: Initials:
Quality Control Plan Date:
4/ 11-09
Date: Fejl! Ukendt
argument for
parameter.
Page: 1/4
Dokument 3
Rev. : 0 Rev.: Initials:
Quality Control Plan Date:
4/ 11-09
Date: Fejl! Ukendt
argument for
parameter.
Page: 2/4
8 Inspection half-finished
products
- Dimension control
- Trial assembly
- Surface treatment
9 Final Release for H
Manufacturing
Dokument 3
Rev. : 0 Rev.: Initials:
Quality Control Plan Date:
4/ 11-09
Date: Fejl! Ukendt
argument for
parameter.
Page: 3/4
Dokument 3
Rev. : 0 Rev.: Initials:
Quality Control Plan Date:
4/ 11-09
Date: Fejl! Ukendt
argument for
parameter.
Page: 4/4
18 ERECTION: H
- Control of torque Statical Calculation Method Statement
moment for bolts at the
shell flanges BS 4076 / IVS 104
- Control of the tightening
of the anchor bolts.
- Check alignment with
Theodolite
- Control of the liner
connections
bolted/welded.
- Control of the
connections/carriage of
safety ladder.
- Paint, repairs of flanges,
edges and damages. Acknowledgement of Receipt H H/R
- Packing/sealing of shell
flange.
- Final Take Over
Dokument 3
Rev. : 0 Rev.: Initials:
Quality Control Plan Date:
4/ 11-09
Date: Fejl! Ukendt
argument for
parameter.
Page: 5/4
Definition Key
H = Hold Point. : Steelcon must not proceed past this point until the task is signed for that stack section.
R = Document Review.
W = Witness: Inspector to witness if available at the time of activity. Steelcon to proceed if the inspector is not available.
Dokument 3
This document was created with Win2PDF available at http://www.win2pdf.com.
The unregistered version of Win2PDF is for evaluation or non-commercial use only.
This page will not be added after purchasing Win2PDF.