CHEMICAL TREATMENT CONTROL SHEET December 2010

JOFRA FIELD

Field: JOFRA Date: January 27, 2011


Company: HAROUGE OIL OPERATIONS
Attention: PROD. SPV. JOFRA FIELD
Copy to: PROD DEPT./ INSTR. SECT. JOFRA, ELECTRICAL DEP. JOFRA, FILE

Treatment Inj. Tank Top up


Location Chemical QPD status level% tank
REMARKS

CORROSION CONTROL
Main Stn. Prod. Sep. EC1180A -
" Test Sep. " -
Main St. prod + JJ Line to Tank EC1213A -
JJ Stn. Bulk Separator EC1180A 5 ok
50
" Test Separator " 1 ok
" Tanks Upstream EC1213A 3 ok 85
DEMULSIFICATION
Main Stn. Prod. Sep. -
EC-2168A

" Test Sep. -


JJ Stn. Bulk Separator 8 ok
" Test Separator 1

Production rates 9/30/2008 Dem. Dosage Crude Quality test results 22/11/2010
Location Crude Water Gross EC-2168A BS&W
Shipping Salinity API gravity
bls/day (ppm) %
Main St. - - - - Main Stn. - - -
JJ St. 747 3067 3814 12 JJ Stn. 26.3 0.15 40.0
TOTAL 747 3067 3814
Actual Target

ppm ppm
### 8

### 20
7.8 8

23.9 20

### 10

12.5 12
CHEMICAL TREATMENT CONTROL SHEET

TIBISTI FIELD
Field: TIBISTI Date: 22-Jan-11
Company: HAROUGE OIL OPERATIONS
Attention: TIBISTI FIELD SPT.
Copy to: PROD. Spv; Prod Eng.; Corrosion; Instrument Sect.; Planning / TIBISTI

Treatment Inj. Tank Top up


LOCATION REMARKS
Chemical QPD status level % tank
CORROSION CONTROL
Main Stn. Prod. Sep. 1 EC1180A 10
" Prod. Sep. 2 " - maintenance work at separation vessele NO. 2
" Test Separator " 2
Main Stn. Prod. Sep. 1 EC6165A 11 OK
" Prod. Sep. 2 " - OK
" Tank Inlet EC1213A 19 OK
HH Station Prod. Sep. EC1180A 2 OK
" Test Sep. " 2 OK
" Tank Inlet EC1213A 2 OK
CC Station Prod. Line EC1180A 2 OK
" Test Sep. " 1 OK
Wellside DD - 1 EC1180A 1 OK
" BB - 1 EC6165A
S/B
" " JV 010
" I-1 EC1181A
S/B
" " EC6165A
" I-2 EC1181A 11 OK
" " EC6165A 6 OK
" I - 41 EC6333A 4 OK
DEMULSIFICATION
Main Stn. Prod. Sep. 1 18
" Prod. Sep. 2 - maintenance work at separation vessele No. 2
" Test Separator 2
HH Station Prod. Sep. 1 OK
" Test Sep. 1 OK
CC Station Prod. Line 1 OK

Pumps to be checked (maintenance required): Chemical stock at Yard

Chemical drum Chemical drum


EC-1180A 7 EC-6165A 9
EC-1181A 17 JV-010 9
EC-1213A 4 EC-6333A 4
EC-6198A 12 EC-2168A 0

Crude Oil Quality Tests

Location Salt (PTB) BS & W% API


Main Stn. Shipping L. 8.3 0 48.0
HH Stn. Prod. Sep. N/A N/A N/A
CC Stn. N/A N/A N/A

Productions Crude Water Gross Crude Water Gross


0n November 23 HH St 452 11 463 I1 0
(Bbls/day) CC St 99 260 359 I2 120 1280 1400
Main St 1905 3834 5739 BB1 0
TOTAL: 2456 4105 6561 DD1 99 260 359

Net crude oil shipped: Note:

Tibisti Prod: 2456 bls/day


Dor Marada: 2857 bls/day
Shipped: 5313 bls/day

Nalco Rep: Nabil Aliwan


CHEMICAL TREATEMENT CONTROL SHEET

EN NAGA FIELD
Field: EN NAGA Date: 1/24/2011
Company: HAROUGE OIL OPERATIONS
Attention: EN NAGA FIELD SUPERINTENDENT
Copy to: PROD. SUPERVISOR, PLANNING / EN NAGA; FILE

Treatment required Tank Injection REMARKS


LOCATION
Chemical quarts/day level cm status actual injection status
CORROSION CONTROL
B-1B 7 OK
EC-1180A

B-5 7 OK
B-6 S/B
B-7 S/B
B-9 OK
Q-2 5 S/B
TOTAL Injection: 19
LP separator EC-1213A 12 120 OK
PARAFFIN CONTROL
HP separator 10 OK
EC-6333A 90
Shipping line 20 OK
OXYGEN SCAVENGER
Pl. Water Tank EC-6213A 15 104 OK
BIOCIDE APPLICATION
Test separator 4 L/hour OK
JV 010 100%
HP separator 28 L/hour OK
SCALE CONTROL (RAW WATER)
Raw water inl. N-7399 5 50%

Comments: The above dosing rates are calculated for the actual productions Chemical stock Drum

EC-1180A Corrosion inhibitor maintaned at 18 ppm of dosage at W/H locations


EC-1213A Corrosion inhibitor is injected at upstream of LP separator EC-2216A 6
EC-2216A Demulsifier is injected at opstream of Test, HP, LP Separators and Q1 WellHwed location.
EC-1180A 8
EC-6333A Recommended dosage depending on the operational and weather conditions. EC-1213A 2
EC-6213A Oxygen scavenger application introduced at upstream of Plant Water Tank A-22F 0
JV 010 Biocide application introduced at upstream of Manifolds. EC-6333A 4
N-7399 12
EC-6213A 14
JV 010 1

Note:
It's highly recommended to start chemical treatment at well B-12 Dosing rates ppm

EC-1180A 12
EC-1213A 10

The actual welltest data: production bls/day

WELL Crude Water Total WELL Crude Water Total


B-1B 106 63 169 B-8 0 0 0
B-1Z 447 0 447 B-9 0 0 0
B-3 260 0 260 B-12 488 1055 1543
B-4 0 0 0 B-13 1162 108 1270
B-5 1314 104 1418 B16 277 0 277
B-6 0 0 0 J-1-85 0 0 0
B-7 0 0 0 Q-2 2776 740 3516
B-20 440 0 440
Total 7270 2070 9340

Nalco Rep: Nabil Aliwan


RKS
on status
EC-1149A
L/day ml/min round number
0.34 0.24 1
0.90 0.63 1
0.44 0.30 1
0.00 0.00 1
2.86 1.98 3
19 qts/day 12 ppm 0.00 0.00 1
12 qts/day 10 ppm 0.00 0.00 2
0.00 0.00 0
0.00 0.00 0

3.11
2.56

0.56 0.39 0
10.21
3.54 10
NALCO CHEMICAL TREATMENT

GHANI FIELD

Field: GHANI Date: 1/4/2012


Company: HAROUGE OIL OPERATIONS
Copy to: GHANI/ZENAD/GIR FACHA/TAGRIFET OPERATORS, FILE

Treatment Inj. REMARKS


LOCATION
Chemical QPD status Injection pump status
CORROSION CONTROL
Ghani Group Separator A 2 OK
" Group Separator B 11 OK
EC1180A
" Test Separator A 2 OK
" Test Separator B
" Heater A 2 "
EC6146A
" Heater B 12
" Wash Water Line EC6213A 45 "
RRR 13 & 17 6" Prod Line 2 OK
RRR 13 & 17 14" Prod Line 17 "
EC1180A
" Test Sep. 1 "
RRR 30 7
RRR 17 Manifold EC9242A 31 OK
Ed Dib Prod Line 9 OK
" Test Sep. EC1180A 1 "
" GG 2
" GG 1 EC6165A
Zenad Sweet Sep. 402 7 OK
EC1180A
" Test Line 2 "
" Gas Boot Inlet EC1213A 72 "
" Heater-Treater 411 6 OK
" Heater-Treater 412 EC6146A 28
" Heater-Treater 424 "
Tagrifet Prod. Sep. 4
" Test Sep. 1 "
" Gas Boot Inlet EC1180A 3
" TTT 5 M Prod. Line 1 "
" TTT 5 M Test. Line 1 -
Facha Prod. Sep. 2 OK
" Test Sep. EC1180A 1 "
" Gas Boot Inlet 2 " Chemical Treatment Suspended

Location Bbls/day
Ghani Separator A 1,167
Ghani Separator B 10,372
Ghani test A&B
Zenad Sweet Sep 402 6,643
Heater-Treater 411 4,552
Heater-Treater 412 18,825
Heater-Treater 424
RRR 13 & 17 (6" line) 1,201
RRR 13 & 17 (8" line) 11,713
RRR 30 5,018
Ed Dib 6,394
Tagrifet
Facha
Total net oil 33,478 Nalco Rep: Nabil Aliwan- Emad Hamoda
CHEMICAL TREATMENT CONTROL SHEET

FARRUD & GIR PRODUCED WATER INJECTION

Field: Ghani Date: 10-Aug-09


Company: HAROUGE OIL OPERATIONS
Treatment Inj. Pump Injection Tank
REMARKS
Chemical ppm rate:L/hour status level %

GHANI CPF, PRODUCED WATER


EC6165A Scale Inh. 10 0.2

EC1180A Corr. Inh. 10 0.2

EC6029A Rev. Dem. 10 0.2 Not in use

EC6213A Oxygen Scav. 5 0.1

96JV010 Biocide 75 1.2 During shock treatment: 500 ppm

EC6176A Filter Aid 1 Not in use

ZENAD PRDUCED WATER


EC6165A Scale Inh. 10 0.1

EC1180A Corr. Inh. 6 0.1

EC6029A Rev. Dem. 10 0.1 Not in use

EC6213A Oxygen Scav. 5 0.1

96JV010 Biocide 75 1.0 During shock treatment: 500 ppm

FARRUD WATER INJECTION FS


A-22-F Surfactant 25 - 175 During backwash

96JV010 Biocide During shock treatment: 500 ppm

EC6176A Filter Aid 1 0.3

EC6029A Rev. Dem 0.25 0.1 Not in use.

GIR WATER INJECTION FS


N-71605 Polielectrolite 1.2 0.3

96JV010 Biocide During shock treatment: 500 ppm

EC6176A Filter Aid 1 0.1 Not in use

EC1149A Corr. Inh. 10 1.0

EC6165A Scale Inh. 10 1.0 Not in use.

EC6213A Oxygen Scav. 5 0.5

Ghani Produced Water 2,500 bbls/day


Zenad Produced Water 2,000 bbls/day
Augila Water 35,400 bbls/day
Farrud Water Injection FS 39,700 bbls/day
Gir Water Injection Plant 15,500 bbls/day