HAJI SHEIK ISMAIL ENGINEERING COLLEGE, ESANOOR - 611 103

Reg. No

IAT -II
DEPT: MECHANICAL ENGINEERING
DATE: 25-02-2019
SUB. CODE & SUB. NAME: IE 6605 – PRODUCTION PLANNING & CONTROL
YEAR/SEM: IV/ VIII
Max.Marks:100
PART –A 10x2=20 marks

1. State the need for Product Planning?

2. Define Value Analysis?

3. State the main functions of Process Planning?

4. What is meant by Line Balancing?

5. What are the steps in Process Planning?

6. What is Master Scheduling?

7. List out any Five Priority Sequencing Rules.

8. What are the different techniques of Loading & Scheduling?

9. What is meant by Kanban System?

10. Define Dispatching?

PART-B
5x13=65marks

11.a) What is Value Analysis? Describe the basic steps involve in the Value Analysis. (13)
(or)
b) What do you understand by Machine Balancing? Also explain the effect of Balancing on
number of machines required with an illustration. (13)
12. a) What are the various steps followed during Process Planning? (13)
(or)
b) Explain the phrase “Extending the original Product information” with suitable examples.
(13)
13. a) Explain the analysis of Process Capabilities in a Multi Product System. (13)
(or)
b) Write short notes on the types Scheduling Techniques. (13)

14. a) Explain the Process flow involved in Master Scheduling. (13)


(or)
b) What is Progressing? Explain its function. Also write short notes about ‘Recording
Progresses’ (13)

15. a) What are the components of Material Requirement Planning (MRP)? (13)
(or)
b) Discuss Periodic Batch Control. (13)

PART-C
1×15=15 marks

16. What are the functions of Dispatching? Explain the various documents raised by the Dispatcher.
(15)