Академический Документы
Профессиональный Документы
Культура Документы
By
Amruta S. Sambarekar
Dept. Of Pharmaceutics
M.Pharm Ist Year
M.M.C.P,Belgaum
1
INTRODUCTION
3
Functions of
material management
5
Materials – Quality & Quantity
- Quantity
- Price RS.
8
Quantity
The function of purchasing department is to buy the
right quantity.
- Maximum inventory
- Minimum inventory
- Standard order
- Reorder point
11
Types
User value: Properties that accomplish use, work or
service. Ex: self-sealing tape.
- Lack of information
- Lack of ideas
- Wrong beliefs ,habits and attitudes
- Changed circumstances
14
Purchasing – Centralized &
Decentralized
Purchasing is an activity of securing the materials,
supplies, equipment & services required in the
operations of an enterprise.
15
Functions Of Purchasing Department
Advantages:
Advantages:
Disadvantages:
19
Vendor development
• Technological competition,
• service competition,
• price competition,
• delivery time.
24
Cont…
25
Negotiation and selection stage
o Categorical method
o Weighted point method
27
Categorical Method
Quality - 50 points
Delivery - 30 points
Price - 20 points
Total - 100 points
30
Cont…
31
Buying Techniques
They are not the purchase order. They just contain all the
details including taxes and many other costs.
33
Spot Quotations
Tenders
# single tender
# Open tender 35
Open Tender
40
PURCHASE CYCLE
41
Purchasing cycle and procedure
The purchasing department of the company is responsible
for the purchase of all the raw materials as well as the
requirements.
The following steps are followed in the purchasing cycle.
1) Recognition of need and receipt of requisition: The
requisition includes the following information:-
- Name
- Quality and quantity specifications
- Date by which material is required
- Place at which material is to be delivered
Feb 11, 2013 42
Dept of Pharmaceutics
2)Selection of potential sources of supply
3) Making request for quotation
4) Receipt and analysis of quotations
- Material specifications and quality
- Price of the material
- Taxes
- Terms of payement
- Place of delivery
- Delivery period
- Gurantee period
-Validity of tender
Feb 11, 2013 43
Dept of Pharmaceutics
5) Selection of right source of supply
6) Issuing the purchase order
7) Follow-up of the order
8) Receipt of materials,reports and analysis
9) Checking and approving of vendor’s invoice for payment
10) Closing of completed order
11) Maintenance of record and file
Purchasing cycle flow chart has been given in the
following slide.
Feb 11, 2013 44
Dept of Pharmaceutics
Quotations & analysis prices and terms, negotiations,
finalization
45
Cont…
Delivery of materials
Payment made
46
Stores management
Location of stores
Stores layout should be planned to achieve
following objectives:
Minimum wastage of spaces
Maximum ease of operation
Minimum other operational costs
Minimum handling costs
47
General functions of
the stores department
48
Specific functions of Stores
Department
49
Optional functions of
Stores Department:
50
SALVAGING AND DISPOSAL OF SCRAP AND
SURPLUS
52
Salvaging
54
Risks associated with improper
handling
56
FUNCTIONS OF MATERIAL HANDLING
Placement of equipment
57
SELECTION OF MATERIAL HANDLING
SYSTEMS
58
MAINTENANCE OF MATERIAL HANDLING
EQUIPMENT
Inspection
Repairs
Overhaul
59
UNIT LOAD, PALLETISATION AND
CONTAINERIZATION
60
Pallet is one unit load Unit load & palletizaton
these are moved to the
production department
by suitable handling
system.
Depending on the types
of item to be transferred,
a suitable pallet can be
designed. for example,
items of irregular in
shape are liable to be
damaged by crushing,
for such items, a post
pallet is useful. small
items can be placed in a
wire
02/11/13 mesh-box. 61
Containerization uses Containerization
the principle of unit
load. in this system, a
big metal container is
filled with a number of
small products. many
such containers are
placed on a truck or
trailer that is pulled by
tractor or truck. such
containers can be
loaded on railway
trailers & transported.
02/11/13 62
TYPES OF MATERIAL HANDLING
SYSTEMS
Conveyors Slides
Fork- lift Trucks Chute
Cranes Lifts
Hoists Tractors and Trailers
63
Conveyors
Belt conveyors are used in transporting
containers (bottles) for filling, capping, sealing,
labeling, pasting, visual inspection in
production of injectables, liquid orals, ointments
and jellies.
64
Belt conveyors
65
Fork- lift Trucks
66
Fork- lift Trucks
67
Cranes
68
Cranes
69
Slides Chute and Lifts
• Slides can be straight, spiral & vibrating, & made up of
wood or steel. These transfer small jobs that can slide
down under gravity. Vibrating slides transport
material up & inclined.(Example,cigar-ette factories )
• Chutes generally deliver the feed material directly onto
the conveyor to reach the destination further. Spiral
chutes are used for transporting sealed vials from
aseptic area to packing section using gravity principle.
• Lifts are used to transport material up in multi-storeyed
Plants. It is a fast & flexible equipment for floor to floor
Travel.
70
Slides Chute and Lifts
71
Tractors and Trailers
72
Tractors and Trailers
73
IMPORTANT QUESTIONS
1. What is HRD ? Explain about personnel training of job
spec ification. (Oct ’06, May 11)
2. Explain centralised & decentralised purchase
procedure (Oct’06, May 11)
3. Describe the material management in pharmaceutical
industries(Oct’09)
4. Explain the various material handling systems &
maintainance of material equipments in p’ceutical
industries.(May’ 10)
5. Explain personnel training, job specifications , job
enlargment & labour welfare. (Oct’09)
6. Explain stores management in p’ceutical industry.
(May 10)
74
REFERENCES
www.google.com
75
Thank You
76