Вы находитесь на странице: 1из 2

1305 Engineering and Construction Ltd.

Quotation No; 1305/18/12

Cost of Services

Total
Item Description Unit
Quantity

1.00 Land Acquition

1.10 Front End Engineering Ea 1.00

1.20 Project Cost Estimation Ea 1.00

1.30 Other Professional Charges Ea 1.00

1.40 Administrative Charges Ea 1.00

1.50 Travel-related costs, lodging, meals Ea 1.00

1.60 Data collection Ea 1.00

Renovation Works @Kejebri Page 1


1305 Engineering and Construction Ltd. Quotation No; 1305/18/12

UR (USD) Amount (USD)

250,000.00
120,000.00 120,000.00

15,000.00 15,000.00

50,000.00 50,000.00

25,000.00 25,000.00

25,000.00 25,000.00

15,000.00 15,000.00

Renovation Works @Kejebri Page 2

Вам также может понравиться