Вы находитесь на странице: 1из 3

Appendices 7

Appendix A. Abbreviations and Acronyms

Appendix B. Macondo Casing Calculations

Appendix C. Testing of Cementing Float

Appendix D. Centralization Plan at Macondo

Appendix E. Review of Macondo #1 7” x 9-7/8” Production Casing Cementation

Appendix F. Lock-Down Sleeve Decision

Appendix G. Hydraulic Analysis of Macondo #252 Well Prior to Incident of April 20, 2010

Appendix H.

Appendix I. BOP Maintenance History

Appendix J. BOP Testing

Appendix K. BOP Leaks

Appendix L. Drill Pipe in the BOP

Appendix M. Structural Analysis of the Macondo #252 Work String

Appendix N. AMF Testing

Appendix O. Analysis of Solenoid 103

Appendix P. Deepwater Horizon Investigation: Gas Dispersion Studies

Appendix Q. Possible Ignition Sources

Вам также может понравиться