1. TAS achievement 2019 ---- 99.

32%

2. TAS Target 2019

TMD, GYELPOZHING
Sl. No Parameter Weightage
1 Capital Works 0%
2 Maintenance of Lines 40%
3 Controllable Budget 10%
4 Safety 10%
5 Quality 5%
6 Maintenance of Civil Infrastructures 5%
7 Data Reporting 5%
Physical verification of assets and inventories (fast, slow, non-
8 moving and obsolesce), adjustment of discrepancies on the 5%
books of accounts.
9 Implementation of Material / Stores Management 15%
10 Audit issues 5%
Total 100%

3: Evaluation criteria for Line Maintenance targets

Sl.
Particulars Target Rating
No.

Measure footing resistance of towers using TFR


Towers with high TFR to be
1. test kit and take action to keep the values 20%
rectified
within limits.

Measure actual line lengths using the Lines whose measurement has
2. 20%
Transmission Offline Fault Locator kit not been carried out

Conduct thermographic imaging of conductors,


3. insulators, clamps and connectors to prevent 10%
breakage of conductors, insulators, etc. Critical locations
Sl.
Particulars Target Rating
No.

Installation of polymer long rod insulator in one


4. One span of each voltage level 20%
span of each voltage level

Paint rusted structures with silicone based


5. Rusted towers 5%
SiCoat paint.

6. Conduct and submit GPS co-ordinates of towers For those towers not submitted 20%

7. Installation of AWS At required locations 5%

3. Issue
Land compensation of transmission tower
- It’s under process at head office