OPPORTUNITY ASSESSMENT
COMPANY INFORMATION ENERGY INFORMATION PROJECT PARAMETERS
Company Name: 1. Electric Utility: 10. What is the building type:
______________________________________ ______________________________________ Office Education
______________________________________ Industrial Warehouse
2. Gas Utility: Faith-based Lodging
What is the name of your facility? ______________________________________ Food Service Service
______________________________________ Health Care Other
3. What is the total annual kWhs used by the facility?
Facility Address: ______________________________________ 11. What is the square footage of the facility?
______________________________________ ______________________________________
______________________________________ 4. What is the total annual Therms used by the facility?
______________________________________ 12. What is the square footage of the facility that is:
Company Contact Name: Heated_________________________
______________________________________ 5. What percentage of the utility budget is: Air Conditioned __________________
Electricity _________________________
Company Contact Phone Natural Gas _______________________ 13. What is the number of floors in the facility
(including those below grade)?
______________________________________ Steam ___________________________
______________________________________
Other ____________________________
Company Contact Email
14. How old is your facility or what year was your facility
______________________________________ 6. What is the estimated percent use reduction that you
built?
hope to achieve?
______________________________________
Electricity _________________________
Registered Service Provider (RSP)
Natural Gas _______________________
______________________________________
15. What is the annual hours of operation of the
Steam ___________________________
facility?
Other ____________________________
RSP Contact Name: ______________________________________
______________________________________
7. What is the estimated cost of the
16. What is the fuel source for the heating of domestic
Retrocommissioning (RCx) Audit?
water?
RSP Contact Phone:
______________________________________
Electric Steam
______________________________________
Natural Gas Other
8. What is the estimated start date of the RCx Audit?
RSP Contact Email:
______________________________________
17. What is the fuel source for the building heat?
______________________________________
Electric Steam
9. What is the estimated completion date of the RCx
Natural Gas Other
Audit?
______________________________________

PAGE 1
OPPORTUNIT Y ASSESSMENT

RETROCOMMISSIONING
PROGRAM

PROJECT PARAMETERS - CONT. 22. How would you describe your current building 27. What is the current age of the majority of your
maintenance capabilities? equipment?
18. What are the measures that will be investigated as
part of your project? Building personnel do not provide any operations More than 12 years old
or maintenance support.
Air Handler Optimization Less than 12 years old
Building personnel provide only maintenance
Chiller Optimization
support.
Compressed Air Optimization 28. How would you describe the frequency of problems
Building personnel provide only operations
in your key mechanical equipment?
Lighting Sensor/Controls Optimization support.
No problems identified
Pump and Motor Savings Building personnel provide operations and
maintenance support. Infrequent mechanical problems
Industrial Processes
Recurrent mechanical problems
Domestic Water Heating Systems
23. How would you describe your building operators'
Building Controls
current level of controls capabilities?
29. How would you describe current occupant
Building personnel do not support our controls complaints about overall comfort and indoor air
OPPORTUNITY SCREENING system. quality?
19. How would you describe your current energy policy? Building personnel have basic control over system Few complaints from occupants about comfort.
capabilities.
We don't have an energy policy. Many complaints from occupants in isolated areas
Building personnel have advanced control system about temperature, odor, and/or noise.
We have an energy policy but it lacks goals or
capabilities.
processes for meeting them. Many complaints from occupants through the
building about temperature, odor, and/or noise.
We have an energy policy that includes goals and
processes for meeting them. 24. What documentation is currently available (blue
prints, balance reports, sequence of operations
30. Which type of air handling unit (AHU) is most
schedules, etc.)?
common in your facility?
20. What is your current approach to analyzing your
No documentation is available.
energy bill to track cost and usage? Unit Vents
Some documentation, but it is not complete.
Energy use and cost metrics are not tracked. Make-up Air Units
Energy use is tracked and may be reviewed All documentation is available and it is up-to-date. Rooftop Units
regularly.
AHU Units
Energy costs are tracked and may be reviewed 25. What type of preventive maintenance is performed Rooftop Unit or Air Handling Unit with Heat
regularly. at your facility?
Recovery
Both energy use and costs are tracked and Preventive maintenance is not performed (except
reviewed at least annually. for filter changes).
31. Which type of ventilation distribution is most
Scheduled preventive maintenance is performed
common in your facility?
21. What level of funding is your management willing to for mechanical systems only.
commit to energy saving recommissioning projects? Constant Volume
Scheduled preventive maintenance is performed
There is no funding available on mechanical and control systems. Variable Air Volume (VAV)
Less than $5,000 per year 26. Overall, what are your plans for mechanical retrofit VAV with Occupancy Sensor
projects?
Less than $10,000 per year
We have completed a mechanical retrofit project in
Over $10,000 per year 32. Which type of economizer is most common in your
the last two years.
facility?
We plan to complete a mechanical retrofit project
No Economizer
sometime in the next two years.
Water-side Economizer
We do not have any plans to complete a
mechanical retrofit project in the next two years. Air-side Economizer

PAGE 2
OPPORTUNIT Y ASSESSMENT

RETROCOMMISSIONING
PROGRAM

OPPORTUNITY SCREENING - CONT. 37. What level of building controls is currently in use?
33. Which type of heating system is most common in Central plant only
your facility?
Central plan and air handling units, roof top units,
District Steam Heating etc.
Steam Boilers All equipment including zone level
Direct-fire Roof Top Unit (RTU) All equipment including zone level and lighting
Hot Water Boilers
Condensing Hot Water Boilers
38. What type of building scheduling is currently in
use?
34. Which type of cooling system is most common in Scheduled to match occupancy with optimum start
your facility? programs in place
No Cooling or District Cooling Scheduled to match occupancy with preset warm-
Packaged Direct Expansion (DX) Units up time

Custom Air Handling Units No scheduling program exists


Air Cooled Chiller
Water Cooled Chiller 39. What type of trending data is currently available?
No trending data available
35. How would you describe your current controls for Trending data is available but not set up to trend
your lighting systems? specific points
This facility's lighting system has been recently A majority of points are trended with look-back
upgraded and is controlled by the facility's capabilities
Emergency Management System (EMS) or other
control system.
The majority of the facility's lighting system has not
been upgraded within the past three years but it
is controlled by the facility's EMS system or other
control system.
This facility's lighting system has been recently
upgraded but it is manually controlled by staff.
The majority of the facility's lighting system has not
been upgraded within the past three years and no
controls are present.

36. What type of building controls are currently in use?


Local controllers or all-pneumatic controls
Direct Digital Control (DDC) with pneumatic
actuation

DDC with digital actuation

SAVING ENERGY AND MONEY


FOR WISCONSIN

Focus on Energy, Wisconsin utilities’ statewide program for energy efficiency and renewable energy, helps
eligible residents and businesses save energy and money while protecting the environment. Focus on Energy
information, resources and financial incentives help to implement energy efficiency and renewable energy
projects that otherwise would not be completed.
©2014 Wisconsin Focus on Energy

TM_RCX_OA_090214