Вы находитесь на странице: 1из 8

BOILER DAILY CHECK SHEET(2019)

BOILER MODEL: SERIAL NO.: BOILER NO.:

DATE (MONTH/DAY) / / / / /

OPERERATOR AND SIGNATURE

OPERATION SWICH (STERT TIME) TIME : : : : :


OPERATION AWICH (OFF TIME) TIME : : : : :
ALWAYS SWICH THE MAIN POWER BREAKER ON
(MICROCOMPUTER TYPE BOILER SOFTENER) ○ SIGN
SOFTENER WATER PRESSURE (INLET MORE THAN 0.2MPa) GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG
CHECKING FOR WATER SOFTNESS
BOILER (BEFORE AND AFTER BOILER OPERATION) ○ SIGN
ROOM CHEMICAL FEEDAR OPERATION GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHECK FOR CHEMICAL LEAKAGE GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHECK THE CHIMNEY GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHECK PRESSURE GAUGES (GAS) GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

HALF BLOW DOWN TIME : : : : :


LOW WATER LEVEL INTERLOCK TEST GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHECK BOILER CONDITION GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

BOILER CHECK THE GAS PRESSURE GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHECK FOR ABNOMAL SMELL AND NOISE GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

CHIEK FOR ANY SUDDEN FLCTURATION IN WATER LEVEL GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG GOOD / NG

RECOMMENDAITIONS TO THE OUSTOMER CHECK THE TIMER REPLANISH SOLT


REPLANISH CHEMICAL O
REPLANISH CHEMICAL O
SETTINGS OF THE TO THE BRINE TANK
SOFTENER
DATE : TECHNICIAN: DATE / DATE / DATE / DATE /
CHEMICAL L
L
GOOD / NG Kg L
L
SOLT WATER L
:

/ /

: :

: :

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

: :
GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

GOOD / NG GOOD / NG

OTHER ISSUES
OTHER ISSUES

DATE / DATE /
PHILIPPINE TONAN CORPORATION
Cebu Factory(Main)
3rd St., Mactan Economic Zone 1,
Ibo, Lapu-Lapu City 6015, Cebu, Philippines

PRESS DAILY CHECK SHEET(2019)

Press Model: Serial No.: Press No.:

Date (Month/Day) / / / / / /
Operator and Signature
Operation Switch (Start Time) Time : : : : : :
Operation Switch (Off Time) Time : : : : : :
Check for Hydraulic Oil - level Indicator
Good/NG Good/NG Good/NG Good/NG Good/NG Good/NG Good/NG
HYDRAULIC

(Replenish hydraulic oil if necessary)


Hydraulic lines and fittings (Check for oil leaks) Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
Check for Oil temperature
Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
(Operating temperature should be around 120°F)
Check for Pressure Gauges Good/NG Good/NG Good/NG Good/NG Good/NG Good/NG Good/NG

Inspect press structure for signs of wear


Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
(Check for Structural cracking and loose or missing bolts)
MECHANICAL

Check for press arm to ensure it is moist but not dripping oil Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
Check for lubrication on guided patterns Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
Keep your machine clean
Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
(Remove dust and oil specially the die table)
Check for Safety System
ELECTRICAL

(light curtains, interlocking gates, safety mats, etc., Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG
also test the E-Stop Safety Circuit)
Check electrical panel (Clean up loose wiring in cabinet) Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG Good / NG

Recommendations to the Management


Replenish Hydraulic Oil Other Issues

Date : Technician: Date / Date / Date /


Hydraulic Oil L
L
L
L
L
/


Good/NG

Good / NG

Good / NG

Good/NG

Good / NG

Good / NG
Good / NG

Good / NG

Good / NG

Good / NG

Date /

Вам также может понравиться