Академический Документы
Профессиональный Документы
Культура Документы
REGISTRATIONREQUIREMENTS
AND PROCEDURES HANDBOOK
REQUIREMENTS AND PROCEDURES FOR CONTRACTOR REGISTRATION
WITH THE
CONSTRUCTION INDUSTRY DEVELOPMENT BOARD MALAYSIA (CIDB)
January 2016
No part of this publication may be reproduced in any manner and for financial gain without the
prior written consent from CIDB.
ACKNOWLEDGEMENT
We are grateful to the following organizations for their assistance in itemizing the
specializations in this Requirements and Procedures Handbook for Contractor
Registration.
TenagaNasionalBerhad (TNB)
ITEM PAGE
A – INTRODUCTION 1
B – DEFINITIONS 2–4
C – APPLICATION GUIDELINES 5
1.0 Who Can Apply 5
2.0 Application Submission Methods 5–8
3.0 Processing Fee 9
4.0 Application Form and Supporting Documents 10
5.0 Application Processing Time 11
6.0 Application Results and Notification 11 – 12
7.0 Registration Fee 12 – 13
8.0 Payment Method 14
9.0 Collection / Delivery of Registration Certificate 14
D –CERTIFICATION OF LOCAL CONTRACTOR REGISTRATION (PPK) 14
1.0 Scope of Registration 14
1.1 Registration of Contractor Grade 14
1.2 Registration of Contractor Category 14
1.3 Registration of Contractor Specialization 15
1.4 Classifications of Contractor Registration Status 15 – 16
2.0 Registration Terms & Conditions 17
2.1 Registration with the Registrar of Companies (ROC) or 17
Registrar of Businesses (ROB)
2.2 Financial Feasibility 17 – 18
2.3 Technical Person Qualification 19
2.4 Registration of Company / Firm with the Energy 20
Commission
2.5 Additional Requirements 21
a) Integrity and Code of Ethics Course for New 21
Contractors
b) Business Management Course 21
c) Continuous Contractor Development (CCD) Points 21 – 22
ITEM PAGE
3.0 Types of Application 22
3.1 New Registration 22
3.2 Renewal 22
3.3 Re-registration 23
3.4 Change of Grade 23
3.5 Addition of Category 23
3.6 Addition of Specialization 24
3.7 Special Permission to Participate in Tender Beyond the 24
Scope of Specialization
3.8 Changes in Company Information 25 – 26
3.9 Request for Copy of Certificate or Replacement of Lost / 26
Damaged Certificate or Cancellation of Certificate
3.9.1 Lost / Damaged Registration Certificate 26
3.9.2 Copy of Registration Certificate 26
3.9.3 Contractor Registration Certificate Cancellation 27
Request
3.10 Automatic Cancellation of Registration Certificate 27
E – GOVERNMENT WORK PROCUREMENT CERTIFICATE (SPKK) 27
1.0 Terms and Conditions for Government Work Procurement 27 – 28
Certificate (SPKK) Registration
2.0 SPKK Validity Period 28
3.0 New SPKK Registration 28
4.0 SPKK Renewal 29
5.0 Application to Downgrade SPKK 29
6.0 Disciplinary Action on SPKK Holders 29 – 30
7.0 Terms and Conditions on the Use of the Government Work 30
Procurement Certificate (SPKK)
7.1 General Terms and Conditions of the Government Work 30
Procurement Certificate (SPKK)
7.2 Limit of Government Work Procurement Value 30 – 31
7.3 Region of Operation 31
7.3.1 Tender for Work 31
7.3.2 Quotation for Work 31
7.3.3 Work Awarded by Vote and Requisition 31 – 32
7.4 Limit of Government Work Procurement Value for 32
Contractors with Only Local Equity / Local and Foreign
Equity
With effect from 20th July 1995, it is mandatory for all contractors, either local or
foreign,to be registered with the Construction Industry Development Board Malaysia
(CIDB) under Section 25, Act 520 (Amendment 2011) prior to undertaking and
completing any construction work in Malaysia. This rule does not apply to contractors
who are exempted under Section 40 (1) of the Construction Industry Development
Board Malaysia Act 1994 (Act 520).
Any contractor found in breach of section 25 is liable, upon conviction, to a fine of not
less than Ten Thousand Ringgit, but not exceeding One Hundred Thousand Ringgit
under Section 29. Under Section 30, the Board may order a contractor, through written
notice, to cease from starting or continuing construction work, or from undertaking to
carry out or from completing construction work.
Contractors applying for registration are required to refer to the Contractor Registration
Requirements and Procedures Handbook and comply with the terms and conditions
stated within before submitting an application.
All information / documents submitted become the property of CIDB. The Board
reserves the right to use and disclose such information in any form of publication for
the purposes and interests of the construction industry.
No Terminology Definition
I Board The Construction Industry Development Board of Malaysia,
established under Section 3, Act 520.
xvi Government Work Enables the SPKK holder to participate in government work
Procurement procurement in construction according to the eligibility
Certificate(SPKK) stated
xix SPKK Nominee An individual who is allowed to conduct any dealings related
to government tenders. The nominee may comprise of any
Malaysian, either a business owner, member of the board of
directors, director, member of a cooperative board,
president, president of an association, or full-time company
employee.
Start
4b File an appeal
Processing of application 3
Yes
Unsuccessful Decision 4
Receive notice
4a of unsuccessful made
application
Successful
No
Pay the registration fee online or at the 6
CIDB counter 7
End
Ensure that the application form is complete. The supporting documents do not
need to be submitted online. However, retain these documents for a period of 3
years in the event of an audit.
2. After completing the online application form, pay the processing fee online or
over the CIDB counter within 21 days from the date the application is generated
online. Failure to do so will void the application without any notice. In such
event, re-apply if registration with CIDB is required.
3. The system directs the application to the appropriate state or branch CIDB
office,based on the registered address of the company. (e.g., if the company's
registered address is in Selangor, the application is processed by the Selangor
CIDB office. Addresses of the state / branch CIDB offices are as in Annex 1.
4b. submit an appeal within 30 days from the date on the unsuccessful
application notice. Only one appeal is allowed within the period.
6. Pay the registration fee for the issuance of the Contractor Registration
Certificate at the state or branch CIDB counter or online.
7. Only the company owner, director or nominee (in the SPKK) can collect the
certificate over the CIDB state or branch counter. If the company
owner, director or nomineecould not be present to collect the certificate, receive
it by mail at the registered correspondence address.
Start
5b File an appeal
Processing of application
4
Yes
Receive notice Unsuccessful
Decision 5
of unsuccessful
5a made
application
Successful
End
1. Complete and submit the SSPK (1Roc) form with supporting documents at the
CIDB counter. The CIDB state or branch office processing the application is
based on the applicant’s registered address (e.g., applications for companies
registered in Selangor must be sent to the Selangor CIDB office). Supporting
documents required are as in Annex 2
3. Pay the processing fee at the CIDB counter and receive the payment receipt.
4. The application is processed and wait for the results of the application.
5b. submit an appeal within 30 days from the date the unsuccessful notice is
issued. Only one appeal is allowed within the period.
8. Only the company owner, director or nominee (in the SPKK) can collect the
certificate over the CIDB state or branch counter. If the company
owner, director or nomineecould not be present to collect the certificate, receive
it bymail at the registered correspondence address.
Attach each application with the processing fee. Pay the processing fee
online or at the CIDB counter.The fee payable for the types applications are
as in Table A.
Processing
No Type of Application Fee Note
(RM)
1. Local Contractor Registration
i) New registration / re-registration
- Contractor Registration
Certificate (PPK)
- Government Work RM50.00 /
Procurement Certificate application
(SPKK)
ii) Renewal
3. International Contractor
Registration
Submit online applications with the processing fee within 21 days the
application is generated. Failure in paying the processing fee within this
period will void the application without any notice.
For applications submitted over the counter or are mailed-in, complete the
application form and attach the supporting documents as in the checklist in
Annex 2.Only the company owner or director is allowed to sign the
application form.Table B lists the application forms required according to the
type of application made.
The processing time varies for the application made. Table C lists the
processing time for the different types of application.
Processing
No Type of Application
Time
The applicant is registered for the grade, category and specialization applied
for if he fulfils all the conditions and criteria for the above.
If the applicant does not fulfil the conditions for the grade, category and
specialization applied for, CIDB has the right to register the contractor in the
above areas as per the documents submitted, or to deem the application
unsuccessful. Applicants are notified of the results in writing oralternately,
they may check results on the CIDB website smb.cidb.gov.myoron the CIDB
mobile apps. The results are announced as following:
(a) Successful
Applicants are reminded to check the results of the application before making
payment for the issuance of the Contractor Registration Certificate. The result
of the application is final once the Contractor Registration Certificate is issued.
Incomplete applications or applicants who do not fulfil the requirements will not
be registered. The reasons for unsuccessful application is stated in the results
notice. File any appeal within thirty (30) days from the date on the notice.
Appeals will only be considered once. Submit the letter of appeal with
supporting documents to the CIDB state of branch office which issued the
results.
Note: Theregistration fee must be paid before the Registration Certificate can be issued.
Only the company owner, director or nominee (in the SPKK) can collect the
certificate at the CIDB counter. Certificates are sent by registered mail to the
applicant’s correspondence address if the company owner, director or
nomineedoes not collect it.
.
CONTRACTORREGISTRATION REQUIREMENTSAND PROCEDURES 15
SUMMARY OF GRADE, CATEGORY AND SPECIALIZATION
Not exceeding B
G1 CONSTRUCTION
RM200,000.00 B01 to B28
OF BUILDINGS
Not exceeding
G2
RM500,000.00
Not exceeding CE
G3 CIVIL
RM1,000,000.00 CE01 to CE43
ENGINEERING
Not exceeding
G4
RM3,000,000.00
Not exceeding ME
G5 M01 to M23
RM5,000,000.00 MECHANICAL
AND
Not exceeding E01 to E35
G6 ELECTRICAL
RM10,000,000.00
Annex 3
Grade G1 G2 G3 G4 G5 G6 G7
Paid-up / 5,000/
netcapital 10,000 25,000 50,000 150,000 250,000 500,000 750,000
worth (RM) (SPKK)
Table F lists the financial feasibility assessment methods for different types
of applicants.
b) Savings account
a) The technical person’s work experience starts from the date the
technical certificate/ diploma / degree is conferred.
D G1
C G2
E04
B G3
A G4 and above
The requirements for registration with the ENERGY COMMISSION (EC) is as in Table
I.
C - Work up to
a) Three phase wireman + endorsement test (PW4) 1
RM 500K
D - Work up to
RM 100K a) Single-phase wireman (PW2) 1
Applicants must fulfil or comply with other terms and conditions of the
CIDB Contractor Registration Certificate, namely;
A new contractor registered with CIDB are required to attend and pass
the ContractorIntegrity and Code of Ethics Course within one (1) year
from the date of issue of the Contractor Registration Certificate.
Applicants may contact any state or branch CIDB office for more
information on the Contractor Integrity and Code of Ethics Course.
Renewal Period
Grade
1 Year 2 Years 3 Years
(Minimum points) (Minimum points) (Minimum points)
G1 and G2 10 20 30
G3 and G4 20 40 60
G5 and G6 30 60 90
G7 40 80 120
a) New registration
b) Renewal
c) Re-registration
d) Change of grade / category / specialization
e) Special permission to participate in tender beyond the scope of specialization
f) Change of company information
g) Application for lost, damaged, copy, or cancellation of registration certificate
a) Attend and pass the Contractor Integrity and Code of Ethics Course
b) Accumulate the minimum CCD points
c) Attend and pass the Business Management Course (for grades G1 to G3
without a technical certificate).
A contractor is registered by the grade, category and specialization they qualify for.
Generally, only B04 and / or CE21 and / or M15 category and specialization is
approved, accordingly with the applicant’s qualification.
3.2 Renewal
CIDB reserves the right to re-evaluate the registration of the existing grade,
category or specialization based on the documents or information submitted during
the renewal application.
CIDB reserves the right to re-evaluate the registration of the existing grade,
category or specialization based on the documents or information submitted during
the re-registration application.
For grade change applications, the validity period is as per the existing registration
certificate. If the current certificate has not expired, the original registration
certificate must be returned during the payment of the registration fee.
For grade change application with renewal, the registration certificate is valid as
per the approved period.
For category addition applications, the validity period is as per the existing
registration certificate. If the current certificate has not expired, the original
registration certificate must be returned during the payment of the registration fee.
For category addition application with renewal, the registration certificate is valid as
per the approved period.
An additional category can be applied for if the applicant can prove one of the
following:
For application of specialization addition, the validity period is as per the existing
registration certificate. If the current certificate has not expired, the original
registration certificate must be returned during the payment of the registration fee.
Additional specializations can be applied for if the applicant can prove one of the
following:
Company must a valid registration certificate and be free from any disciplinary
action. The conditions of the application are as follows:
The application results are announced in three (3) working days upon payment
processing fee and submission of the complete set of supporting documents.
All contractors are required to notify CIDB of any change of company information
within thirty (30) days of the change. Under Section 39, Act 520 (Amendment
2011) a contractor can be fined not exceeding Five Thousand Ringgit
(RM5,000.00) if he fails to do so.
Applicants must submit the R6 form with the processing fee and certificate re-
issuing fee.
The type of information change and the documents required is as in Table K.
b) Change of company’s registered address The latest D form printout from the Companies
Commission of Malaysia (CCM).
3) Change of technical person / company Submit names of the new technical person /
nominee company nominee with their EPF statements
and payment receipts.
4) Change of mailing address / telephone or fax Submit notice of address change. No fee is
numbers charged.
b) Has the eligible paid-up capital or net capital worth or, financial and
technical person, except for grade G1 the paid-up capital or net capital
worth is at least RM10,000.00, and
iii) Has a valid ISO 9001:2008 certification for contractor grade G7.
e) Change in Equity
ii) New shareholders must not own more than 49% of shares of the
company’s paid-up capital or net capital worth, OR
Renewal application can be submitted with the PPK application. SPKK that is
not renewed for more than 12 months (1 year) after the expiry date will lead to
termination of the registration. However, SPKK can be re-applied, provided that
the new SPKK requirements are met.
A company that has been approved to downgrade its grade, at the request of
the company, or downgraded by CIDB for not meeting the requirements and
criteria of the current grade will result in the Bumiputra Status Certificate (STB)
to be withdrawn by the Contractor and Entrepreneur Development Division of
the Ministry of Works.
Disciplinary action is taken against SPKK holders for offences listed in Table L.
7.0 Terms and Conditions for the Usage of Government Work Procurement
Certificate (SPKK)
G2 Up to 500,000.00
G3 Up to 1,000,000.00
G4 200,001.00 to 3,000,000.00
G5 200,001.00 to 5,000,000.00
G6 200,001.00 to 10,000,000.00
G7 200,001.00 and above
There are two (2) types of consortium or joint venture contractor registration with
CIDB:
a) Project
Has an appointment letter or acceptance letter to carry out a project.
b) Contractor Registration
Applicants must:
An international contractor is a local contractor registered with CIDB and will carry
out or has carried out construction work abroad.
Once approved and notified by CIDB, successful applicants must pay the
registration fee of One Hundred Ringgit (RM100.00).
The certificate is valid for the same length as the existing local registration
certificate.
H – FOREIGNCONTRACTOR REGISTRATION
A foreign contractor must apply for the Provisional Registration Certificate before
A foreign contractor must apply for the Provisional Registration Certificate before
participating in any tenders in Malaysia.Companies are not allowedto
participate in any tenders before obtaining a provisional registration certificate
from CIDB.
A foreign contractor is not permitted to carry out or undertake to carry out any
construction project before obtaining a Foreign Contractor Certificate.
Applicants must:
b) The contractor shall not participate any tenders or carry out any
construction work after the certificate expires, unless it is renewed.
h) The contractor must comply with the principles stated within the
CIDB Contractor Code of Ethics Handbook.
The contractor must ensure that the products or construction materials used are
compliant to the MS (Malaysian Standard) or other standards yang approved by the
Malaysian authorities and are certified by the Board.
c) The certificate holder fails to comply with any provision of the Act or
these regulations; or
Note:
iii) Disciplinary actions and decisions made on the PPK certificate will
affect the SPKK status.
c) This certificate does not allow the holder to participate in a tender for
any construction work or to carry out any other construction work.
This certificate is valid until the project expiry date as stated in the
certificate.
a) The foreign contractor does not comply with the requirements of any
other written law;
h) The foreign contractor has violated any terms and conditions of the
Contractor Responsibilities and Obligations as specified under
paragraph 2.3.
R1/ROB/2015
Free
NEWAPPLICATION CHECKLIST
SOLE PROPRIETORSHIP / PARTNERSHIP / LIMITED LIABILITY PARTNERSHIP
* Please tick andarrange thedocumentsin the order as in the checklist. It is the applicant’s
responsibility to ensurethat the documentsare complete and submitted as per the order in the
checklist. To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.myor through the CIDB app after 10
working days of submitting the documentswith payment of processing fee.
A) APPLICANT INFORMATION
1 Printout of the latest D form, business information and owner information from the E-Info
Services of the Companies Commission of Malaysia (CCM).
3 CAP 64 form, Business Extract & Commercial License - I form (if business is registered in
Sarawak).
4 A copy of the applicant’s identity card (of one of the company owners).
1 A copy of the financial statements (All or one of the following can be considered as net
capital worth);
1.1 A copy of the company’s current account statement. Please attach the latest month’s
statement.The highest balance of the month will determine the company’s financial
capacity.
1.2 A copy of the company owner’s savings or current account statement. Please attach
the latest month’s statement.The current balance (of the savings account) or the
highest balance (of the current account) of the month will determine the company’s
financial capacity.If the company operates as a partnership, please attach the savings
account or the current account statements of each partner.
GRADE G1 G2 G3 G4 G5 G6 G7
NET
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
WORTH (RM)
TableA–Financial Capacity by Grade
3.1 A copy of the latest month’s EPF contribution statement, or the A formand the official
EPF contribution payment receipt.
3.2 A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
E) ISO 9001:2008 CERTIFICATE [G7 Government Work Procurement Certificate (SPKK) new
application]
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
A) APPLICANT INFORMATION
1 Printout of the latest D form, business information and owner information from the E-
Info Services of the Companies Commission of Malaysia (CCM).
3 CAP 64 form, Business Extract & Commercial License - I form (if business is registered in
Sarawak).
5 A copy of the applicant’s identity card (of one of the company owners).
1 A copy of the financial statements (All or one of the following can be considered as
net capital worth);
1.1 A copy of the company’s current account statement. Please attach the latestmonth’s
statement. The highest balance of the month will determine the company’s financial
capacity.
1.2 A copy of the company owner’s savings or current account statement. Please attach
the latest month’s statement. The current balance (of the savings account) or the
highest balance (of the current account) of the month will determine the company’s
financial capacity. If the company operates as a partnership, please attach the
savings account or the current account statements of each partner.
1.3 A copy of the latest transactions of the owner’s ASB or Tabung Haji passbook.
GRADE G1 G2 G3 G4 G5 G6 G7
NET 5,000 /
CAPITAL 10,000 25,000 50,000 150,000 250,000 500,000 750,000
WORTH (RM) (SPKK)
TableA - Financial Capacity by Grade
3.2 A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
D) CLASSIFICATIONS OF STATUS
1 A copy ofproof of workor proof of tender participation in the past three (3) years.
1 A copy ofthe Contractor Integrity and Code of Ethics course certificate with a ‘pass’. (for
first renewal only)
1 A copy ofcourse certificates or anycompany activitiesthat qualify for CCD points (Refer to
Annex 7). Only course certificates awarded to the company owner / employee
andcertificates for courses attended within the current registration period qualify for CCD
points.
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1 Printout of the latest D form, business information and owner information from the E-
Info Services of the Companies Commission of Malaysia (CCM).
3 CAP 64 form, Business Extract & Commercial License - I form (if business is registered in
Sarawak).
4 A copy of the applicant’s identity card (of one of the company owners).
1.2 A copy of the company owner’s savings or current account statement. Please
attach the latest month’s statement. The current balance (of the savings
account) or the highest balance (of the current account) of the month will
determine the company’s financial capacity. If the company operates as a
partnership, please attach the savings account or the current account
statements of each partner.
1.3 A copy of the latest transactions of the owner’s ASB or Tabung Haji
passbook.
2 If the company operates as a partnership, please attach a copy of the partnership agreement
signed in front of a witness.
GRADE G1 G2 G3 G4 G5 G6 G7
NET
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
WORTH (RM)
TableA - Financial Capacity by Grade
GRADE G1 G2 G3 G4 G5 G6 G7
a) The company has done work in the specialization applied for, attaching the work offer
letter / proof of work completion / recommendation letter from the client awarding the
project.
b) Employs a person competent in a related field (Refer to Annex 6).
c) Registered with any registrar under a Parliamentary Act(Refer toAnnex 6).
d) Holds aCertificate of Competencyin Management (SKP) awarded by CIDB in the area
applied for.
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.myor through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1 APPLICANT INFORMATION
1.1 Printout of the latest company information from the Companies Commission of Malaysia
(CCM) E-Info Services.
1.3 CAP 64 form, Business Extract & Commercial License - I form (if business is
registered in Sarawak).
1.4 A copy of the applicant’s identity card (of one of the company owners)
1.5 A copy of the director’s technical certificate / academic certificates (if any)
*The type of business registered in the company registration must be related to construction.
2.1 Printout of the latest company information from the Companies Commission of Malaysia
(CCM) E-Info Services.
GRADE G1 G2 G3 G4 G5 G6 G7
PAID UP
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
(RM)
TableA - Financial Capacity by Grade
- A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
5 ISO 9001:2008 CERTIFICATE [G7 Government Work Procurement Certificate (SPKK) new
application]
5.1 The latest and valid ISO 9001:2008 certificate
RENEWAL/RE-REGISTRATIONAPPLICATION CHECKLIST
PRIVATE LIMITED / LIMITED COMPANY (ROC)
* Please tickandarrange the documents in the order as in the checklist.It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1APPLICANT INFORMATION
1.1 Printout of the latest company information from the Companies Commission of Malaysia
(CCM) E-Info Services.
1.3 CAP 64 form, Business Extract & Commercial License - I form (if business is
registered in Sarawak).
1.4 A copy of the applicant’s identity card (of one of the company owners)
2.1 Printout of the latest company information from the E-Info Services of the Companies
Commission of Malaysia (CCM).
GRADE G1 G2 G3 G4 G5 G6 G7
PAID UP 5,000 /
CAPITAL 10,000 25,000 50,000 150,000 250,000 500,000 750,000
(RM) (SPKK)
TableA - Financial Capacity by Grade
- A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
TECHNICAL Technical certificate / A diploma A diploma Adegree anda Adegree anda
PERSON Certificate of holder holder diploma holder diploma holder
MINIMUM Competency in (minimum5 (one (both
REQUIREMENT Business yearsof withminimum3 withminimum5
Management experience) or yearsof yearsof
adegree holder experience) experience)
(minimum1 or
yearof 2 degree holders
experience) (one
withminimum5
yearsof
experience)
*Diploma /Degree in construction related field and recognized by the Malaysian government.
Table B – Technical Person Qualification / Experience
4CLASSIFICATIONS OF STATUS
4.1 A copy of proof of work or proof of tender participation in the past three (3) years.
* Please tickandarrange the documents in the order as in the checklist.It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1.3 CAP 64 form, Business Extract & Commercial License - I form (if business is
registered in Sarawak).
1.4 A copy of the applicant’s identity card (of one of the company owners)
2.2 For applications made by private limited companies having a company as a shareholder,
please attach the company’s latest annual returns. For applications made by limited
companies, please attach the company’s latest annual returns.
GRADE G1 G2 G3 G4 G5 G6 G7
PAID UP
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
(RM)
TableA - Financial Capacity by Grade
GRADE G1 G2 G3 G4 G5 G6 G7
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1APPLICANT INFORMATION
1.1 Registration certificate
1.2 By-laws
1.5 A copy of the director’s technical certificate / academic certificates (if any)
1.7 CAP 64 form, Business Extract & Commercial License - I form (if business is
registered in Sarawak).
1.8 A copy of the applicant’s identity card (of one of the societydirectors)
2.1 A copy of the society’s current account statement. Please attach the latestmonth’s
statement. The highest balance of the month will determine the society’s financial
capacity.
GRADE G1 G2 G3 G4 G5 G6 G7
NET
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
WORTH (RM)
TableA - Financial Capacity by Grade
- A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
A degree and a
A diploma
diploma holder
holder
(both
(minimum5
A degree and a withminimum5
yearsof
TECHNICAL diploma holder yearsof
A experience) or
PERSON Technical certificate (one experience)
diploma A degree
MINIMUM (if any) withminimum3 or
holder holder
REQUIREMENT yearsof 2 degree holders
(minimum 1
experience) (one
yearof
withminimum5
experience)
yearsof
experience)
*Diploma/Degree in construction related field and recognized by the Malaysian government.
Table B – Technical Person Qualification / Experience
5ISO 9001:2008 CERTIFICATE [G7 Government Work Procurement Certificate (SPKK) new
application]
5.1 The latest and valid ISO 9001:2008 certificate
RENEWAL/RE-REGISTRATIONAPPLICATION CHECKLIST
COOPERATIVE / SOCIETY / ORAGANIZATION
* Please tickandarrange the documents in the order as in the checklist.It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1APPLICANT INFORMATION
1.1 Registration certificate
1.2 By-laws
1.5 A copy of the director’s technical certificate / academic certificates (if any)
1.7 CAP 64 form, Business Extract & Commercial License - I form (if business is registered
in Sarawak).
1.8 A copy of the applicant’s identity card (of one of the society directors)
1.9 A copy ofCertificate of Competencyin Business Management (SKP). One of the society
directors mustattend and pass this course. The requirement is mandatory for new
applicants without a technical certificate.(must be presented upon first renewal
application for G1 to G3 only)
2.1 A copy of the society’s current account bank statement. Please attach the latest
month’s statement. The highest balance of the month will determine the society’s
financial capacity.
GRADE G1 G2 G3 G4 G5 G6 G7
NET 5,000 / 25,000 50,000 150,000 250,000 500,000 750,000
CAPITAL 10,000
WORTH (RM) (SPKK)
TableA - Financial Capacity by Grade
- A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
TECHNICAL Technical certificate / A A diploma A degree and a A degree and a
PERSON Certificate of diploma holder diploma holder diploma holder
MINIMUM Competencyin holder (minimum5 (one (both
REQUIREMENT Business yearsof withminimum3 withminimum5
Management experience) or yearsof yearsof
A degree holder experience) experience)
(minimum 1 or
yearof 2 degree holders
experience) (one
withminimum5
yearsof
experience)
*Diploma/Degree in construction related field and recognized by the Malaysian government.
Table B – Technical Person Qualification / Experience
4CLASSIFICATIONS OF STATUS
4.1 A copy of proof of work or proof of tender participation in the past three (3) years.
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1.2 By-laws
1.4 A copy of the director’s technical certificate / academic certificates (if any)
1.6 CAP 64 form, Business Extract & Commercial License - I form (if business is
registered in Sarawak).
1.7 A copy of the applicant’s identity card (of one of the society directors)
GRADE G1 G2 G3 G4 G5 G6 G7
NET
CAPITAL 5,000 25,000 50,000 150,000 250,000 500,000 750,000
WORTH (RM)
TableA - Financial Capacity by Grade
- A copy of the latest month’s SOCSO contribution statement or salary slip for
employees aged above 55.
GRADE G1 G2 G3 G4 G5 G6 G7
TECHNICAL Technical certificate A A diploma A degree and a A degree and a
PERSON (if any) diploma holder diploma holder diploma holder
MINIMUM holder (minimum5 (one (both
REQUIREMENT yearsof withminimum3 withminimum5
experience) or yearsof yearsof
A degree experience) experience)
holder or
(minimum 1 2 degree holders
yearof (one
experience) withminimum5
yearsof
experience)
*Diploma/Degree in construction related field and recognized by the Malaysian government.
Table B – Technical Person Qualification / Experience
a) The society has done work in the specialization applied for, attaching the work offer letter
/ proof of work completion / recommendation letter from the client awarding the project.
b) Employs a person competent in a related field (Refer to Annex 6).
c) Registered with any registrar under a Parliamentary Act (Refer to Annex
d) Owns a Certificate of Competency in Management (SKP) awarded by CIDB in the area
applied for.
APPLICATION CHECKLISTFOR
FOREIGN CONTRACTOR PROVISIONAL REGISTRATION CERTIFICATE SEMENTARA
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
2.0 Evidenceof work carried outin the form of proof of work / participation in tender related to
construction, in Malaysia or abroad.
3.0 A minimum fund of RM750,000.00 / equivalent value in the contractor’s national currency. A
copy ofthe company’s current account statement / a copy ofthe company registrationfrom
the country of origin stating the financial capacity (by CIDB company grade).
APPLICATION CHECKLISTFOR
FOREIGN CONTRACTOR REGISTRATION CERTIFICATE
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1.0 A copy ofthe latest company registrationfrom the Companies Commission of Malaysia
(CCM)
4.0 A copy oftwo (2) Malaysian technical persons’ degree certificate. The degreemust be in
aconstruction related field. One technical personmust haveat least five years of experiencein
construction
7.0 Complete and submit the L1/96 form (Project Notification form)
APPLICATION CHECKLISTFOR
CONSORTIUM OR JOINT VENTURE COMPANY REGISTRATION CERTIFICATE
* Please tickandarrange the documents in the order as in the checklist. It is the applicant’s
responsibility to ensure that the documents are complete and submitted as per the order in the
checklist.To expedite the submission process, each application will be accepted without prior
checking at the counter.
* Applicants may check their application results at smb.cidb.gov.my or through the CIDB app after 10
working days of submitting the documents with payment of processing fee.
1.0 A copy ofa valid Contractor Registration Certificatefor the partner who is registered with
CIDB.
4.0 Complete and submit the L1/96 form (Project Notification form)
5.0 A copy ofthe applicant’s identity card (of one of the company owners / directors)
PAID UP
TENDER / CAPITAL / TECHNICAL PERSON
WORK NET QUALIFICATION (MALAYSIAN
OTHER REQUIREMENTS
GRADE CAPACITY CAPITAL DIRECTOR / OWNER /
(RM) WORTH EMPLOYEE)
(RM)
5,000
G1 not Technical certificate (if any)
exceeding 10,000 for
200,000.00 SPKK
Note:
- Net capital worth (for sole proprietorship / partnership/limited liability partnershipin the form of the company’s
latest current account statement(highest balance))/ savings account balance/ unsecured fixed deposit /
ASBshares andTabungHaji savings.
- Diploma / degree / certificatein aconstruction related fieldandis recognized by the Malaysian government/CIDB
NO COURSE CATEGORY
35 Bachelor of Interior Design B, CE
36 Degreein Town &Regional Planning B, CE
37 DegreeLand Surveying B, CE
38 BSc (Hons) Quantity Surveying B, CE
39 Bachelor of Science (Housing, Building and B, CE
Planning)(Hons)(Quantity Surveying)
40 Bachelor of Estate Management B, CE
41 Advanced Diploma of Estate Management (UiTM) 1982-2002 B, CE
intake
42 Bachelor of Surveying (Property Management) B, CE
43 Bachelor of Science (Property Management) B, CE
44 Bachelor of Science in Land Administration & Development B, CE
45 Bachelor in Real Estate & Asset Management B, CE
46 Bachelor of Real Estate Management B, CE
47 Bachelor of Building Surveying B, CE
48 Bachelor of Science in Construction Management B, CE
49 BSc Geology / Diploma Geology CE
50 Bachelor ofArchitecture
51 CIDB Certificate of Competencyin Management (SKP) B, CE
52 Malaysian Skills Certificate (SKM) B, CE
53 Local Accreditation Certificate B, CE
54 Certificate of Skill Competency B, CE
55 Basics of Building Contractor Certificate B, CE
56 Technical certificatefrom Polytechnic / IKM / ILP / IKBN / ABM B, CE
B18 Metalwork CE18 Land reclamation M18 Hot water systems High voltage underground
E18
cablingup to 11KV
B02 IBS: Steel frame system Construction of buildings and Work offer letterandproof of
plantsusingsteel structures,hot-rolledor work completion /
cold-rolled, i.e.steel beam, column, roof Certificate of Competency in
trussandportal frame Management
B03 Restoration and conservation Restoration and conservationwork on Work offer letterandproof of
heritage buildings / historical monuments work completion
B04 Construction work on building Construction workon any buildingorplant Construction experience /
technical person (Refer to
Annex 10) / Certificate of
Competency in Management
Anypiling work,includingconcrete pilingon
B05 Piling site, using precast reinforced concrete, Work offer letterandproof of
pre-stressedor post-tensioned concrete, work completion / Certificate of
steel, timber, patented systems, etc. Competency in Management
Repairwork on concretestructures by
usingpressure grouting, guniting, etc.
B06 Repair work on concrete Work offer letterandproof of
structure Interior decorating work, includingceiling work completion
panel, partition, built-in furniture/fittings,
B07 Interior Decorating wall and floor finishing Work offer letterandproof of
work completion / Certificate of
Installationofwaterproofing materialfor Competency in Management
basement, roof, wall,etc.
B08 Installation of waterproofing Work offer letterand proof of
materials work completion / Certificate of
Landscapingwork (soft &rigid) in Competency in Management
buildings
B09 Building interior landscaping Work offer letterand proof of
Installation, repairandmaintenanceof work completion
plumbing systemin buildings
B10 Internal plumbing system A permit (A1 or A2) from
SPAN (individual); Sabah &
Installation of signboardon anybuildingor Sarawak Refer toAnnex 7
plant,includingdirections, building
B11 Installation of signs on buildings directory, billboard, business sign, etc. Work offer letterand proof of
work completion
Installationof glass in
buildings,includingmetal /timberframing,
B12 Glass installation etc. Work offer letterand proof of
work completion
Installationof tiles in buildings
B13 Tile installation Work offer letterand proof of
work completion
Paintwork
B14 Paintwork Work offer letterand proof of
work completion / Certificate of
B20 Internal gas piping system Installationof gas pipeline in Registrationwiththe Energy
buildingsandplants Commission(EC) (company)
CE02 Bridge and jetty construction Construction, Work offer letterand proof of
maintenanceandrepairof bridge, work completion
flyover, pedestrian bridge, etc.
CE03 Marine structure Constructionof port andpier base, Work offer letterand proof of
includingpier, jetty, breakwater, work completion / Certificate of
entrance channel, fender, container Competency in Management
terminal, ferry terminal, warehouse,
office building, customs
&immigration checkpoint,cargo
terminal, passenger&business
centres, dock, dock yard, piloting
equipment,etc.
Constructionof
airport,includingterminal building,
satellite building, cargo terminal, air
traffic control tower, runway,
CE18 Land reclamation airplane Work offer letterand proof of
docking,etc.Contractorsmust also work completion
registerfor B04 specialization
CE21 Civil engineering construction Construction, installationor Work offer letterand proof of
modification work on any part of a work completion / technical
water supply system person (Refer toAnnex 10)
Construction andmaintenancework
CE25 Explosion work on telecommunication tower Explosives technician cardfrom
structure, broadcasting tower, the Royal Malaysian Police force
electronic (pylon), smoke emission (PDRM)
chimney, factory, etc.
CE27 Thermal insulation / refractory Construction andmaintenancework Work offer letterand proof of
work on monumentsorany sculptured work completion
structure, including replica, statue,
CE28 Specialized concrete formwork Chinese tomb,etc. Work offer letterand proof of
work completion
Heat insulation /refractory work
CE29 Scaffolding installation Registered scaffolderwithDOSH
Soil stabilizationwork,
includingcompressing, de-
wateringby adding other materialsto Work offer letterand proof of
CE31 Underground cable path the soil to improve soil strength work completion
structure anddurabilityfor furtherconstruction.
Scopeof workincludes using
reinforced earth underground
drainage
M02 Fire prevention and protection Installation, testing, Work offer letterand proof
system maintenanceandrepairof fire alarm, of work completion /
andfire preventionandprotectionsystem Certificate of Competency
in Management
M04 Building automation system Installation, testing, Work offer letterand proof
maintenanceandrepairof industrial building of work completion /
automationandprocessing control Certificate of Competency
system,includingmicro processingor in Management
computer-controlledsystem
forbuildings,and industrial processing
control system
M05 Workshop, factory, quarry & Work offer letterand proof
etc. systems Installation, testing, of work completion
maintenanceandrepairof workshop,
factory, quarry equipment, i.e.crane, lift,
crusher,refinery, asphalt mixer, etc.
M06 Medical equipment systems Work offer letterand proof
Installation, testing, of work completion
maintenanceandrepairof medical
equipment, i.e.air compression system,
medical gasses system, dental chair,
hydrotherapy systems, sterilization and
autoclaves, other medical equipment, etc.
M07 Kitchen equipment systems Work offer letterand proof
Installation, testing, of work completion
maintenanceandrepairof kitchen
applianceandequipment,includingliquid
petroleum gas (LPG) systems
M08 Steam boiler and fired RegistrationwithDOSH
pressure vessel plant systems Installation, testing, (company)
maintenanceandrepairof steam boiler,
heat exchanger, ’unfired pressure
vessel’airintake. Contractormust be
M09 Mechanical compression and registeredwithDOSH Work offer letter and proof
generation system of work completion
Installation, testing,
maintenanceandrepairof centrifugal
compressor, reciprocating compressor,
antiskid, air
compressor, rotary compressorpipeline
valve, blower, liquid ring compressor,
diesel generator, solar photovoltaic cell,
M10 Power generation cooling water turbine generatorandhybrid systems Work offer letter and proof
systems of work completion
Installation, testing,
M11 Specialized construction and maintenanceandrepairof air-driven gas Work offer letter and proof
treatment turbine of work completion
Installation, testing,
maintenanceandrepairof exhaust shaft,
tank, reactor, filtration separator,
Construction, maintenanceandrepairof
compressor station, metering station,
offshore base, power plant, gas
M13 Offshore drilling structure processing plant, petrochemical plant, oil Work offer letterand proof
refinery, airplane refuelingsystem, and of work completion
defuelingand petrol station
M14 Pollution control system Construction, maintenanceandrepairof Work offer letterand proof
offshore drilling structure,includingdrilling of work completion
rig
Installation, testing,
maintenanceandrepairof pollution
M15 Miscellaneous mechanical controlequipment, includingair, water, Work experience / technical
equipment noise, wastewater, sewage, solid waste, person (Refer toAnnex 10)
riverandpond treatment
Installation, testing,
maintenanceandrepairof miscellaneous
mechanicalequipment, i.e.machinery
plantandwaste treatment plant, automated
M16 Tower cranes racking delivery, swimming pool systems, Registration with DOSH
hydraulic door lift, floodgateandliquid (Individual)
petroleum gas system installation
M19 Plant equipment installation Installation, testing, maintenance and Work offer letter and proof
repair of hot water systems including of work completion
piping
M23 SCADA and telemetry systems Installation, testing, maintenance, repair Work offer letter and proof
and overhaul of pumping, drainage and of work completion
irrigation systems, and booster pump
E02 Surveillance and security Installationandmaintenanceof security Work offer letterand proof
systems control, surveillance, security alarm, car of work completion
park surveillanceandaccess card, CCTV,
sensor /detection andplatform alarm
systems
E29 Cable connecting work, Cable connecting work, 33KV to 66KV Competent cable jointer
33KV to 66KV (PK4 - 66KV) and above
E30 Cable connecting work,up to Cable connecting work,up to 132KV Competent cable jointer
132KV (PK5 - 132KV) and above
E31 Cable connecting work, Cable connecting work, above 132KV Competent cable jointer
above 132KV (No limit) (No limit) (PK6 – No limit)
B10 Installation of internal water pipes A permit (A1 orA2) SPAN (West Malaysia)
B10 Installation of internal water pipes Fitter certificatefrom JKR Sarawak (for Sarawak)
B10 Installation of internal water pipes Plumbing licensefrom Sabah StateWater Department (For Sabah)
B21 Scaffolding installation Registered scaffolderwithDOSH
B25 Pipe connectionto sewage pipe INDIVIDUAL B permitwith SPAN (West Malaysia)
CE20 Water supply system Pipe connectingandinstallationlicensefromJKR Sarawak
Water supply system&internal
CE20 Mains pipe installer license(For Sabah)
water pipe installation
CE29 Scaffolding installation Registered scaffolderwithDOSH
M16 Tower cranes RegistrationwithDOSH
Registrationwiththe Energy Commission (EC)
B20 Installationof gas pipe inbuildings
A/B/C class, H form
Private pipe connectionto
B25 B permitfrom SPAN, except for Sabah & Sarawak
sewerage
Maintenanceandrepairof water
B27 D permitfrom SPAN (Companies), except for Sabah& Sarawak
supply systemor sewerage system
CE09 Oilor gas pipelines Registrationwith (DOSH)/Energy Commission A/B/C class, H form
CE19 Sewerage system SPAN C1, C2, C3 orC4 Permit(West Malaysia)
CE20 Water supply system COMPANY SPAN C1, C2, C3 orC4 Permit(West Malaysia)
CE25 Rock explosion work Explosives technician cardfrom PDRM
CE38 Maintenanceof sewerage system D permitfrom SPAN (Companies), except for Sabah & Sarawak
Maintenanceof water supply
CE39 D permitfrom SPAN (Companies), except for Sabah & Sarawak
system
M03 Liftsand Escalators RegistrationwithDOSH
M08 Heat recovery system RegistrationwithDOSH
ME SPECIALIZATIONS WITH OTHER AGENCIES
NO COMPETENT PERSON E03 E05 E06 E10 E11 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E32 E33
1 CHARGEMANA0/L1/L2
2 CHARGEMAN A1
3 CHARGEMAN A4-2
4 CHARGEMANB0-2
5 CHARGEMANB0-2 11KV
6 CHARGEMANB0-2 33KV
7 CHARGEMANB0/H2 11KV
8 CHARGEMANB0 33KV
9 CHARGEMAN B1
10 CHARGEMAN B4
11 ELECTRICALENGINEER 33 KV
COD EVIDENCE /
NO CCD EVENTS DESCRIPTION CCD POINTS
E DOCUMENTS
1 Convention, forum, Attendingrelated convention, conference,
seminar, workshop, forum, seminar, workshop, short courseand
lecture, technical visit, program,organized by CIDB andrelated Certificate of
course, training a government agencies, as a participant attendance /
i. 2 days or more 25 confirmation letter
ii. full day 15
iii. half day 10
Attendingrelated convention, conference,
forum, seminar, workshop, short courseand
program,organized by other Certificate of
b
partiesrecognized by CIDB,as participant attendance /
i. 2 days or more 20 confirmation letter
ii. full day 10
iii. half day 5
Technical visit / internationalinvestment
c mission organized by CIDB or other related 15 Confirmation letter
parties recognized by CIDB
Contractor certified trainingcentre(PLBK)
i. Contractor Management Course (4/5
days 40 Certificate of
ii. B28 Contractor Management Course attendance / SKP
(2 days) 25
SKP
d Certified training centre(PLB)
i. Youth training 40 SKK
Safety Induction for Construction Worker Certificate of
course (SICW) 10
attendance
Certificate of
IntegrityCourse 10
achievement
Accreditation Program (Local employee)
Certificate of Skills
e i. Training&accreditation 40
Competency (SKK)
ii. Accreditation only 15
2 Involvementin CIDB 20 Confirmation
a CIDB board of directors
development programs (per year) letter&attendance list
b CIDB committee member (group; specialist / 20 Meeting invitation letter
specific / activity, etc.) (per year) / appointment letter
c CIDB's mediator, adjudicator, etc. 20 Accreditation certificate
10 Assessment
i. Participationin CIDB-organized
ofparticipation
competition (MCIEA, PKM,etc.)
d declaration
ii. Booth exhibitionin CIDB organized
10
programs
Confirmation letter
Participation in CIDB-organized evaluation
e 15 Evaluation certificate
programs (SCORE, SHASSIC, QLASSIC)
Certificate/ letter/
f Construction industrysurvey by CIDB 5
otherdocuments
COD EVIDENCE /
NO CCD EVENTS DESCRIPTION CCD POINTS
E DOCUMENTS
3 Keynote orpaperwork Speaker, chairman or panel member in the
presentation, etc. preparation andpresentation of keynote or
Offer letter /
paperwork forconference, convention,
appointment letter /
forum, seminar, workshop, course,etc.
certificate
a Organizedby CIDB 15
b Organizedbyother CIDB recognized parties 10
4 Service to the (per year)
Registered ownerof construction companies
profession
serving construction societies / associations
recognized by CIDB; at national or state
level
a Confirmation letter
i. President
10
ii. Vice President
10
iii. Committee member
10
iv. Ordinary member
5
Representing theassociationfor any official
b 5 Confirmation letter
event
5 Book or Book publicationrelated to theprofession,
articlepublication / a 20
100 pages or more
articlepublicationin Confirmation letter /
journal, magazine or Book publicationrelated to the profession,
b 15 printed
news related to the less than 100 pages
material&publication
profession
Book publicationrelated to
c 10
theprofession,less than 30 pages
6 Contributionto Confirmation
a Attendingassociation annual general
construction-related 5 letter&proof of
meeting at national, state andbranch level
association activities attendance
7 Other Awardsandrecognition by CIDB-recognized
a bodies / institutions (i.e. MCIEA, ISO 9001, 40 Accreditation certificate
14001, 18001)
CorporateSocial Responsibility (CSR)
Letter/declarationorothe
(i.e.construction related community service, 10
rsupporting documents
b etc.)
Practical / industrial training(on thejob Offer letter&Acceptance
10
training) letter
Foreign Equity
3. This also applies fortreaties under the Free Trade Agreement (FTA) as follows:
(a) Malaysia – Australia – foreign equitynot exceeding 49%
(b) ASEAN – Australia-New Zealand – foreign equitynot exceeding 49%
(c) ASEAN – Korea – foreign equitynot exceeding 30%
(d) ASEAN – China – foreign equitynot exceeding 30%
(e) Malaysia – Pakistan – foreign equitynot exceeding 49%
(f) Malaysia – Japan– foreign equitynot exceeding 30%
(g) Malaysia – New Zealand – foreign equitynot exceeding 49%
(h) Malaysia – India Comprehensive Economic Cooperation Agreement
foreign equitynot exceeding 51% forG7 contractors.