3.7 TESTS
b. Verify that facilities and testing equipment are available and comply
with testing standards.
e. Record results of all tests taken, both passing and failing on the CQC
report for the date taken. Specification paragraph reference,
location where tests were taken, and the sequential control number
identifying the test. If approved by the Contracting Officer, actual
test reports are submitted later with a reference to the test number
and date taken. Provide an information copy of tests performed by an
offsite or commercial test facility directly to the Contracting
Officer. Failure to submit timely test reports as stated results in
nonpayment for related work performed and disapproval of the test
facility for this Contract.
If the selected laboratory fails the capability check, the Contractor will
be assessed a charge of $6,000 to reimburse the Government for each
succeeding recheck of the laboratory or the checking of a subsequently
Mixture Proportions; G M
Mixture Proportions; G M
Testing and Inspection for CQC; G M
Fly Ash; G M
Aggregates; G M
Slump; G M
Compressive Strength; G M
Water; G M
SD-07 Certificates
SD-04 Samples
Surface Retarder; G R
Mixture Proportions; G M
Mixture Proportions; G M
Testing and Inspection for CQC; G M
Fly Ash; G M
Ground Granulated Blast-Furnace (GGBF) Slag; G M
Aggregates; G M
Air Content; G M
Slump; G M
Compressive Strength; G M
Water; G M
SD-07 Certificates
SECTION 03 30 01 Page 10
MH-60R Facilities, Package 1, Jubail, Saudi Arabia 454518PACKAGE1
ASTM C78/C78M and ASTM C1260. The accreditation must be current and must
include the required test methods, as specified. Furthermore, the testing
must comply with the following requirements:
Furnish all materials, labor, and facilities required for molding, curing,
testing, and protecting test specimens at the site and in the laboratory.
Furnish and maintain boxes or other facilities suitable for storing and
curing the specimens at the site while in the mold within the temperature
range stipulated by ASTM C31/C31M.
Concrete may contain admixtures other than air entraining agents, such as
water reducers, superplasticizers (only permitted with silica fume), or
set retarding agents to provide special properties to the concrete, if
specified or approved. Include any of these materials to be used on the
project in the mix design studies.
SECTION 03 30 01 Page 11
MH-60R Facilities, Package 1, Jubail, Saudi Arabia 454518PACKAGE1
Submit for approval, the qualifications and resumes for the following
staff:
1.5.2.1 Petrographer
SECTION 03 32 35 Page 10
MH-60R Facilities, Package 1, Jubail, Saudi Arabia 454518PACKAGE1
Provide all materials, labor, and facilities required for molding, curing,
testing, and protecting test specimens at the paving site and in the
laboratory. Provide steel molds for molding the beam specimens. Provide
and maintain boxes or other facilities suitable for storing and curing the
specimens at the paving site while in the mold within the temperature
range stipulated by ASTM C31/C31M. Provide flexural loading equipment in
accordance with ASTM C78/C78M.
SECTION 32 13 11 Page 14
MH-60R Facilities, Package 1, Jubail, Saudi Arabia 454518PACKAGE1
Mixture Proportions; G M
Mixture Proportions; G M
Testing and Inspection for CQC; G M
Fly Ash; G M
Aggregates; G M
Slump; G M
Compressive Strength; G M
Water; G M
SD-07 Certificates