: Boundary wall/grill adjacent to Rapid Metro


station/Dhaba (eatery points) is not as per ideal security infrastructure
standard.

Compendium of SOP deviation: SOP No.4, Security infrastructure and access


control- Design basis

Recommendation: Consider raising height of existing boundary wall/grill at


least up 10 feet and put ball stopping fence towards Dhaba side.

Findings/Observation no 5: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 6 of 55

Findings/Observation no 6: Duplicate copy of invoice/challan of material


movement is being not kept with security for record.

Compendium of SOP deviation: SOP 25, Material/Assets Movement

Recommendation: SO to ensure that security team maintain duplicate copy


of invoice/challan of material movement for record and verification.

Findings/Observation no 7: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management

Recommendation: It is recommended that SO shall define training schedule


in such a way that all security personnel should get chance for the training
on the subjects defined in the compendium of SOP.

Findings/Observation no 8: No smart card (RFID) based access control


system at entrance of CCTV room

Compendium of SOP deviation: SOP No. 4 Security infrastructure and access


control- Design basis

Recommendation: It is recommended to have smart card (RFID) based


access control at entrance of CCTV room which fall under the category of
critical rooms category.

Findings/Observation no 9: Fire doors at all basement level have a door


handle from outside which can lead to unauthorized entry to floors without
any security check.

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling


security Guard.

Recommendation: It is recommended to remove the handle from outside


and security guard shall check each fire door and report observation to
security supervisor/SO.

Observation no 10: Prohibited Items list was not displayed in the building
entry/gates.

Compendium of SOP deviation: SOP No. 32, Prohibited Items in DLF Premises

Recommendation: It is recommended that the list of prohibited Items shall


be displayed at access points of building for security personnel consultation
and to enhance employee awareness level.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 7 of 55

Findings/Observation no 11: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 12: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 13: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 14: Security registers are not being maintained


properly on site as per the defined procedures.

Compendium of SOP deviation: SOP No. 57, Responsibilities of Head


Guard/SCR

Recommendation: It is recommended that SO to ensure implementation of


all defined log books/registers/register formats circulated by central security
team.

Findings/Observation no 15: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 8 of 55

with in full capacity.

6.3 Alignment with Compendium of SOP

DLF Gateway tower alignment with compendium of SOP: 76.19%

7. DLF Building -14

Building -14 security audit was carried out on 20 Dec 2018.

7.1 Good Practices

The following can be considered as good practices:

I. Well maintained CCTV room


II. Panic button installed in all Atriums
III. Turn-Out and Grooming of Protection force personnel
IV. Adequate CCTV coverage on building periphery
V. Security gallery well maintained
VI. Traffic management at surface/basements of building
VII. Formation of emergency response team with unique identification
badges of each team
VIII. All terrace doors are secured with access control system and
integrated with alarm system
IX. LCD screen blackout switch in CCTV room
X. Token process for bicycle

7.2 Audit Observations Detail

Findings/Observation no 1: Employees of companies are being allowed


through service lifts can result into unauthorized entry inside building.

Compendium of SOP deviation: SOP No.61 Responsibilities of security guard


at material loading/unloading point

Recommendation: SO to ensure that employees of companies are to be


directed to the main passenger lifts as service lifts are meant for movement
of material by authorized vendors.

Findings/Observation no 2: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 9 of 55

Findings/Observation no 3: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 4: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security staff/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 5: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 6: Key management system of site is inadequate.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original & duplicate key


box and issue key to concerned after verifying specimen signature. As a
good practice, follow the Mall of India key management style.

Findings/Observation no 7: High Tension/Low Tension/Engineering Control


Rooms falling under critical utility rooms found open despite having RFID
card-based access control system installed.

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling


guards.

Recommendation: SO of the building to ensure that security personnel to do


regular patrolling of critical room/location and report observation to
supervisor for preventive/corrective action.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 10 of 55

Findings/Observation no 8: No post wise specific duty orders were circulated


at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. Also conduct training of all security personnel as
per compendium of SOP. This will enhance security personnel awareness
and alertness level while performing duty at post.

Findings/Observation no 9: There was dearth of traffic signage, no marking


pedestrian path and Zebra crossing in all podium parking.

Compendium of SOP deviation: SOP No. 23, BSC audit for Traffic
management.

Recommendation: It is recommended to mark pathways, display signage in


the podium area for smooth traffic movement.

Findings/Observation no 10: Frequency of security mock drill is not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan and
SOP No 14 Unattended baggage in DLF premises

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. Also share the mock drill learnings
with all concerned stakeholders and maintain security equipment in healthy
state.

Findings/Observation no11: Duplicate copy of invoice/challan of material


movement is being not kept with security for record.

Compendium of SOP deviation: SOP 25, Material/Assets Movement

Recommendation: SO to ensure that security team maintain duplicate copy


of invoice/challan of material movement for record and verification.

Findings/Observation no 12: No effective record of issued vehicle tokens is


being maintained.

Compendium of SOP deviation: SOP No. 23, BSC Audit for Traffic
Management.

Recommendation: It is recommended to maintain record of issued token to


the vehicles getting entry inside the premises.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 11 of 55

7.3 Alignment with Compendium of SOP

Building – 14 alignment with compendium of SOP: 80.95%

8. DLF Building -6

The security audit of building – 6 was carried out on 21 Dec 2018.

8.1 Good Practices

The following can be considered as good practices:

I. Well maintained CCTV Room of building


II. All terrace doors are secured with access control system integrated
with alarm system
III. Utilities rooms are secured with ACS
IV. Emergency contact details of important building staff/police/fire
station/hospitals well maintained in SOC
V. Security documents are well maintained
VI. Personal file of security staff well maintained with annual medical
report and antecedent verification

8.2 Audit Observations Detail

Findings/Observation no 1: Security guard deployed at material


loading/unloading point was unaware of types/color/validity of vendor
passes.

Compendium of SOP deviation: SOP No. 61, Responsibilities of Security


Guard at Material loading/unloading point and SOP No. 1, Protection force
management.

Recommendation: It is recommended that SO/security supervisor to


conduct regular training of protection force personnel to train on
compendium of SOP’s and validation on ground thereafter.

Findings/Observation no 2: There was dearth of traffic signage, marking of


pedestrian path & zebra crossing and convex mirrors in LG floor and
basements.

Compendium of SOP deviation: SOP No. 23, BSC Audit for traffic
management.

Recommendation: It is recommended to install convex mirrors at blind


spots, demarcate pedestrian pathway and display mandatory traffic/safety
signages in basements/LG floor.

Findings/Observation no 3: Frequency of security mock drill is not defined.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 12 of 55

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan and
SOP No 14 Unattended baggage in DLF premises

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. Also share the mock drill learnings
with all concerned stakeholders and maintain security equipment in healthy
state.

Findings/Observation no 4: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 5: Security personnel are not making full use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 6: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security staff/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 7: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 8: No post wise standing orders were circulated at

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 13 of 55

all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection force

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. This will enhance security personnel awareness and
alertness level while performing duty at post.

Findings/Observation no 9: Unauthorized entry of vehicles were happening


by using other person’s car sticker at building In Ramp entry.

Compendium of SOP deviation: SOP No. 34, DLF Vehicle sticker.

Recommendation: SO of the building to ensure that such practices be


stopped and allow vehicles only if a valid DLF sticker is pasted on the
windscreen of vehicle.

Findings/Observation no 10: Security personnel are not making full use of


UVSM trolley (under vehicle search mirror) while checking vehicles.

Compendium of SOP deviation: SOP No. 50, Checking of Vehicle at DLF


Premises-Parking

Recommendation: SO of the building to ensure that security personnel make


full use of the security equipment while checking vehicles at In ramp entry.

Findings/Observation no 11: RFID card-based access control system found


ineffective as a call bell switch has been installed at SOC entrance. Any
individual can gain entry inside control by simply pressing the switch as
CCTV operator release the door of control from inside without verifying.

Compendium of SOP deviation: SOP No. 4 Security Infrastructure and


Access Control-Design Basis

Recommendation: It is recommended to remove call bell facility and


encourage practice of smart card (RFID) based access control entry.

Findings/Observation no 12: Surplus manpower deployed at Atrium D of


building and the deployed manpower found in idle state as there was not
much of personnel movement in Atrium D as compared to atrium A.

Compendium of SOP deviation: SOP No. 26, Post need assessment, Work
Breakdown Structure

Recommendation: FM partner security head/building SO to carry out zero


based WBDS in consultation with central security team.

Findings/Observation no 13: CCTV room operators were not aware of their


roles and responsibilities.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 14 of 55

Compendium of SOP deviation: SOP No 1 and SOP No 55 Protection Force


Management and Responsibilities of Security Officer

Recommendation: SO to conduct regular training to refresh/enhance


knowledge level of CCTV operators and carry out evaluation subsequently
at regular intervals. Also, HOT SPOT monitoring concept be implemented.

Findings/Observation no 14: Lost and Found process not implemented


properly on site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented on site as per the compendium of SOP.

Findings/Observation no 15: Awareness level of SO about compendium of


SOP was found inadequate.

Compendium of SOP deviation: SOP No 1, Responsibilities of Security Officer

Recommendation: FM partner security head to ensure that all SO shall read


and enhance their awareness level about compendium of SOP. This will also
help SO in imparting training to security personnel.

Finding/Observations no. 16: Returnable gate pass (RGP) are being not
followed by security team as per defined procedure.

Compendium of SOP deviation: SOP No 25, Material/Assets movement

Recommendation: SO of the building shall prepare fortnightly report of


material sent on RGP and in case of any material exceeding date of return
shall be reflected/followed up specially in report and submitted to BM.

Findings/Observation no 17: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1 Protection Force Management

Recommendation: It is recommended that building SO shall define schedule


in such a way that all security personnel should get chance for the training
on the subjects defined in the compendium of SOP.

8.3 Alignment with Compendium of SOP

Building – 6 alignment with compendium of SOP: 73.02%

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 15 of 55

9. DLF Building – 9A & B

Building - 9 A&B security audit was carried out on 18 Dec 2018.

9.1 Good Practices

The following can be considered as good practices:

I. Functionality of CCTV room


II. Adequate vehicle screening at In Ramp
III. Panic button installed at all Atriums/In Ramp for emergency
situations
IV. Traffic management
V. Overall security infrastructure in good shape
VI. Security gallery of site well maintained
VII. DMDRP room is having all essential items to cope with
emergency situations and their functionality is being regularly
checked regularly.
VIII. Response of Ambulance & QRT Team
IX. LCD screen blackout switch in CCTV room
X. Utilities rooms are secured with ACS
XI. Security documents are well maintained.

9.2 Audit Observations Detail

Findings/Observation no 1: Alignment of convex mirror at blind spots in


basements was not right.

Compendium of SOP deviation: SOP No. 23, BSC Audit for traffic
management.

Recommendation: SO to ensure that convex mirror shall be aligned


accurately so that equipment give desired result i.e. prevent collision of
vehicles

Findings/Observation no 2: Boom barrier was not functioning appropriately


at Out Ramp as boom barrier remain in open position after vehicle crossing
due to technical problem.

Compendium of SOP deviation: SOP No. 52, Operation of Boom Barrier in


DLF Premises

Recommendation: Boom Barrier should automatically close after vehicle


crossing to prevent any unauthorized vehicle entry/safety incident. SO to
consult concerned to rectify technical problem.

Findings/Observation no 3: Intercom facility on Tower B terrace was


nonfunctional, and no emergency contact list was displayed.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 16 of 55

Compendium of SOP deviation: SOP No. 63, Responsibilities of Patrolling


guards, SOP No. 55 Responsibilities of security officer

Recommendation: SO to ensure that intercom facility at terrace be made


functional and Patrolling guard to check these things while doing patrolling.
Also access at terrace should be given to authorized personnel only.

Findings/Observation no 4: Security guard deployed at material


loading/unloading point was unaware of types/color/validity of vendor
passes.

Compendium of SOP deviation: SOP No.38 and SOP No. 61, Vendor pass
management system/Responsibilities of Security Guard at Material
loading/unloading point

Recommendation: It is recommended that SO/security supervisor to


conduct regular training of protection force personnel to train on
compendium of SOP’s and validation on ground thereafter.

Findings/Observation no 5: There was dearth of traffic signage no marking


of Pedestrian path and Zebra crossing in the basement 2 and 3.

Compendium of SOP deviation: SOP No. 23, BSC audit for Traffic
management.

Recommendation: It is recommended to mark pathways, put adequate


signages in the basement area to enhance traffic management.

Findings/Observation no 6: No proper alignment of open to sky fire exit


doors, can be open from outside. Unauthorized entry inside building may
take from this point.

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling


Guards; SOP No. 55 Responsibilities of security officer

Recommendation: SO to highlight alignment error of fire doors to building


fire team on regular basis. Also patrolling guard to regularly report such
observations to SO timely.

Findings/Observation no 7: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 17 of 55

Findings/Observation no 8: Visitors are being allowed through material


gate entry point.

Compendium of SOP deviation: SOP No. 5, Access control system

Recommendation: SO to ensure that all visitors entry be routed through


atrium and access be given through VMS system.

Findings/Observation no 9: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 10: Employees of companies are being allowed


through service lifts can result into unauthorized entry inside building.

Compendium of SOP deviation: SOP No.61 Responsibilities of security guard


at material loading/unloading point.

Recommendation: SO to ensure that employees of companies be directed


to the main passenger lifts as service lifts are meant for movement of
material by authorized vendors.

Findings/Observation no 11: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 12: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 13: Security personnel are not making full use of

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 18 of 55

PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 14: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 15: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 16: Lost and Found process need improvement on


site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented at sites as per the compendium of SOP

9.3 Alignment with Compendium of SOP

Building – 9 A&B alignment with compendium of SOP: 74.60%

10. DLF Building -7 A&B

Building -7&B security audit was carried out on 19 Dec 2018.

10.1 Good Practices

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 19 of 55

The following can be considered as good practices:

I. Good response of Ambulance and QRT Team


II. Traffic signage and pedestrian pathway, zebra crossing marking in
basement.
III. Panic button installed at atrium
IV. All fire exit doors (except one odd case) and open to sky has no
handle from outside, this is helping in preventing unauthorized
entry in building.
V. Turn-Out of Protection force personnel

10.2 Audit Observations Detail

Findings/Observation no 1: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 2: Protection force personnel were unaware of


their duties at material loading/unloading/In Ramp posts/SOC.

Compendium of SOP deviation: SOP No. 1, Protection force management

Recommendation: It is recommended that SO/supervisor to conduct regular


training of protection force personnel on compendium of SOPs and monitor
their performance on ground thereafter.

Findings/Observation no 3: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 4: Unrestricted and without security check entries


were happening of material through service lifts.

Compendium of SOP deviation: SOP No. 55, Responsibility of Security Officer.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 20 of 55

Recommendation: SO to ensure that that material be checked by security


personnel before granting entry in service lifts.

Findings/Observation no 5: No validation of personnel I.D. cards being done


by security guard deployed at entry point near Metro gate.

Compendium of SOP deviation: SOP No. 58, Responsibilities of Security


Guard at pedestrian gate, SOP No. 5, Access control system.

Recommendation: It is recommended that SO/Supervisor to conduct regular


training for protection force personnel on compendium of SOPs and do
validation on ground thereafter.

Findings/Observation no 6: There was dearth of Traffic signage, Pedestrian


path and Zebra crossing marking in basements.

Compendium of SOP deviation: SOP No. 23, BSC audit for Traffic
management.

Recommendation: It is recommended to mark pathways, display traffic


signage in the basement area for smooth traffic movement.

Findings/Observation no 7: CCTV room operators were not aware of their


roles and responsibilities.

Compendium of SOP deviation: SOP No 1 and SOP No 55 Protection Force


Management and Responsibilities of Security Officer.

Recommendation: SO’s to conduct regular training to refresh/enhance


knowledge level of CCTV operators and carry out evaluation subsequently at
regular intervals.

Findings/Observation no 8: Vehicles were not parked in ready to go position.

Compendium of SOP deviation: SOP No. 23, BSC Audit for traffic
management.

Recommendations: Security personnel deployed in basement to ensure that


all vehicles to be parked in ready to go position. This will help in easy
evacuation in case of emergency.

Findings/Observation no 9: No communication facility/contact numbers


available at terrace area of all towers to communicate in case of any
emergency. Also, alarm system did not get activated when forced entry was
attempted.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 21 of 55

Compendium of SOP deviation: SOP No. 63, Responsibilities of Patrolling


guards; SOP No 55, Responsibilities of Security Officer

Recommendation: SO to ensure that Communication facility shall be


available at terrace area to communicate in case the door doesn’t open due
to malfunction in emergency. Alarm system should be regularly tested for its
proper functioning.

Findings/Observation no 10: There is continuous beep sound, unavailability


of cordless mouse, unorganized cabling and inadequate infrastructure at
CCTV room causing difficulties for CCTV operators to carry out his duties.

Compendium of SOP deviation: SOP No.4 Security Infrastructure and Access


Control: Design Basis

Recommendation: It is recommended that DLF/FM partner security head


shall provide fit to work environment to all security personnel at site. This
will enhance productivity level of security personnel.

Findings/Observation no 11: The height of the building front side perimeter


wall/grill is very low which is not as per ideal security infrastructure
standard.

Compendium of SOP deviation: SOP No.4, Security infrastructure and Access


control: Design basis

Recommendation: It is suggested that there shall be well defined wall/grill of


approx. 10 ft of the building periphery.

Finding/Observation no. 12: Rear side fire exit door of building is being used
for regular movement by personnel as fire door have handle from outside.
This can result in unauthorized entry.

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling

Recommendation: It is recommended that the patrolling security guard shall


check each fire door and report observation to security supervisor/SO. Also
consider removing of handle from outside of fire door.

Findings/Observation no 13: No post wise specific duty orders were


circulated at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 22 of 55

Recommendation: It is recommended that the post specific duty orders


shall be circulated at all post. This will enhance security personnel
awareness and alertness level while performing duty at post.

Findings/Observation no 14: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 15: Security personnel are not making full use of PTZ
camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security Officer


and SOP No. 62 Responsibilities of Security Guard/CCTV operator at CCTV
Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Finding/Observations no. 16: Returnable gate pass (RGP) are being not
followed up by security team as per defined procedure.

Compendium of SOP deviation: SOP No 25, Material/Assets movement

Recommendation: SO of the building shall prepare fortnightly report of


material sent on RGP and in case of any material exceeding date of return
shall be reflected/followed up specially in report and submitted to BM. Also
authorized signatory list be maintained for authorizing material in/out.

Findings/Observation no 17: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 18: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 23 of 55

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of authorized
person before issuing key. As a good practice, follow the Mall of India, Noida
key management procedure.

Findings/Observation no 19: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such a


way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 20: No effective record of issued vehicle tokens is


being maintained.

Compendium of SOP deviation: SOP No. 23, BSC Audit for Traffic
Management.

Recommendation: It is recommended to maintain record of issued token to


the vehicles getting entry inside the premises.

Findings/Observation no 21: Security registers are not being maintained


properly on site as per the defined procedures.

Compendium of SOP deviation: SOP No. 57, Responsibilities of Head


Guard/SCR

Recommendation: It is recommended that SO to ensure implementation of


all defined log books/registers/register formats circulated by central security
team.

Findings/Observation no 22: The awareness level of building SO about


compendium of SOP was found inadequate.

Compendium of SOP deviation: SOP No 55 Responsibilities of Security


Officer

Recommendation: FM security head to ensure that SO of building shall read


and enhance their awareness level about compendium of SOP. This will also
help SO in imparting training to security force personnel and discharging
his duties at site.

Findings/Observation no 23: Lost and Found process need improvement on


site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 24 of 55

Recommendation: It is recommended that handling of lost and found process


shall be implemented at sites as per the compendium of SOP

Findings/Observation no 24: Preventive maintenance schedule of security


camera CCTV is being not maintained and verified at site.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Recommendation: It is recommended that the Vendor shall be consulted to


provide Preventive maintenance schedule (PMS) of CCTV cameras. SO shall
ensure and verify that all the maintenance is being done as per schedule
and maintain equipment specific record.

Findings/Observation no 25: The Image quality of few CCTV cameras need


to be improved.

Compendium of SOP deviation: SOP 42, Management of Security


Equipment

Recommendation: It is recommended to always do routine health checkup


of CCTV camera and ensure all CCTV cameras should be in working
condition and recording video of good quality.

10.3 Alignment with Compendium of SOP

Building – 7 A&B alignment with compendium of SOP: 60.32%

11. DLF Building -10

The security audit of building – 10 was carried out on 30 Nov 2018 and 03
Dec 2018.

11.1 Good Practices

The following can be considered as good practices:

I. Alarm system installed at Terrace door and secured with ACS


II. Response of Ambulance & QRT Team
III. Security personnel were aware about bomb threat call procedures
IV. Use of E -scooters having PA system/First Aid Box/Fire
extinguisher for patrolling
V. Most of the Utilities room are secured with ACS
VI. State Police Deployment outside building on national highway
VII. Traffic management by traffic team

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 25 of 55

11.2 Audit Observations Detail

Findings/Observation no 1: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that


each security personnel should submit PSARA certificate on day of joining
duty and existing personnel to submit at earliest.

Findings/Observation no 2: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 3: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their
card at turnstile while leaving the building. This will help in capturing real
time data.

Findings/Observation no 4: There is continuous beep sound in CCTV room


which is causing difficulties for CCTV operators to carry out his duties.

Compendium of SOP deviation: SOP No.4 Security Infrastructure and


Access Control: Design Basis

Recommendation: It is recommended that FM security head/building SO


shall provide fit to work environment to all security personnel at site and
consult concerned vendor for maintenance of equipment on time. This will
enhance productivity level of security personnel.

Findings/Observation no 5: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 26 of 55

a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 6: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make


full use of the DFMD to enhance screening level on site.

Findings/Observation no 7: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be
used with in full capacity.

Findings/Observation no 8: A few protection force members were not aware


about security SOPs followed on site.

Compendium of SOP deviation: SOP No. 1, Protection force management;


SOP

Recommendation: It is recommended that SO to conduct regular training of


protection force personnel and evaluate their performance on ground
thereafter.

Findings/Observation no 9: Unrestricted and without security check entries


were happening of material through service lifts.

Compendium of SOP deviation: SOP No. 55, Responsibility of Security


Officer.

Recommendation: SO to ensure that that material be checked by security


personnel before granting entry in service lifts.

Findings/Observation no 10: There was dearth of traffic signage, no


marking of pedestrian path and Zebra crossing in the basements especially
2 & 3.

Compendium of SOP deviation: SOP No. 23, BSC audit for Traffic
management.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 27 of 55

Recommendation: It is recommended that pathways and zebra crossing be


marked and display signages in the basement area for smooth traffic
movement and to prevent any accident.

Findings/Observation no 11: Two-wheeler were being allowed in building


basement without DLF Stickers.

Compendium of SOP deviation: SOP No. 34, DLF vehicle sticker policy.

Recommendation: It is recommended that security personnel shall ensure


that no vehicle be allowed in basement without DLF sticker.

Findings/Observation no 12: Inadequacy in Vendor pass management


system was noticed as personnel with expired vendor passes found inside
building.

Compendium of SOP deviation: SOP No.38 and SOP No. 61, Vendor pass
management system/ Responsibilities of Security Guard at Material
loading/unloading point

Recommendation: It is recommended that SO/Supervisor to conduct


training of security guards on vendor pass management system and
evaluate their performance on ground thereafter.

Findings/Observation no 13: ACS system in D.G Room was nonfunctional.

Compendium of SOP deviation: SOP No. 5, Access control system and SOP
No 63, Responsibilities of patrolling guard

Recommendation: It is recommended that patrolling guard to check


functionality of ACS of critical rooms on regular basis and SO to ensure
functionality in case of any deviation.

Findings/Observation no 14: Unattended bags found in basement cycle


stand parking area.

Compendium of SOP deviation: SOP No 14, Unattended baggage in DLF


premises and SOP No. 63, Responsibilities of patrolling guard

Recommendation: Effective surveillance of premises be done to check of


any unattended baggage either by CCTV or patrolling S/G. Stipulated
guidelines pertaining to unattended bags as per SOP be followed in case of
any observation.

Findings/Observation no 15: Dedicated loading/unloading area not


demarcated/marked.

Compendium of SOP deviation: SOP No. 4, Security infrastructure and

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 28 of 55

access control: Design basis and SOP No. 61, Responsibilities of Security
Guard at Material loading/unloading point

Recommendation: A dedicated material loading/unloading point shall be


clearly demarcated/marked and security guard to check vendor pass and
challan/items before allowing entry.

Findings/Observation no 16: Open to sky fire exit doors found in open


condition as push bars are damaged. This can result in unauthorized entry
inside building

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling


security Guard.

Recommendation: It is recommended that the security guard shall check


each fire door and report observation to security supervisor/SO while doing
patrolling. SO to highlight the issue to fire team for rectification.

Findings/Observation no 17: Printer for generating visitor access slip was


not available in Tower A Atrium.

Compendium of SOP deviation: SOP No. 35 (3.7) The visitor pass/slip shall
be provided to the visitor to visit the designated client area.

Recommendation: SO of the building to ensure availability of printer for


generating visitor slips at Atrium and visitor be given slip before allowing
entry inside building.

Findings/Observation no 18: Screening of personnel bags in the atrium was


not adequate.

Compendium of SOP deviation: SOP No 59, Responsibilities of Security staff


at Atrium.

Recommendation: It is recommended that personnel bags need to be


screened thoroughly by using magnetic stick or as a best practice install X-
ray baggage machine for bags screening.

Findings/Observation no 19: Security personnel are not making full use of


UVSM trolley (under vehicle search mirror) while checking vehicles.

Compendium of SOP deviation: SOP No. 50, Checking of Vehicle at DLF


Premises-Parking

Recommendation: SO of the building to ensure that security personnel


make full use of the security equipment while checking vehicles at In ramp.

Findings/Observation no 20: Bank ATM Gunman was noticed in building


tower C, atrium without valid gun license.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 29 of 55

Compendium of SOP deviation: SOP No.30 & 31 ATM/Cash in transit and


Armed Guard for ATM/Bank Operation

Recommendation: The security guard deployed at atrium shall check I.D.


card and validity of gun license. Also ensure log in register.

Findings/Observation no 21: Vehicles were not parked in ready to go


position.

Compendium of SOP deviation: SOP No. 23 BSC Audit for Traffic


Management.

Recommendation: It is recommended that all vehicles be parked in ready to


go position. This will help in quick evacuation in case of emergency.

Findings/Observation no 22: No post wise specific duty orders were


circulated at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders


shall be circulated at all post. This will enhance security personnel
awareness and alertness level while performing duty at post.

Findings/Observation no 23: Lost and Found process need improvement on


site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented at site as per the compendium of SOP.

Findings/Observation no 24: Security registers/record keeping at site need


improvement.

Compendium of SOP deviation: SOP No. 57 & 55, Responsibilities of Head


Guard/SCR and Security Officer

Recommendation: It is recommended that SO to ensure implementation of


all defined log books/registers/register formats circulated by central
security team.

Findings/Observation no 25: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 30 of 55

box and issued register properly. Also verify specimen signature of


authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 26: Quality to be improved of few CCTV cameras.

Compendium of SOP deviation: SOP 42 and 62, Management of Security


Equipment and Responsibilities of Security Staff/CCTV Operator.

Recommendation: It is recommended that CCTV operator should always do


routine health checkup of CCTV camera and ensure all CCTV cameras are
recording video of good quality.

Findings/Observation no 27: Security personnel were doing continuous


shift.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that security personnel shall not be


deployed beyond stipulated duty hours.

11.3 Alignment with Compendium of SOP

Building – 10 alignment with compendium of SOP: 57.14%

12. DLF Building -Infinity

The security audit of building Infinity was carried out on 03 Dec 2018.

12.1 Good Practices

The following can be considered as good practices:

I. Turn-Out of Protection force personnel


II. Adequate CCTV coverage of building periphery
III. RFID card-based access control system at critical utility rooms
IV. DMDRP room equipment functionality
V. Panic button installed at building Atriums

12.2 Audit Observations Detail

Findings/Observation no 1: The awareness level of building SO about


compendium of SOP was found inadequate.

Compendium of SOP deviation: SOP No 55, Responsibilities of Security


Officer

Recommendation: FM security head to ensure that SO of building shall

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 31 of 55

read and enhance their awareness level about compendium of SOP. This
will also help SO in imparting training to security force personnel and
discharging his duties at site.

Findings/Observation no 2: Unrestricted and without security check entries


were happening of material through service lifts.

Compendium of SOP deviation: SOP No.55, Responsibility of Security


Officer.

Recommendation: SO to ensure that that material be checked by security


personnel before granting entry in service lifts.

Finding/Observations no. 3: Returnable gate pass (RGP) are being not


followed by security team as per defined procedure.

Compendium of SOP deviation: SOP No 25, Material/Assets movement

Recommendation: SO of the building shall prepare fortnightly report of


material sent on RGP and in case of any material exceeding date of return
shall be reflected/followed up specially in report and submitted to BM.

Findings/Observation no 4: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate


key box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 5: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 6: No post wise specific duty orders were circulated


at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. Also conduct training of all security personnel as
per compendium of SOP. This will enhance security personnel awareness

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 32 of 55

and alertness level while performing duty at post.

Findings/Observation no 7: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that


each security personnel should submit PSARA certificate on day of joining
duty and existing personnel to submit at earliest.

Findings/Observation no 8: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 9: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 10: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 11: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 33 of 55

at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 12: Lost and Found process need improvement on


site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented at sites as per the compendium of SOP

Findings/Observation no 13: Preventive maintenance schedule (PMS) of


CCTV cameras were not available.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Recommendation: It is recommended that the Vendor shall be consulted to


provide Preventive maintenance schedule (PMS) of CCTV cameras and copy
to be kept in CCTV room. Security head shall ensure that all the maintenance
is being done as per schedule.

Findings/Observation no 14: CCTV recording capability for 30 days was not


available in CCTV room.

Compendium of SOP deviation: SOP 42, Management of Security Equipment

Recommendation: SO to ensure that CCTV camera recording be kept for a


period of 30 days and concerned vendor to be consulted to provide required
hard disc for storage.

Findings/Observation no 15: Security registers are not being maintained


properly on site as per the defined procedures.

Compendium of SOP deviation: SOP No. 57, Responsibilities of Head


Guard/SCR

Recommendation: It is recommended that SO to ensure implementation of


all defined log books/registers/register formats circulated by central security
team.

12.3 Alignment with Compendium of SOP

Building – Infinity alignment with compendium of SOP: 76.19%

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 34 of 55

13. DLF Building - 8

The security audit of building – 8 was carried out on 17 Dec 2018.

13.1 Good Practices

The following can be considered as good practices:

I. CCTV room of building well maintained


II. Turnout of security protection force personnel
III. Hot key facility available to communicate in emergency
IV. Critical utility room and terrace secured with ACS
V. Pedestrian pathway and zebra crossing well marked in basement
VI. Adequate traffic signages in basement
VII. Protection Force were aware of their roles and responsibilities
VIII. Panic button installed at Atrium

13.2 Audit Observations Detail

Findings/Observation no 1: Vendors material/personnel movement of


Cyber Hub, building 10 & Innov8 happening without any security check at
gate no 3. Also boom barrier on this gate was not operational.

Compendium of SOP deviation: SOP No.4, Security infrastructure and


Access control: Design basis and SOP No. 38, Vendor pass management;
SOP No. 1, Management of Protection Force

Recommendation: It is recommended to implement security check at gate


no 3. This will prevent entry of vendor to any other building from building
8 basement. Also boom barrier shall be made operational. This will help
strengthen access control of site.

Findings/Observation no 2: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 3: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 35 of 55

at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 4: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 5: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 6: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 7: Security personnel were not aware about radio


set call sign used at site.

Compendium of SOP deviation: SOP No.1, Protection Force Management &


SOP No 55, Responsibility of Security Officer

Recommendation: It is recommended that SO to conduct training of security


personnel on radio set communication and do evaluation on ground
thereafter. Also ensure communication through RT set is possible from all
over the building including basement.

Findings/Observation no 8: No post wise specific duty orders were circulated


at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 36 of 55

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. Also conduct training of all security personnel as
per compendium of SOP. This will enhance security personnel awareness
and alertness level while performing duty at post.

Findings/Observation no 9: Lost and Found process need improvement on


site.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented at site as per the compendium of SOP

Findings/Observation no 10: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 11: Preventive maintenance schedule of security


camera CCTV is being not maintained and verified at site.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Recommendation: It is recommended that the vendor shall be consulted to


provide Preventive maintenance schedule (PMS) of CCTV cameras. SO
shall ensure and verify that all the maintenance is being done as per
schedule and maintain equipment specific record.

Findings/Observation no 12: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that


each security personnel should submit PSARA certificate on day of joining
duty and existing personnel to submit at earliest.

Findings/Observation no 13: Security registers/record keeping need


improvement on site as per the defined procedures.

Compendium of SOP deviation: SOP No. 57, Responsibilities of Head

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 37 of 55

Guard/SCR

Recommendation: It is recommended that SO to ensure implementation of


all defined log books/registers/register formats circulated by central security
team.

Findings/Observation no 14: Security patrolling guard observations are


being not captured/analyzed.

Compendium of SOP deviation: SOP No. 55 & 56, Responsibilities of Security


Officer & Supervisor

Recommendation: It is recommended that SO/supervisor of building shall


capture/analyze the observation provided by patrolling guard to take
corrective/preventive action.

13.3 Alignment with Compendium of SOP

Building – 8 alignment with compendium of SOP: 77.78

14. DLF Building -5

The security audit of building – 5 was carried out on 12 Dec 2018.

14.1 Good Practices

The following can be considered as good practices:

I. Response of Ambulance & QRT Team


II. Grooming standard of security personnel
III. Vehicle parked in ready to go position
IV. Panic button installed in Atrium
V. Display of prohibited Items at entry points
VI. Well maintained security gallery for training.

14.2 Audit Observations Detail

Findings/Observation no 1: Access control system at terrace door is being


not used effectively as door remain in open condition and alarm system
found non-functional.

Compendium of SOP deviation: SOP No. 63, Responsibilities of Patrolling


guard

Recommendation: SO to ensure that Patrolling guard shall check


functionality of ACS while doing patrolling and observation be reported to
SO on regular basis so that corrective and preventive action can be taken.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 38 of 55

Findings/Observation no 2: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 3: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall make schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 4: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that


each security personnel should submit PSARA certificate on day of joining
duty and existing personnel to submit at earliest.

Findings/Observation no 5: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 6: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make


full use of the DFMD to enhance screening level on site.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 39 of 55

Findings/Observation no 7: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their
card at turnstile while leaving the building. This will help in capturing real
time data.

Findings/Observation no 8: No post wise specific duty orders were


circulated at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders


shall be circulated at all post. Also conduct training of all security personnel
as per compendium of SOP. This will enhance security personnel awareness
and alertness level while performing duty at post.

Findings/Observation no 9: Unauthorized entry inside building possible


from the fire door (remain in open condition and used as service door)
located near in ramp Tower A, B & C.

Compendium of SOP deviation: SOP No. 4 Security infrastructure and


Access control: Design basis & SOP No 5 Access control system.

Recommendation: It is proposed that the effective security control be


implemented either by deploying security guard or fire door not be used as
service door to prevent any unauthorized entry inside building.

Findings/Observation no 10: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 11: ACS of critical installations like ventilation


room, LT Panel, HT Panel found nonfunctional.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 40 of 55

Compendium of SOP deviation: SOP No. 4 Security infrastructure and


Access control: Design basis & SOP No 5 Access control system

Recommendation: SO to ensure that all ACS system installed at critical


location of building site be functional always and consult the service
provider/vendor in case of non-functionality.

Findings/Observation no 12: No mechanism/control available to stop


unauthorized entry in Pump room located in B 1 & 2

Compendium of SOP deviation: SOP No. 4 Security infrastructure and


Access control: Design basis & SOP No 5 Access control system

Recommendation: It is proposed that put effective control at pump room


entry either by putting ACS or lock & key mechanism to stop unauthorized
entry.

Findings/Observation no 13: There was dearth of traffic signage, no


marking of pedestrian path and Zebra crossing in podium and basement
parking.

Compendium of SOP deviation: SOP No. 23, BSC audit for Traffic
management.

Recommendation: It is recommended to mark pathways, display signage


in the podium and basement for smooth traffic movement and to prevent
any traffic incident.

Findings/Observation no 14: The Image quality of few CCTV cameras


need to be improved.

Compendium of SOP deviation: SOP 42, Management of Security


Equipment

Recommendation: It is recommended to always do routine health checkup


of CCTV camera and ensure all CCTV cameras should be in working
condition and recording video of good quality.
14.3 Alignment with Compendium of SOP

Building – 5 alignment with compendium of SOP: 77.78%

15. DLF Building -Cyber Green

The security audit of building – 10 was carried out on 19 Dec 2018.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 41 of 55

15.1 Good Practices

The following can be considered as good practices:

I. RFID System for vehicles entry


II. Material management at site
III. Grooming of Protection Force personnel
IV. Maintenance card of each security equipment
V. Access control system at critical rooms of building
VI. Lost and found process well implemented
VII. Panic button installed at all atriums
VIII. Adequate perimeter boundary wall height of approx. 10.5 feet at
vulnerable rear side of building with a watch tower
IX. Response of ERT team
X. Convex mirrors installed at all blind spots as per SOP
XI. Mandatory traffic/directional/safety signage’s are fixed at strategic
locations.

15.2 Audit Observations Detail

Findings/Observation no 1: A turnstile of Tower DE was found not


functional.

Compendium of SOP deviation: SOP No.42, Management of security


equipment & SOP No. 5 Access control system

Recommendation: SO of the building to ensure that all access control


system of building be in functional mode always. Also consult concerned
service provider/vendor on regular basis in case of any deviation.

Findings/Observation no 2: No intercom facility was available, and no


emergency contact list were displayed on all towers terrace.

Compendium of SOP deviation: SOP No. 63, Responsibilities of Patrolling


guards, SOP No. 55 Responsibilities of security officer

Recommendation: It is suggested that SO to ensure that intercom facility


at terrace be available and emergency contact list be displayed adjoining
to terrace door. Also access at terrace should be given to authorized
personnel only.

Findings/Observation no 3: Alarm system installed on terrace area did not


get activated in tower D/E/A terrace on testing.

Compendium of SOP deviation: SOP No. 5, Access control system

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 42 of 55

Recommendation: SO to ensure that all ACS of building be functional at all


time and do regular testing system and record be maintained for the same.

Findings/Observation no 4: RFID based card reader access control system


not installed in the critical DG room.

Compendium of SOP deviation: SOP No. 5 Access control system and SOP
No 63, Responsibilities of patrolling guard

Recommendation: It is suggested that RFID based access control system to


be installed at DG room as it fall under category of critical utility rooms. This
will help in controlling unauthorized access.

Findings/Observation no 5: Security guard deployed at material


loading/unloading point was not aware of type/color/validity of vendor
passes.

Compendium of SOP deviation: SOP No. 61, Responsibilities of Security


Guard at Material loading/unloading point and SOP No. 1, Protection force
management.

Recommendation: SO/supervisor to ensure that post specific training be


given all protection force personnel and circulate post wise roles and
responsibilities order.

Findings/Observation no 6: Preventive maintenance schedule of security


camera CCTV is being not maintained and verified at site.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Recommendation: It is recommended that the vendor shall be consulted to


provide Preventive maintenance schedule (PMS) of CCTV cameras. SO
shall ensure and verify that all the maintenance is being done as per
schedule and maintain equipment specific record.

Findings/Observation no 7: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 43 of 55

Findings/Observation no 8: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 9: Security personnel are not making full Use of


DFMD installed at the atrium entrance.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 10: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Findings/Observation no 11: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall make schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 12: QR code validity not defined in existing VMS


system.

Compendium of SOP deviation: SOP No.35 & 59, Visitor Management and
Responsibilities of security staff at Atrium

Recommendation: It is recommended that SO and building CRM to consult


concerned service provider/vendor and define QR code validity so that
misuse can be stopped.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 44 of 55

Findings/Observation no 13: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 14: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

15.3 Alignment with Compendium of SOP

Building – Cyber Green alignment with compendium of SOP: 77.78%

16. DLF Cyber Hub

The security audit DLF Cyber Hub was carried out on 3 Dec 2018.

16.1 Good Practices

The following can be considered as good practices:

I. Security personnel are aware of their roles and responsibility.


II. Dedicated ERT available at facility for handling emergency
situations.
III. Security patrolling on Segway

16.2 Audit Observations Detail

Findings/Observation no 1: Security personnel were not making full Use of


DFMD and carrying out frisking with non-functional HHMD

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in
DLF Premises

Recommendation: SO to ensure that security personnel shall make full use

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 45 of 55

of the DFMD and functional HHMD be used for frisking to enhance


screening level on site.

Findings/Observation no 2: The Image quality of few CCTV cameras need


to be improved.

Compendium of SOP deviation: SOP 42, Management of Security


Equipment

Recommendation: It is recommended to always do routine health checkup


of CCTV camera and ensure all CCTV cameras should be in working
condition and recording video of good quality.

Findings/Observation no 3: CCTV room operators were not aware of their


roles and responsibilities.

Compendium of SOP deviation: SOP No 1 and SOP No 55 Protection Force


Management and Responsibilities of Security Officer

Recommendation: SO to conduct regular training to refresh/enhance


knowledge level of CCTV operators and carry out evaluation subsequently
at regular intervals.

Findings/Observation no 4: CCTV recording capability for 30 days was not


available in few DVR.

Compendium of SOP deviation: SOP 42, Management of Security Equipment

Recommendation: SO to ensure that CCTV camera recording be kept for a


period of 30 days and concerned vendor be consulted to provide required
storage.

Findings/Observation no 5: Screening of personnel bags in the atrium was


not adequate.

Compendium of SOP deviation: SOP No 58, Responsibilities of Security staff


at Pedestrian gate.

Recommendation: It is proposed that personnel bags need to be screened


systematically may be by using magnetic stick.

Findings/Observation no 6: Preventive maintenance schedule of security


camera CCTV is being not maintained and verified at site. Also, overall
CCTV room is being not maintained properly.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 46 of 55

Recommendation: It is recommended that the Vendor shall be consulted to


provide Preventive maintenance schedule (PMS) of CCTV cameras. SO
shall ensure and verify that all the maintenance is being done as per
schedule and maintain equipment specific record.

Findings/Observation no 7: No smart card (RFID) based access control


system at entrance of CCTV room

Compendium of SOP deviation: SOP No. 4 Security infrastructure and access


control- Design basis

Recommendation: It is recommended to have smart card (RFID) based


access control at entrance of CCTV room which fall under the category of
critical rooms category.

Findings/Observation no 8: Key management system on site need


improvement.

Compendium of SOP deviation: SOP No. 43, Key Management

Recommendation: It is recommended to maintain original and duplicate key


box and issued register properly. Also verify specimen signature of
authorized person before issuing key. As a good practice, follow the Mall of
India, Noida key management procedure.

Findings/Observation no 9: Lost and Found process need improvement on


site as inadequacy noticed in tracking owner and keeping of L&F material.

Compendium of SOP deviation: SOP No.46 Handling of Lost and Found

Recommendation: It is recommended that handling of lost and found


process shall be implemented at sites as per the compendium of SOP.

Findings/Observation no 10: Security personnel are not making full use of


UVSM trolley (under vehicle search mirror) while checking vehicles at SP 1
& 2.

Compendium of SOP deviation: SOP No. 50, Checking of Vehicle at DLF


Premises-Parking

Recommendation: SO of the building to ensure that security personnel make


full use of the security equipment while checking vehicles at SP 1 & 2.

Findings/Observation no 11: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 47 of 55

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 12: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 13: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management.

Recommendation: It is recommended that SO shall define schedule in such


a way that all security personnel should get chance for the training on the
subjects defined in the compendium of SOP.

Findings/Observation no 14: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 15: No post wise specific duty orders were


circulated at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. Also conduct training of all security personnel as
per compendium of SOP. This will enhance security personnel awareness
and alertness level while performing duty at post.

16.3 Alignment with Compendium of SOP

Cyber Hub alignment with compendium of SOP: 76.19%

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 48 of 55

17. DLF Centre

The security audit of DLF Centre was carried out on 14 Jan 2019.

17.1 Good Practices

The following can be considered as good practices:

I. Response of Ambulance & QRT Team


II. Convex mirrors installed at all blind spots
III. Pedestrian pathways segregated from main driveway and clearly
marked with directional traffic signage
IV. Protection force personnel are PSARA certified
V. Antecedent verification and annual medical fitness record of
protection force personnel well maintained

17.2 Audit Observations Detail

Findings/Observation no 1: No post wise specific duty orders were


circulated at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection


Force

Recommendation: It is recommended that the post specific duty orders


shall be circulated at all post. Also conduct training of all security
personnel as per compendium of SOP. This will enhance security
personnel awareness and alertness level while performing duty at post.

Findings/Observation no 2: Inadequate vehicle trunk compartment


screening at vehicle entry point.

Compendium of SOP deviation: SOP No. 50 Checking of Vehicles in DLF


Premises-Parking

Recommendation: Security personnel to carry out screening of vehicles as


per the defined practice before granting entry.

Findings/Observation no 3: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 49 of 55

Findings/Observation no 4: Unrestricted and without security check entries


were happening of material through service lifts.

Compendium of SOP deviation: SOP No. 55, Responsibility of Security


Officer.

Recommendation: SO to ensure that that material be checked by security


personnel before granting entry in service lifts.

Findings/Observation no 5: Open to sky fire exit doors have a door handle


from outside which can lead to unauthorized entry to floors without any
security check.

Compendium of SOP deviation: SOP No. 63 Responsibilities of Patrolling


security Guard.

Recommendation: It is proposed to remove the handle from outside and


security guard shall check each fire door and report observation to security
supervisor/SO.

Findings/Observation no 6: There is no panic button installed at atrium.

Compendium of SOP deviation: SOP No. 36 Visitor Management at Gateway


Tower.

Recommendation: As a preventive measure and good practice it is


recommended to install panic button linked with alarm system in SCR room
at atrium. This will enhance response time during any emergency.

Findings/Observation no 7: Security personnel are not making full use of


PTZ camera as password is not shared with CCTV operator.

Compendium of SOP deviation: SOP No. 55 Responsibilities of Security


Officer and SOP No. 62 Responsibilities of Security Guard/CCTV operator at
CCTV Room.

Recommendation: It is recommended that SO of building should share the


password of PTZ camera with CCTV operator so that equipment can be used
with in full capacity.

Findings/Observation no 8: The height of the camera installed at the back


side of building is too low as it can be damaged by any passerby having
malafide intention.

Compendium of SOP deviation: SOP No. 42, Management of Security


Equipment

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 50 of 55

Recommendation: SO to ensure that concerned vendor be consulted re-


installed the existing camera at adequate height level (Approx. 9 ft).

Findings/Observation no 9: DLF parking sticker was not pasted/displayed on


windscreen of four wheelers.

Compendium of SOP deviation: SOP No. 34, DLF vehicle sticker policy.

Recommendation: It is recommended that security personnel to check DLF


sticker on vehicles before granting entry to park vehicle.

Findings/Observation no 10: Awareness level of SO about compendium of


SOP was found inadequate.

Compendium of SOP deviation: SOP No 1 and 55 Protection Force


Management and Responsibilities of Security Officer

Recommendation: FM security head to ensure that SO shall read and


enhance their awareness level about compendium of SOP. This will also
help SO in imparting training to security personnel.

Findings/Observation no 11: RFID based card reader access control system


not installed in the critical LT & HT rooms.

Compendium of SOP deviation: SOP No. 5 Access control system and SOP
No 63, Responsibilities of patrolling guard

Recommendation: It is proposed that RFID based access control system to


be installed at HT & LT rooms as these rooms fall under category of critical
utility rooms. This will help in controlling unauthorized access.

Findings/Observation no 12: There is no procedure in place on site to impose


penalty in case of any violation.

Compendium of SOP deviation: SOP No. 33, Imposition of penalty against


violation and damage to property.

Recommendation: It is recommended that the procedure as per DLF SOP be


implemented on site.

Findings/Observation no 13: Vendor vehicles and employees are being


allowed to enter from rear gate of site which is meant for emergency
purpose only.

Compendium of SOP deviation: SOP No. 55, Responsibilities of Security


Officer

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 51 of 55

Recommendation: Security officer to ensure that all employees and vendor


vehicles entry be routed from site main gate and grant entry after proper
security check.

Findings/Observation no 14: Personal drivers are being not issued passes as


per Vendor pass management system.

Compendium of SOP deviation: SOP No. 38 Vendor Pass management

Recommendation: SO to ensure that vendor pass management process be


implemented on site. This will strengthen existing access control on site.

Findings/Observation no 15: Building front side boundary wall/grill is too low


and it can be easily scalable in case of any agitation/strike.

Compendium of SOP deviation: SOP No.4, Security infrastructure and access


control- Design basis

Recommendation: Consider raising height of existing boundary wall/grill at


least up to approx. 10 feet.

Findings/Observation no 16: Security personnel are not making full Use of


DFMD installed at the entry points.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 17: The Image quality of few CCTV cameras need


to be improved.

Compendium of SOP deviation: SOP 42, Management of Security


Equipment

Recommendation: It is recommended to always do routine health checkup


of CCTV camera and ensure all CCTV cameras should be in working
condition and recording video of good quality.

17.3 Alignment with Compendium of SOP

DLF Centre alignment with compendium of SOP: 73.02%

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 52 of 55

18. DLF IT Park Chandigarh

The security audit DLF IT Park Chandigarh was carried out on 14 Dec
2018.

18.1 Good Practices

The following can be considered as good practices:

I. Grooming and turnout of protection force personnel


II. Security Documentation
III. Material management on site
IV. Terrace doors secured with ACS and alarm system
V. Effective communication system
VI. Lost & Found process well implemented
VII. Effective Key management at Mall
VIII. Good response of ERT
IX. Awareness level of security force personnel of security procedure
including bomb threats & unattended baggage handling

18.2 Audit Observations Detail

Findings/Observation no 1: ACS not installed in critical Installations like DG


Room, Pump room and Transformer room.

Compendium of SOP deviation: SOP No. 4, Security infrastructure and


Access control: Design basis and SOP No 5 Access control system

Recommendation: It is proposed that access control system in critical


Installations shall be installed to avoid any unauthorized entry.

Findings/Observation no 2: Vendor pass management process need


improvement on site.

Compendium of SOP deviation: SOP No. 38, Vendor pass management

Recommendation: It is recommended that the security head shall ensure


the implementation of Vendor Pass management process on site. Also carry
out training of security force personnel.

Findings/Observation no 3: Security personnel were doing continuous shift.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that security personnel shall not be


deployed beyond stipulated duty hours.

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 53 of 55

Findings/Observation no 4: Existing security personnel are not PSARA


certified.

Compendium of SOP deviation: SOP No.1 Protection Force Management.

Recommendation: It is recommended that FM partner shall ensure that each


security personnel should submit PSARA certificate on day of joining duty
and existing personnel to submit at earliest.

Findings/Observation no 5: The frequency of security mock drills is being


not defined.

Compendium of SOP deviation: SOP No. 10, Emergency evacuation plan.

Recommendation: It is recommended to define frequency of security mock


drills and carry out mock drills as per that. It is important to enhance
awareness level among response team of their role and responsibilities
during security crisis situations. Also share the mock drill learning to all
concerned stakeholders.

Findings/Observation no 6: Security personnel are not making full Use of


DFMD installed at entry points.

Compendium of SOP deviation: SOP No. 53, Use of DFMD and HHMD in DLF
Premises

Recommendation: It is recommended that security personnel shall make full


use of the DFMD to enhance screening level on site.

Findings/Observation no 7. No post wise specific duty orders were circulated


at all posts.

Compendium of SOP deviation: SOP No. 1, Management of Protection Force

Recommendation: It is recommended that the post specific duty orders shall


be circulated at all post. Also conduct training of all security personnel as
per compendium of SOP. This will enhance security personnel awareness
and alertness level while performing duty at post.

Findings/Observation no 8: CCTV room size is very small leading to not


effective monitoring of the CCTV cameras.

Compendium of SOP deviation: SOP No. 62 Duties of X-Ray


operator/security staff at CCTV Room

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 54 of 55

Recommendation: It is proposed that a centralized CCTV room shall be made


where IT park as well as mall CCTV cameras may be monitored. This will
enhance surveillance capability on site.

Findings/Observation no 9: In adequate Traffic signages in Mall basement.

Compendium of SOP Deviation: SOP No.53 BSC audit for Traffic


Management

Recommendation: It is recommended that the adequate traffic signages


shall be fixed at the basement as per the defined SOP.

Findings/Observation no 10: Visitor management System (VMS) is not


effective and site is not maintaining log of the visitors.

Compendium of SOP deviation: SOP No. 35 Visitor management system

Recommendation: It is proposed that the existing VMS System shall be


automated and for the time being capture detail of visitors on manual basis
before granting entry to visitor. Also maintain record of visitor token/passes.

Findings/Observation no 11: Duplicate key box is being not maintained in


the SCR of building.

Compendium of SOP deviation: SOP No. 43, Key management system

Recommendation: It is recommended that the duplicate key box shall be


maintained as per the SOP of the compendium.

Findings/Observation no 12: No real time data of personnel inside in building


available in case of evacuation.

Compendium of SOP deviation: SOP No. 10, Emergency Evacuation Plan

Recommendation: It is recommended to stop the practice of allowing free


exit for all personnel. All personnel should be encouraged to punch their card
at turnstile while leaving the building. This will help in capturing real time
data.

Finding/Observations no 13: A boom barrier was not functional on site.

Compendium of SOP deviation: SOP No.4, Security infrastructure and


Access control: Design basis and SOP No. 52 Operation of Boom Barrier in
DLF Premises

Confidential
DLF NCR 1 Security Audit Report

Confidential Page 55 of 55

Recommendation: Security head to ensure that all security equipment heath


status be maintained and consult the concerned vendor for rectification as
part of preventive maintenance schedule.

Findings/Observation no 14: Security guards training not happening as per


the defined schedule and syllabus.

Compendium of SOP deviation: SOP No.1, Protection Force Management

Recommendation: It is recommended that SO shall define training schedule


in such a way that all security personnel should get chance for the training
on the subjects defined in the compendium of SOP.

18.3 Alignment with Compendium of SOP

DLF IT Park Chandigarh alignment with compendium of SOP: 77.78%

Confidential