Assembly Time: 30 3
Aseembly Steps:
Assembly Effort: Difficult Easy Moderate Easy
Easy:
Moderately Difficult:
Difficult:
Flips:
7200 2 O Drying
1 o Inspection
38 O Stretch wrapping
Outline Process Chart 25th Mar 2010
Example (Battery Manufacturing)
Seconds / Serial
Battery Number Symbol Description (Task) Remarks
39 O Do baling
7352.2
Flow Process Chart
Flow Process Chart / Material /Type
Chart No: Sheet No: Summary
Subject Charted: Activity Symbol Present Proposed Savings
Operation
Activity: Transport
Delay
Method: / Proposed: Inspection
Location: Storage
Total
FLOW PROCESS CHART
Company: SUMMARY
Department/Section: TASK Symbol Exisiting Proposed Savings
Location: Operation ¡
TYPE: Material OperatorEquipment Type Transportation ð
Subject Charted: Inspection o
Activity: Storage s
Operator: Delay D
Method: Exisiting Proposed Cost (Labor)
Charted By: Date: Cost (Material)
Approved By: Date: Cost (Mequipment)
TOTAL
Symbol Analysis ACTION
TASK DESCRIPTION ¡ ð o s D Time (Min or Sec) Distance (m) Quantity What? Where? When? Who? How? NOTES Eliminate Combine Change Sequence Simplify Other
MAN-MACHINE CHART
Company:
Department/Section:
Location:
Man-Machine
TYPE: Chart
Subject Charted:
Activity:
Operator:
Method: Exisiting Proposed
Charted By: Date:
Approved By: Date:
TIME UNIT
MAN MACHINE
TASK DESCRIPTION TIME TIME TASK DESCRIPTION
SUMMARY
TASK Symbol Exisiting Proposed Savings
Man:
Working
Idle
Machine:
Working
Idle
Utilization:
Man:
Machine:
Cycle Time:
Multiple Activity Chart
Flow Process Chart / Material /Type
Chart No: Sheet No: Summary
Activity Symbol Present Proposed Savings
Project:
Cycle Time
Man
Machine
Working
Process:
Man
Machine
IDLE
Machine (S):
Man
Machine
Operative(s): Clock Nos: UTILISATION
Charted by: Date: Man
Machine
Operator:
Date of Study:
Shift:
Analyst:
Charted By:
Sheet Yard
RM Stores
TPP1 (pega)
TPP2 (Emnew)
TPP3 (Emold)
TPP4 (AE)
PH
Drilling
Shearing 1 (old)
Shearing 2 (new)
110T(new)
110T(old)
63T
AIDA 1
AIDA 2
ISGEC 163T
RG50
RG35
RG35(New)
RG100(old)
RG100(New)
RG-125
HDS50 - 1
HDS50 - 2
Trays Fab1
Trays Fab2
Others
Cab fab
Small parts
Pretreatment
Auto Powder coating
Manual Powder coating
Trays Final Fitting
AREL final Fitting
ARPSL Final Fitting
External Final Fitting
Loading Area
Total
METRICS
Description UOM
MH Load forward Ton-m/year
MH Load back tracking Ton-m/year
MH cost/year Rs.mn/year
Number of 90 deg. Turns No's
Mate
RM TPP1 TPP2 TPP3 TPP4 PH
Stores (Pega) (EmNew) (Emold) (AE)
AREA in sqm
Quantity Description Quantity
2217798 Machines 2015
300708 Tooling 126
4.2 Maintenance 50
171 Stores 912
Utilities 150
Amenities 122
Displays 68
Office 145
WIP 962
FG 609
Aisles area 970
Approx. surface area 6129
Material handling load for exis
Shearin Shearin 110T
Drilling g 1 g2 110T(old) 63T AIDA 1
(new)
(old) (New)
40 180 93 27.5
1 5
21 13
2
2
1 40 180 114 27 30
sqm.
d for existing layout (850 MT/Mo
AIDA 2 ISGEC RG35 RG100 RG100
RG50 RG35
163T (New) (old) (New)
105 80
23
10 34 13
150
8
28 50
2 2
1.5
30 50 115 25 44 93 150
50 MT/Month)
RG-125 HDS50 - HDS50 - Trays Trays Others Cab fab
1 2 Fab1 Fab2 Fab
34.5 38
72 164
6.5 23 27
33 29
7 2
8 5 4.3
7.5 9
3 4 8 4
9 4
65 77
31 19
38 28
40.5
27.75
28 17 3
29 17 2
6 6.4
61
25
33
81
28
42
14
14
456
473
106
71
14
549.7 357.5
16 355 144
200
1510
0 12
258
259
121
212
67
25
0
42
79
11
21
18
52
13
142
81
50
93
41
70
61
62
456
473
106
71
14
907
515
120 320
0
0
0
0
0
120 0 6161 Ton-m/Day
184817 Ton-m/Month
2217798 Ton-m/Year
TIME STUDY
Date: 4-Aug-15
Area/Department/Section:
Machine/Workcenter:
Operator:
Time:
Time Study Analyst:
Observed Time
S. No Element Description 1 2 3 4 5 6 7
e
8 9 10 Average Rating BT Allwnc Std Time
TOTAL:
TIME STUDY FORM-A
Company: Layout:
Department/Section:
Location:
Subject Charted:
Activity:
Operation:
Machine:
Tools and Gages:
Operator:
Study By: Date:
Approved By: Date:
120
100
80
Column E
60 Column F
40
20
0
1 2 3 4 5 6 7 8 9 10
Station station -10 station -7 station -8 station -9 station -5
Operation Time 54 53 57 29.47
1 32 51 0 32 15.4
2 42 53 54 59 30.5
3 38 55 52 31 15.6
4 39 53 0 65 32.9
5 49 52 58 31 15.8
6 40 60 68 61 30.5
7 63 50 0 48 14.9
8 29 50 0 62 30.5
9 63 51 0 52 15.1
10 30 53 52 67 30.5
11 40 55 54 35 15.8
12 35 54 0 60 29.9
13 64 57 0 38 15.9
14 32 60 58 58 30.4
15 51 50 68 32 15.8
16 46 58 0 53 30.8
17 42 52 0 33 14.8
18 57 53 52 52 31.1
19 72 57 56 35 16.1
20 54 53 54 54 31.2
21 52 54 0 32 16.2
22 40 54 0 57 32.1
23 63 61 57 36 16.1
24 29 62 54 58 29.48
25 63 55 60 32 14.8
26 30 57 0 55 29.65
27 32 56 0 30 14.7
28 51 57 53 55 30.2
29 46 52 54 32 15.9
30 42 53 0 60 30.5
31 57 53 0 38 15.6
32 54 54 0 62 29.9
33 52 58 54 34 15.1
34 40 57 55 65 29.5
35 63 59 0 36 14.8
36 51 60 0 63 29.5
37 46 55 52 35 16.1
38 42 50 54 62 29.5
39 52 53 58 35 15.2
40 67 52 53 50 30.5
Avg 47.25 54.73 30.75 47.13 22.97
Min 29 50 0 30 14.7
Max 72.00 62.00 68.00 67.00 32.90
Talk Time 67.5 67.5 67.5 67.5 67.5
PCT 57.4 57.4 57.4 57.4 57.4
Chart Title
80
72.00
70 68.00 67.00
62.00
60
57.4 57.4 57.4 57.4 57.4 57.4 57
50
Chart Title
80
72.00
70 68.00 67.00
62.00
60
57.4 57.4 57.4 57.4 57.4 57.4 57
50
40
32.90
30 27.00
20
10
0
station -10 station -7 station -8 station -9 station -5 station -4 station0.-
Avg Min Max Tal k Ti me
station -4 station -10 station -10 station -10 station -10 station -10
27.71
2.35
26.53
2.1
27
Chart Title
2.90
27.00
-5 station -4 station0.00
-10 station0.00
-10 station0.00
-10 station0.00
-10 station0.00
-10
n Max Tal k Ti me PCT
Station station -01 station -02 station -03 station -04 station -05
Operation Time
1 24
2 32
3 25
4 25
5 24
6 26
7 23
8 35
9 30
10 30 39
11 29 24
12 29 21 45
13 33 31 41
14 34 28 42
15 33 26 40
16 25 30 54
17 33 15 56
18 28 30 56
19 27 32 56
20 35 19 56
21 27 39 55
22 32 34 55
23 26 34 57
24 26 19 46
25 34 28 47
26 30 31 50
27 33 21 47
28 33 36 43 70.00
29 32 29 46
30 33 30 53 60.00
31
32 50.00
33
34 40.00
35
36 30.00
37
38
20.00
39
40
#DIV/0! 29.53 28.38 49.74 10.00
#DIV/0!
Avg
Min 0 23 15 40 0
Max 0.00 35.00 39.00 57.00 0.00
0.00
Talk Time 67.5 67.5 67.5 67.5 67.5 1
PCT 57.4 57.4 57.4 57.4 57.4
Chart Title
80
70
60 57.00
57.4 57.4 57.4 57.4 57.4
50
Chart Title
80
70
60 57.00
57.4 57.4 57.4 57.4 57.4
50
39.00
40 35.00
30
20
10
0
station 0.00
-01 station -02 station -03 station -04 station 0.00
-05
Avg Min Max Ta lk Ti me PCT
70.00
Takt time
60.00 PCT
50.00
40.00
30.00
20.00
10.00
0.00
1 2 3
57.4
57.4
tion 0.00
-05
Station station -01 station -02 station -03 station -04 station -05
Operation Time
1 57 44 60 35 66
2 60 44 62 40 71
3 63 44 57 47 63
4 61 67 60 44 60
5 66 51 58 38 63
6 84 56 45 38 59
7 65 47 60 41 68
8 87 53 56 43 62
9 63 52 60 48 66
10 62 53 57 33 68
11 66 46 58 37 64
12 65 50 59 39 59
13 74 54 49 35 54
14 58 50 53 37 57
15 61 45 56 40 56
16 60 61 58 41 60
17 83 47 50 37 54
18 74 53 57 38 56
19 68 45 56 41 54
20 76 68 59 34 49
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Avg 67.65 51.50 56.50 39.30 60.45
Min 57 44 45 33 49
Max 87.00 68.00 62.00 48.00 71.00
Talk Time 67.5 67.5 67.5 67.5 67.5
PCT 57.4 57.4 57.4 57.4 57.4
Chart Title
100
90 87.00
80
71.00
70 68.00
62.00
60 57.4 57.4 57.4 57.4 57.4
Chart Title
100
90 87.00
80
71.00
70 68.00
62.00
60 57.4 57.4 57.4 57.4 57.4
50 48.00
40
30
20
10
0
station -01 station -02 station -03 station -04 station -05
Avg Mi n Max Ta l k Ti me PCT
station -06 station -7 station -8 station -9 station -10
51 51 0 32 42
67 53 54 59 38
53 55 52 31 39
58 53 0 65 49
56 52 58 31 40
61 60 68 61 63
58 50 0 48 29
56 50 0 62 63
53 51 0 52 30
58 53 52 67 40
56 55 54 35 35
61 54 0 60 64
62 57 0 38 32
54 60 58 58 51
50 50 68 32 46
50 58 0 53 42
49 52 0 33 57
53 53 52 52 72
49 57 56 35 54
52 53 54 54 52
90.00
80.00
70.00
60.00
50.00
40.00
30.00
55.35 53.85 31.30 47.90 46.90
49 50 0 31 29
20.00
67.00 60.00 68.00 67.00 72.00
67.5 10.00 68.00 36.00 43.00
10.00
57.4 67.5 67.5 67.5 67.5
57.4 57.4 57.4 57.4
0.00
1 2 3
71.00
57.4
71.00
57.4
tion -05
62 68
PCT
1 2 3 4 5 6 7 8 9 10
Takt time -67.5
PCT-57.5
9 10
Station station -7 station -8 station -9 station -10
Operation 54 53 57 32
1 51 0 32 42
2 53 54 59 38
3 55 52 31 39
4 53 0 65 49
5 52 58 31 40
6 60 68 61 63
7 50 0 48 29
8 50 0 62 63
9 51 0 52 30
10 53 52 67 40
11 55 54 35 35
12 54 0 60 64
13 57 0 38 32
14 60 58 58 51
15 50 68 32 46
16 58 0 53 42
17 52 0 33 57
18 53 52 52 72
19 57 56 35 54
20 53 54 54 52
21 54 0 32 40
22 54 0 57 63
23 61 57 36 29
24 62 54 58 63
25 55 60 32 30
26 57 0 55 32
27 56 0 30 51
28 57 53 55 46
29 52 54 32 42
30 53 0 60 57
31 53 0 38 54
32 54 0 62 52
33 58 54 34 40
34 57 55 65 63
35 59 0 36 51
36 60 0 63 46
37 55 52 35 42
38 50 54 62 52
39 53 58 35 42
40 52 53 50 52
Avg 54.73 30.75 47.13 47.13 #DIV/0!
Min 50 0 30 29 0
Max 62.00 68.00 67.00 72.00 0.00
Range 12.00 68.00 37.00 43.00 0.00
Talk Time 67.5 67.5 67.5 67.5 67.5
PCT 57.4 57.4 57.4 57.4 57.4
Chart Title
80
70 68.00
67.5 67.5 67.5
60
54.73 57.4 57.4 57.4
50
50 47.13
Chart Title
80
70 68.00
67.5 67.5 67.5
60
54.73 57.4 57.4 57.4
50
50 47.13
40 37.00
30.75 30
30
20
12.00
10
0
station -7 station
0 -8 station -9
Avg Mi n Ra nge Ta l k Ti me
62 68 67
#DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0
0.00 0.00 0.00 0.00
Chart Title
47.13 47.13
Chart Title
47.13 47.13
43.00
37.00
30 29
72