1 Hydrant System
A) PRE-ERECTION &
ERECTION Check of damage Major Visual 100%
Installation/Manu
Rotating Equipment Leveling, Grouting of base frame Major Visual 100% al/drg.
Visual feeler & Installation/Manu
Pumps Alignment of Pump Critical Allign proper 100% al/drg.
1b
Motors / Diesel Engine Check for Damage Major Visual 100%
2 Apprd. Drg. /
MS Pipes Fit-up for Pipe joint Major Visual 100% WPS
Qualification
Pipe Alignment,fixing of support
elev. Slope layout Major Visual/Meas do
Flanges, Fittings
Performance witness/Review
( Extinct) ( Indospace )
To be stored in covered
Log Book / register 2 _ area
Record 2 _
Record 2 1
Record 2 _
To be stored in covered
Log Book 2 _ area
Record 2 _
Record 2 1
Record 2 _
Record 2 _
Record to be furnished to
customer
QW 482,483 2 _
484
Record 2 _
Indospace- 2