(c) General Matters (continued)

CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


INFORMATION
18. Injury to Persons and 1. Responsibility of the Item
Damage to Property Contractor for injury to
persons and damage to
property including public
or private roads

19. Insurances, etc. 1. Insurances against or Item


allowances to be made
Requirements in respect
of the following
insurances are given:
(a) Fire and extraneous
perils Contractors’ all
risks insurance of the
Works
(b) Injury to persons and
property Third party
liability insurance
(c) Workmen's
Employees’
compensation insurance
(d) Any other items of
insurance or guarantee
required by the
Conditions of Contract or
the Employer
2. Special requirements in
respect of minimum
acceptable limits of
liability and excesses are
stated.
3. Where insurances are to
be extended to cover
professional fees,
particulars are given.

14
III PRELIMINARIES 15

(c) General Matters (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
20. Provisional and Prime 1. Provisional and Prime Prov'l 1. Where the cost of
Cost Sums Cost (P.C.) Sums and Sum cartage, unloading,
the method of adjustment storing and returning
------- packing material is to be
P.C. included in the sum, it is
Sum so stated.

21. Conditions of Payment 1. Conditions of payment Item


22. Surety or Bond 1. Any surety or bond Item
required by the Employer

23. Watching 1. Care of the Works Item


generally, employment of
watchmen and protective
lighting
24. Protection 1. Protection of the work Item
and materials from
weather
2. Casing or covering up
and protecting
25. Treasure, Trove, 1. Disposal of any treasure Item
Coins, etc. Antiquities trove, coins or objects of
antiquity
26. Variations and Method 1. Particulars relating to Item
of Measuring and variations and the orders
Valuing for and method of
measuring and valuing
the same
2. Particulars relating to
dayworks accounts
27. Samples 1. Submission of samples Item

28. Testing of Materials 1. Conditions relating to the Item


testing of materials
(c) General Matters (continued)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
29. Removal of Water 1. Keeping the site and all 1. Water levels, where Item C.1 applies. S.1 Dewatering
excavations thereon free known, are stated. requirements, where not
from storm and at the discretion of the
percolating water by Contractor.
pumping or otherwise,
including any necessary
temporary drainage and
disposal of water
2. Where springs or running Prov’l
water are likely to be Sum
encountered.
-------
Prov’l
numb
er of
pump
ing
hours

30. Water 1. Water for the Works, Item 1. If made available by the C.1 applies.
including that for Employer, details and
Nominated Sub- conditions are stated.
Contractors, Specialist
Contractors employed by
the Employer, statutory
undertakers and utility
companies and any
necessary temporary
plumbing and storage
31. Lighting and Power 1. Lighting and power for Item
the Works, including that
for Nominated Sub-
Contractors, Specialist
Contractors employed by
the Employer, statutory
undertakers and utility
companies and any
necessary temporary
wiring and meters

16
III PRELIMINARIES 17

(c) General Matters (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
32. Attendance 1. General attendance of Item M.3 For general attendance
one trade upon another upon Nominated Sub-
2. General attendance upon Contractors; and upon
Nominated Sub- Artists and Tradesmen
Contractors Specialist Contractors
are given, including
3. General attendance upon particulars of any
and cutting away for and unloading, storing,
making good after Artists clearing away rubbish
or Tradesmen Specialist and the like, protecting,
Contractors engaged by cutting away for and
the Employer for work making good and other
not forming part of the facilities to be afforded
Contract by the Contractor.
4. Special attendances, 1. Special scaffolding Item M.4 Any other Main
details stated 2. Access Roads Contractor's work in
connection with
3. Hardstandings Nominated Sub-
4. Hoisting, lowering and Contractors, and upon
positioning of plant or Artists and Tradesmen
materials Specialist Contractors is
5. Special supply of power measured in detail or
covered by Provisional
Sums.
33. Hoardings, etc. 1. Provision of hoardings, 1. Providing and erecting Item 1. Any special requirements C.1 applies. S.2 Design details, where
fans, planked footways, 2. Taking over existing and are described and the not at the discretion of
guard rails, gantries, repairing as necessary conditions regarding the Contractor.
lighting and the like as advertising rights are
may be required 3. Maintaining, duration stated.
stated
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
(c) General Matters (continued)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
34. Works by Public 1. Works to be carried out
Authorities by Government
Departments, or Public
Utility Companies
statutory undertakers
and utility companies
which are dealt with by
means of Provisional
Sums, e.g.:
(a) Taking up and
relaying the paving of
public roads and
footpaths
(b) Forming permanent
crossings
(c) Connections with to
water, gas, electric mains
and the like
35. Temporary Roads 1. Temporary roads and 1. Providing and Item C.1 applies. S.2 applies.
crossings where required constructing
with all relevant 2. Taking over existing and
particulars repairing as necessary
3. Maintaining, duration
stated
4. Adapting, details stated
5. Clearing away and
making good all works
disturbed
36. Drying the Building 1. Provision of fuel and Item
attendance for drying the
building, if required
37. Removal of Rubbish 1. Removal of rubbish and Item
debris, clearing up and
cleaning
38. Defects after 1. Making good defects Item
Completion appearing within the
Defects Liability Period,
and the extent of such
period
39. Co-ordination of 1. Co-ordination of Item
Services services, one with the
other and with the Main
Contract works
40. Building Information 1. Requirements in respect Item
Modelling of the preparation of
building information
modelling for design,
construction or facility
management purposes

18
V PILING AND CAISSONS 25
(a) Piling General
(Clauses applicable to all Piling sections)

INFORMATION PROVIDED MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


INFORMATION
1. Generally S.1 Details of treatments
The following general information, where available, shall be given: and coatings of piles.
(a) Ground level in relation to high and low water tables and Ordinance Principal Datum
(b) Soil investigation reports, nature of strata and details of any bore holes
(c) The various levels from which piling frames will operate the measurements have been taken are stated, irregular ground
levels are so described
(d) Conditions under which Contractors will be permitted to carry out their own soil investigations during the tender period
(e) Details of special provisions in respect of noise suppression, noisy working, time limitations and vibration limitations other
than Statutory requirements.
(f) Any particular requirement regarding phasing or sequence of driving piles.
(g) Any limitations on driving methods.

(b) Steel Sheet Piling


(See Section V(a) Piling General)

CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


INFORMATION
1. Providing and Item
assembling the
equipment on the Site
and the subsequent
dismantling and
removal
V PILING AND CAISSONS 27

(b) Steel Sheet Piling (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION

6. Cutting or burning 1. Size of the cross section m M.5 Measured in plane (not C.3 Any necessary S.2 Requirements in respect
through steel sheet of each pile and the developed) elevation excavation and disposal of ownership and
piling thickness, substance, along the centre line of is deemed to be disposal of offcuts
section modulus or the piling included.
manufacturer's catalogue
reference stated
7. Cutting or burning 1. Fully described nr
holes for pipes and the
like through the steel
sheet piling
8. Withdrawing steel 1. Size of the cross section m2 M.6 Measured from S.3 Requirements in respect
sheet piling of each pile and the formation level of the of ownership and
thickness, substance, ground to the bottom disposal of withdrawn
section modulus or edge of the piling and in piles
manufacturer's catalogue plane (not developed)
reference stated elevation along the
centre line of the piling

9. Strutting and shoring 1. The length and height of Item M.7 Alternatively such S.4 Any special
to steel sheet piling the piling face to be strutting and shoring may requirements
during subsequent upheld be measured in detail
excavation and
foundation work
10. Pre-boring the pile 1. Size of the cross-section 1. Depth of individual bores m M.8 Pre-boring is only C.4 This work is deemed to S.5 Materials for filling
holes of each pile stated ≤ 10.00 m (nr measured where it is include:
2. Depth of individual specifically required. (a) Movement of boring
stated)
bores˃ 10.00 m in M.9 Measured from point of rigs into position and
stages of 5.00 m entry about the site, any
necessary excavation or
filling required to place
the rigs, raising or
lowering the rigs and any
staging, barges or the
like required to support
the rigs
(b) Drilling to required
depths
(c) Filling voids between
sides of piles and bores
with approved materials
(c) Precast Concrete Piles
(See Section V (a) Piling General)
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
1. Providing and assembling Item
the equipment on the Site
and the subsequent
dismantling and removal
2. Supplying precast 1. Size of cross section stated m 1. Piles permitted to be cast C.1 Moulds are deemed to be
concrete piles (nr on site are so described included
stated)
3. Reinforcement M.1 Reinforcement shall be
given in accordance with
the rules for reinforced
concrete in Section VII
Concrete Works

4. Heads 1. Size of piles stated nr S.1 Where not at the discretion


5. Shoes of the Contractor these
items are fully described
6. Rock shoes
7. Handling, transporting m 1. Raking piles measured
and pitching the piles (nr separately and degree of
stated) rake stated

8. Pre-boring the pile holes 1. Size of the cross-section of 1. Maximum depth stated M.2 Pre-boring is only C.2 This work is deemed to S.2 Materials for grouting filling
each pile stated 1. Depth of individual bores ≤ measured where it is include:
10.00 m specifically required. (a) Movement of boring rigs
2. Depth of individual bores ˃ M.3 Measured from point of into position and about the
10.00 m in stages of 5.00 m entry site, any necessary
excavation or filling required
to place the rigs, raising or
lowering the rigs and any
staging, barges or the like
required to support the rigs
C.3 Pre-boring is deemed to
include:
(b) Drilling to required
depths
(c) grouting up Filling voids
between sides of piles and
bores with approved
materials

28
V PILING AND CAISSONS 33
(e) Bored Piles
(See Section V (a) Piling General)

CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


INFORMATION
1. Providing and assembling Item
the equipment on the Site
and the subsequent
dismantling and removal
2. Boring the pile holes 1. Size of bore cross-section 1. Total length of shaft ≤ 10.00 m 1. Raking piles measured M.1 Measured from the point C1 This work is deemed to S.1 Requirements regarding
stated m (nr separately and degree of of entry into ground to include: disposal of the spoil
2. Total length of shaft in stated) rake stated bottom of bore (a) Movement of piling
further stages of 5.00 m frames into position and
about the site, any
necessary excavation or
1. Depth of individual bores ≤ filling required to place the
10.00 m frames, raising or lowering
2. Depth of individual bores ˃ the frames and any staging,
10.00 m in stages of 5.00 m barges or the like required
to support the frames
(b) Reboring or intermittent
boring necessitated by the
removal of obstructions
under piles or other causes,
including moving and
repositioning the piling
frame
(c) Provision of temporary
casings to shaft bores
including sinking and
withdrawal operations
(d) Additional excavation
required to accommodate
temporary casings and
permanent linings (if
specified) and the
consequent disposal of
additional excavated
material
3. Permanent linings 1. Size, thickness and material m M.2 Measured from the C.2 This work is deemed to S.2 Backfilling materials
stated designed level include:
(a) Fabricating
(b) Protective coating or
surface treatment.
(c) Handling, pitching and
installing
(d) Filling voids between
linings and excavated faces
4. Concrete filling 1. Mix of concrete and size of m M.3 Measured from the bottom C.3 Any filling required above
bore cross section stated (nr of the bore to the cut-off cut-off level is deemed to be
stated) level of the pile included
C.3 This work is deemed to
include:
(a) Any extra concrete
required to fill any voids left
when temporary casings
are withdrawn.
(b) Any filling required
above cut-off levels.
Page number and layout to be re-arranged later.
V PILING AND CAISSONS 35
(e) Bored Piles (continued)
TESTING
CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION

10. Test loading of piles 1. Type of pile and test load to nr 1. First test loading C.7 Temporary pile caps and
be applied stated 2. Subsequent test loadings provision of all anchors,
platforms, loading materials
and the like are deemed to
be included.
11. Sonic test 1. Sonic tube 1. Size, thickness and material m M.7 Measured from cut-off C.8 Sonic tubes and gGrouting S.6 Grouting materials
stated level to toe of pile up holes upon completion of
test deemed to be included.
2. Sonic test nr M.8 Measured once for each
pile to be tested
11a. Koden test 1. Bell-outs nr M.8 applies.
12. Concrete coring test 1. Diameter of core and m 1. Starting level of drilling M.8 Depths measured in C.8 applies.
grouting requirements (nr below commencement level stages of 15.00 m C.9 This work is deemed to
stated stated) stated in stages of 15.00 m M.9 Measured the net length include:
cored (a) Movement of the
equipment about the site
(b) Extracting, labelling,
boxing and transporting
cores to a testing laboratory
(c) Any laboratory tests and
preparation of test report as
specified
(d) Grouting up holes upon
completion of test
13. Vibration test nr
14. Pre-drilling 1. Diameter of borehole stated 1. Drilling depth measured in m 1. Commencing level of drilling M.10 Drilling depth measured C.9 applies. S.6 applies
stages of 15.00 m (nr stated from the commencing level
stated) to the specified length
below the rock head
15. Post construction proof 1. Commencing level of drilling M.11 Drilling depth measured C.9 applies. S.7 Diameter, length and
drilling below the specified coring from the commencing level C.10 This work is deemed to material of the coring tube
tube stated to the specified length further include coring tubes.
below the concrete and rock
interface
V PILING AND CAISSONS 37

(f) Steel Piles (continued)


CLASSIFICATION TABLE MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
5. Dollying piles below 1. Size of piles stated m 1. Raking piles measured C.2 The rates are deemed to
ground (nr separately and degree of include for provision and
stated) rake stated use of dollies.

6. Filling hollow piles with 1. Mix of concrete and cross 1. Plain m


concrete section of piles stated 2. Reinforced, details stated
7. Excavation for and Item M.2 Alternatively measured
removal of surface and items may be given in
underground respect of such work.
obstructions together
with all work in
connection therewith
8. Cutting off heads of piles 1. Size of the cross section of nr S.1 Requirements in respect of
to required levels each pile and the weight, ownership and disposal of
thickness, substance, offcuts shall be stated and
section modulus or provision made for credits
manufacturers' catalogue
reference stated
9. Pre-boring the pile holes 1. Size of piles stated 1. Total length of shaft ≤ m 1. Raking piles measured M.3 Pre-boring is measured C.3 This work is deemed to S.2 Materials for grouting filling
10.00 m (nr separately and degree of only where it is specifically include:
2. Total length of shaft in stated) rake stated. required. (a) Movement of boring rigs
further stages of 5.00 m M.4 Measured from point of into position and about the
entry. site, any necessary
1. Depth of individual bores ≤
excavation or filling required
10.00 m
to place the rigs, raising or
2. Depth of individual bores ˃ lowering the rigs and any
10.00 m in stages of 5.00 m staging, barges or the like
required to support the rigs
C.3 Pre-boring is deemed to
include:
(b) Drilling to required
depths
(c) grouting up Filling voids
between sides of piles and
bores with approved
materials