ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AMTZ VSPL PMPL
MATERIAL INSPECTION
RC Standard Drawing,Manufacturer
Equipment/Material Receiving inspection for HVAC 15820/15670,Material Instruction, Approved
equipment,duct & accessories,hanger/supports, Approval Material
1 QCF-001 P W S
Insullation, air terminal devices,Flexible Connection, submittal,Drawing,Relavant Submittal,Purchase
volume/fire dampers,Electrical Instument Materials. applicable Industrial Order,Project Specification,
Codes/standars. QCP/M.S
Project Specification, RC
Project
Storage,handling & Preservation of Above Standard
2 Specification,,Manufacturer QCF - 113 P W S
material/Equipment for HVAC System. 15820/15670,Manufacturer
Recommendation.
instruction.
Page 1 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AMTZ VSPL PMPL
RC Standard
15820/15670,SMACNA
Standards,Project
Duct accessories, duct heater, Volume Approved
specification, drawing,QCP
4 Damper,sound alternator,Flow grid inspection,fire Drawing,SMACNA QCF - 117 P W S
Relavant applicable
damper. Standard QCP
industrial code &
standards, Manufacturer
installation manual.
RC Standard
15840,SMACNA
Standards,Project
Approved
Installation of air terminal device, Flexible specification, drawing,QCP
5 Drawing,SMACNA QCF - 118 P W S
connections. Relavant applicable
Standard QCP
industrial code &
standards, Manufacturer
installation manual.
Project Specification, RC
Standard 15820, IFC Drawing,Manu
Codes/relavant applicable Instru,RC Standars AS PER VENDOR
6 Functional test of Fire Damper. P W W
Industrial codes & 15820,Project FORM
standards, Manufacturer Specification.
manual.
Page 2 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AMTZ VSPL PMPL
RC Standard 15820 /
15670,QCP ,Project
Check for Leak Test for Duct Installation, by
specification,Relavant
9 conducting light test Method Vendor QCF-119 P W W
applicable codes/standards
recommendation,SMACNA
Manufacturer Instruction
Standards, RC Standard.
manual.
EQUIPMENT INSTALLATION
Page 3 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AMTZ VSPL PMPL
RC Standard 15820/15670,
QCP Project
SMACNA HVAC Duct
Pre-Commissioning Check for HVAC System specification,Relavant
construction Standard, AS PER VENDOR
11 Includes package equipment duct, Volume / Fire applicable Industrial P W W
Manufacturer FORM
dampers, Electrical / Instrumentations. codes/standards
Recommendation.
Manufacturer Installation
manual.
RC Standard 15840,
Project
Final visual Inspection of HVAC System includes
specification,Relavant Vendor recommendation
identification tag for equipment, Volume / Fire
12 applicable SMACNA standards, RC QCF-121 P W W
Dampers, Air flow direction on the Duct Air terminal
codes/standards standards 15820/15840
devices.
Manufacturer Installation
manual.
Vendor recommendation
Testing & Balancing: Perform by HVAC third party / Third party testing AS PER VENDOR
13 SMACNA standards, RC P W W
Vendor. procedures. FORM
standards15720/15730,
INVOLVEMENT
INVOLVEMENT INTERVENTION CODES
AMTZ - Andhra Med Tech Zone VSPL - P - Perform W - Witness (RFI required)
An inspection point, defined in an appropriate document, beyond which an activity can proceed after notifying the designated organization or
Witness Point (W)
authority. Contractor's QC Inspector has full responsibility for performing detailed inspections during the work activity.
Part of the Work, defined in an appropriate document that cannot proceed until it has been inspected and certified by the signature of the
Hold Point (H)
appropriate authority.
Continual monitoring and verification of the status of an entity and analysis of records to ensure that the Contract specified requirements are
Surveillance (S)
fulfilled
Page 4 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AMTZ VSPL PMPL
Performance (P) Inspection and test performed by Subcontractor / SETE Inspector and/or Site Engineer or the approved Independent Inspection Agency
A review point, defined in an appropriate document, Done by SETE or the point at which a work activity cannot proceed without first ensuring the
Review Point ( R )
review and approval of applicable documents or personnel qualifications by a designated organization or authority.
Page 5 of 9
CUSTOMER POWER AND WATER UTILITY COMPANY FOR JUBAIL & YANBU (MARAFIQ)
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AKWAN Q M.E MFQ
MATERIAL INSPECTION
RC Standard Drawing,Manufacturer
Equipment/Material Receiving inspection for HVAC 15820/15670,Material Instruction, Approved
equipment,duct & accessories,hanger/supports, Approval Material
1 QCF-001 P W S S
Insullation, air terminal devices,Flexible Connection, submittal,Drawing,Relav Submittal,Purchase
volume/fire dampers,Electrical Instument Materials. ant applicable Industrial Order,Project
Codes/standars. Specification, QCP/M.S
Project Specification,
Project
Storage,handling & Preservation of Above RC Standard
2 Specification,,Manufact QCF - 113 P W S S
material/Equipment for HVAC System. 15820/15670,Manufactu
urer Recommendation.
rer instruction.
RC Standard
15820/15670,SMACNA
Standards,Project
Duct accessories, duct heater, Volume specification, Approved
4 Damper,sound alternator,Flow grid inspection,fire drawing,QCP Relavant Drawing,SMACNA QCF - 117 P W S S
damper. applicable industrial Standard QCP
code & standards,
Manufacturer
installation manual.
Page 6 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AKWAN Q M.E MFQ
RC Standard
15840,SMACNA
Standards,Project
specification, Approved
Installation of air terminal device, Flexible
5 drawing,QCP Relavant Drawing,SMACNA QCF - 118 P W S S
connections.
applicable industrial Standard QCP
code & standards,
Manufacturer
installation manual.
Project Specification,
RC Standard 15820, IFC Drawing,Manu
Codes/relavant Instru,RC Standars AS PER
6 Functional test of Fire Damper. P W W S
applicable Industrial 15820,Project VENDOR FORM
codes & standards, Specification.
Manufacturer manual.
AS PER
HVAC Electrical & Instrumentation Material
7 Project Specification RC Specification ELECTRICAL P W S S
Receving Visual Inspections
ITP
RC Standard 15820 /
15670,QCP ,Project
Check for Leak Test for Duct Installation, by specification,Relavant
Vendor
9 conducting light test Method applicable QCF-119 P W W S
recommendation,SMAC
codes/standards
NA Standards, RC
Manufacturer Instruction
Standard.
manual.
EQUIPMENT INSTALLATION
RC Standard
15820/15670, QCP
Project SMACNA HVAC Duct
Pre-Commissioning Check for HVAC System
specification,Relavant construction Standard, AS PER
11 Includes package equipment duct, Volume / Fire P W W S
applicable Industrial Manufacturer VENDOR FORM
dampers, Electrical / Instrumentations.
codes/standards Recommendation.
Manufacturer
Installation manual.
RC Standard 15840,
Project
Final visual Inspection of HVAC System includes Vendor recommendation
specification,Relavant
identification tag for equipment, Volume / Fire SMACNA standards,
12 applicable QCF-121 P W W S
Dampers, Air flow direction on the Duct Air terminal RC standards
codes/standards
devices. 15820/15840
Manufacturer
Installation manual.
Vendor recommendation
Testing & Balancing: Perform by HVAC third party / Third party testing SMACNA standards, AS PER
13 P W W S
Vendor. procedures. RC VENDOR FORM
standards15720/15730,
INVOLVEMENT
INVOLVEMENT INTERVENTION CODES
AKWAN - Construction Department MFQ- MARAFIQ Project Mgmt Team (Representative) P - Perform W - Witness (RFI required)
An inspection point, defined in an appropriate document, beyond which an activity can proceed after notifying the designated organization or
Witness Point (W)
authority. Contractor's QC Inspector has full responsibility for performing detailed inspections during the work activity.
Part of the Work, defined in an appropriate document that cannot proceed until it has been inspected and certified by the signature of the
Hold Point (H)
appropriate authority.
Continual monitoring and verification of the status of an entity and analysis of records to ensure that the Contract specified requirements are
Surveillance (S)
fulfilled
Performance (P) Inspection and test performed by Subcontractor / SETE Inspector and/or Site Engineer or the approved Independent Inspection Agency
A review point, defined in an appropriate document, Done by SETE or the point at which a work activity cannot proceed without first ensuring
Review Point ( R )
the review and approval of applicable documents or personnel qualifications by a designated organization or authority.
Page 8 of 9
ITP FOR HVAC(HEATING VENTILATION AND AIR CONDITIONING) SYSTEM INSTALLATION DATE: 20-02-2012
Rev No: A
ITEM
No. Inspection & Testing Description Acceptance Criteria Reference Document QC Checklist Remarks
AKWAN Q M.E MFQ