Вы находитесь на странице: 1из 8

Design & Build Package: Indore Metro Phase 1 Elevated

RTC No.: Indore 02A/01 /

Document No.: IN-P02A-STR-PRO-DRS-0005

Reference No.: DBL/MPMRCL/Indore-Metro/2019/22 dtd. 13/02/2019

Document No.: -

Submission of Credentials of M/s Henan Shenghua Heavy Crane Co. Ltd

Submission Attributes

Submission part of: Purpose of Submission

Detailed Design Stage 1: SoNO:

Detailed Design Stage 2: Approval:

Others Others:

First Submission: ✘
Reference Contract Clause for

Repeated Submission: Vol. _______________ Sub Cla

Submission No.: __________ (if applicable) Related Contract Clause:

Vol._______________ Sub Clau

Status of previous submissions (if applicable)

Page 1 of 8
Submission No.: _______________________ NOWC/Approval with Commen

DVE Certificate (for this submission only)

Date:____/_____/_____ Signature:

Status SoNO/Approval by the Engineer (for this submission only)

Date:____/_____/_____ Signature:

SoNO NOWC:

Approved Approved with Comments

Others _________________________________________________

Approved for DC1:

Approved for DC1 with Conditions: Conditions:

Approved for DC2:

Approved for DC2 with Conditions: Conditions:

Total no. of pages: 2 including this cover page and without Appendix

Page 2 of 8
Indore Metro Project - Phase I
Package-02A/01

Engineer Document Review Sheet

2018

tes

pose of Submission

erence Contract Clause for SoNO/Appr.:

_______________ Sub Clause __________

ated Contract Clause:

_______________ Sub Clause___________

Page 3 of 8
Fai Ot
WC/Approval with Comments he
l
r
mission only)

Stamp:

for this submission only)

Stamp:

FAIL ✘

Not Approved

______________________

Page 4 of 8
Indore Metro Project
Package 02A/01
Engineer Document Review Sheet

PROJECT: Indore Metro Project - Phase 1 PROJECT NO.:


DRS NUMBER: IN-P02A-STR-MAN-DRS-0006 REV.: 0 DATE:
ORIGINATOR: General Consultant TRANSMITTAL NO. / DATE:
DOCUMENT NO.: REV.: 0 DOCUMENT TYPE:

DOCUMENT TITLE: Submission of Credentials of M/s Henan Shenghua Heavy Crane Co. Ltd DISCIPLINE:

Comment Code Legend (for individual comments): Reply Code Legend


1 = Action required for this issue 3 = to be addressed at DD2 i=incorporated, ii= evalua
2 = advisory comment reason stated
Comment Reply
No. Initial Page/Section Reviewers Comments (PMC/CPO, CTO) D&B Con
Code Code
Goals and Oblective of BIM Manual to be defined w.r.t Elevated Viaduct package..
1 KMR Pg. 3/ 1.1 & 1.2 1

2 KMR Pg. 3/ 1.5 1 Aim of the BIM manual has to be corrected for Indore Metro rail project.
An Organisation chart depicting the Roles of Personnels defined under section 1.9 should be
3 KMR Pg. 7/ 1.9 1 attached.
The responsibilities defined under Cl.1.4 of Vol.IV Technical Specifications, should be explained
4 KMR Pg. 7/ 1.9 1 in BIM manual w.r.t the deliverables of Elevated Vidauct.
Coordination and Integration should be corrected for disciplines covering Elevated Viaduct only.
5 KMR Pg. 25/ 2.12.3 1

6 KMR Pg. 26/ 2.13 1 Deliverables of BIM shall be given in detail w.r.t Elevated Viaduct.
Status Code Legend:

A.        Approved C.        SONO
Document Review Status Code: E
B.        Approved with comments D.        NOWC: No Objection with comments

General Consultant

COMMENTS/STATUS
Reviewer’s Name Position
RECOMMENDED BY PMC

Engineer Document Review Sheet 5


Indore Metro Project
Package 02A/01
Engineer Document Review Sheet

PROJECT: Indore Metro Project - Phase 1 PROJECT NO.:


DRS NUMBER: IN-P02A-STR-MAN-DRS-0006 REV.: 0 DATE:
ORIGINATOR: General Consultant TRANSMITTAL NO. / DATE:
DOCUMENT NO.: REV.: 0 DOCUMENT TYPE:

DOCUMENT TITLE: Submission of Credentials of M/s Henan Shenghua Heavy Crane Co. Ltd DISCIPLINE:

Comment Code Legend (for individual comments): Reply Code Legend


1 = Action required for this issue 3 = to be addressed at DD2 i=incorporated, ii= evalua
2 = advisory comment reason stated
Comment Reply
No. Initial Page/Section Reviewers Comments (PMC/CPO, CTO) D&B Con
Code Code

Karthik.M.R Design Expert Name: Gabriele Tidone Name

Position Engineer Position

Date: Date:

Engineer Document Review Sheet 6


Indore Metro Project
Package 02A/01
Engineer Document Review Sheet

Indore 02A/01
29/Mar/2019
DBL/MPMRCL/Indore-Metro/2019/22 dtd. 13/02/2019
MAN

STR

Reply Code Legend


i=incorporated, ii= evaluated and not incorporated for
Open/Closed
reason stated
Reply Status by
D&B Contractor/Other Party Reply
Reviewer

C.        SONO E.        Fail/Not approved


F.        
D.        NOWC: No Objection with comments Responded/Reviewed/Actione
d
D&B Contractor

REPLY APPROVED BY

Engineer Document Review Sheet 7


Indore Metro Project
Package 02A/01
Engineer Document Review Sheet

Indore 02A/01
29/Mar/2019
DBL/MPMRCL/Indore-Metro/2019/22 dtd. 13/02/2019
MAN

STR

Reply Code Legend


i=incorporated, ii= evaluated and not incorporated for
Open/Closed
reason stated
Reply Status by
D&B Contractor/Other Party Reply
Reviewer

Engineer Document Review Sheet 8