8
W W
W W
www.TheCivilEngineering.com
D D
W W
6800 x 4000
HALL
D
W W
900
Formulas:
Length of Item = C/C Length of walls - 4 x (Breadth of Item / 2)
Length of Plaster = C/C Length of Walls - 4 x Breadth of Items
Plaster/BW for Parapet Walls = 2 x (C/C Length of Parapet in
X-Dir + C/C Length of Parapet Y-Dir)
LECTURED BY:
Engr WASEEM RAJA
COMPLETE BUILDING ESTIMATE - CENTERLINE METHOD
S# Description Nos
Length Breadth Height Quantity
om Remarks
1 Eearthwork Excavation
(m) (m) (m) (Cu.m)
g. c
Walls Foundation
Basement Stair Found
1
1
39.50
1.80
0.90
1.00
1.00
0.015
r in
35.550
0.027
### - 4 x 0.9 / 2 =
1.5 + 0.15 + 0.15
Net Excavation
ee 35.577
2 P.C.C (1:5:10)
g i n
n
Walls Foundation 1 39.50 0.9 0.3 10.665
Length of PCC same as
E
Basement Stair Found 1 1.80 1.00 0.015 0.027 Excavation
Net PCC (1:5:10)
v il 10.692
Ci
3 Random Rubble Masonary in CM (1:6)
h e
1st Footing
2nd Footing
1
1
40.10
40.30
0.6
0.5
0.3
0.4
7.218
8.060
### - 4 x 0.6 / 2 =
### - 4 x 0.5 / 2 =
. T
Basement 1 40.50 0.4 0.6 9.720 ### - 4 x 0.4 / 2 =
w
Net R.R Masonary 24.998
w
4 D.P.C (1:2:4) over
w
basement all around
the building
1 40.50 0.4 ---- 16.200
Length sould be same as
basement R.R masonary
m
5 First Class B/W in Walls
Sup/St with CM (1:6)
Parapet wall
1
1
40.70
30.40
0.30
0.30
3.00
0.6
36.630
5.472
. c o
### - 4 x 0.3 / 2 =
2 x ( 7.1 + 8.1 ) = 30.40
Total =
g
42.102
n
i
Deductions
Door 3 1.00 0.30
e
2.00
r
1.800
e
Windows 8 1.20 0.30 1.50 4.320
Lintel opening on Door 3
Lintel opening on Windows 8
g i
1.20
1.40 n 0.30
0.30
0.10
0.10
0.108
0.336
Asume 100mm projection
on either side
Basement Stairs
E n Total = 6.564
1st Step 1
he
T
v il
Ci
Net B/W Quantity
he Total = 0.405
35.943
. T
ww
6 R.C.C (1:2:4)
Roof Slab 1 7.40 8.40 0.15 9.324 Overall outside length
w
Lintel over Doors
Lintel over windows
Beams
3
8
1
1.20
1.40
40.70
0.30
0.30
0.30
0.10
0.10
0.30
0.108
0.336
3.663
Net R.C.C (1:2:4) 9.768
12
Colour washing with
two coats same as Same as per white wash 297.915
quantity of walls
plastering and ceiling
15 2% unforeseen items
39.50
CC same as
40.10
40.30
40.50
ld be same as
R.R masonary
40.70
30.40
mm projection
de
side length
40.10
30.40
3.3 3.8
W W
W W
www.TheCivilEngineering.com
D D
W W
6800 x 4000
HALL
D
W W
900
Formulas:
Length of Item = C/C Length of walls - 4 x (Breadth of Item / 2)
Length of Plaster = C/C Length of Walls - 4 x Breadth of Items
Plaster/BW for Parapet Walls = 2 x (C/C Length of Parapet in
X-Dir + C/C Length of Parapet Y-Dir)
LECTURED BY:
Engr WASEEM RAJA
COMPLETE BUILDING ESTIMATE - CENTERLINE METHOD
Length Breadth Height Quantity
S# Description Nos Remarks
(m) (m) (m) (Cu.m)
1 Eearthwork Excavation
Walls Foundation ### - 4 x 0.9 / 2 =
Basement Stair Found 1.5 + 0.15 + 0.15
Net Excavation
www.TheCivilEngineering.com
2 P.C.C (1:5:10)
Walls Foundation
Length of PCC same as
Basement Stair Found Excavation
Net PCC (1:5:10)
www.TheCivilEngineering.com
3 Random Rubble Masonary in CM (1:6)
1st Footing ### - 4 x 0.6 / 2 =
2nd Footing ### - 4 x 0.5 / 2 =
Basement Footing ### - 4 x 0.4 / 2 =
Net R.R Masonary
www.TheCivilEngineering.com
4 D.P.C (1:2:4) over
basement all around Length sould be same as
----
the building basement R.R masonary
12
Colour washing with
two coats same as Same as per white wash
quantity of walls
plastering and ceiling
15 2% unforeseen items
39.50
CC same as
40.10
40.30
40.50
ld be same as
R.R masonary
40.70
30.40
mm projection
de
side length
d in estimate
40.10
30.40