Академический Документы
Профессиональный Документы
Культура Документы
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
1 Placeing of truck Routine Indirect Norma Yes Vehicle movement Hit to material and person
1. Moving Objects
Hit to material
Loading of steel on
2 Truck or Trolly using Routine Indirect Normal Yes
Hydra
1. Slip & Fall of material.
1. sharp edges and
2. Topple of Hydra.
corner
3. Breaking of boom of
2. Lifting
Hydra.
Machines(Hydra) &
4. Breaking of D-
tools used for work
Shackle/Sling.
Page 1 of 20
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
1. Moving Objects
Hit to material
Name Signature
Prepared by
Approved By SI/HOD
Page 2 of 20
S Management System Issue No
tification & Risk Assessment Issue date
Reviewed on: Page No
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 3 of 20
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 4 of 20
OH & S Management System
Hazard Identification & Risk Assessment
Department: MSDS Location: MSDS-store yard
Activity/ies : Loading and Un loading of Cable drums in MSDS Yard
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
1 Placeing of truck Routine Indirect Norma Yes Vehicle movement Hit to material and person
Page 5 of 20
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
Un Loading of cable
3 drum on the Yard using Routine Indirect Normal Yes
Hydra
1. Slip & Fall of material.
2. Topple of Hydra.
2. Lifting
3. Breaking of boom of
Machines(Hydra) &
Hydra.
tools used for work
4. Breaking of D-
Shackle/Sling.
Name Signature
Prepared by
Approved By SI/HOD
Page 6 of 20
S Management System Issue No
tification & Risk Assessment Issue date
Reviewed on: Page No
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 7 of 20
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 8 of 20
OH & S Management System
Hazard Identification & Risk Assessment
Department: MSDS Location: MSDS store yard
Activity/ies : Loading and Unloading of Cable trays in MSDS yard
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
1 Placeing of truck Routine Indirect Norma Yes Vehicle movement Hit to material and person
Page 9 of 20
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non- Potential Hazard Risk Involved
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
Un Loading of Cable
2 trays on the Yard using Routine Indirect Normal Yes
Hydra
1. Slip & Fall of material.
2. Topple of Hydra.
2. Lifting
3. Breaking of boom of
Machines(Hydra) &
Hydra.
tools used for work
4. Breaking of D-
Shackle/Sling.
Name Signature
Prepared by
Approved By SI/HOD
Page 10 of 20
S Management System Issue No
ification & Risk Assessment Issue date
Reviewed on: Page No
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 11 of 20
Severity Rating
Probability
Risk
Risk Additional control
Consequence Current control measures Acceptable
P E A R Level measures
(Yes/No)
Page 12 of 20
OH
Hazard I
Department: MSDS Location: MSDS store yard
Activity/ies : Loading abd Un loading of Oil drums in MSDS yard
Condition: Legal
Routine/
Sub Activities/ Direct/ Normal/ requirement
SN Non-
Basic job steps Indirect Abnormal/ applicable
Routine
Emergency (Yes/No)
Un Loading of Oil
2 drums on the Yard using Routine Indirect Normal Yes
Hydra
Un Loading of Oil
2 drums on the Yard using Routine Indirect Normal Yes
Hydra
Name Signature
Prepared by
Approved By SI/HOD
OH & S Management System
Hazard Identification & Risk Assessment
Severity Rating
Probability
Risk
Risk
Current control measures Acceptable
P E A R Level
(Yes/No)